§ 4.1 — Development Process – General

Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Unified Development Ordinance § 4.1

Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/8b69d2e2-296a-4913-a8ca-9c365c3cac92

SECTION 4.1: Development Process – General

This section sets forth application and review procedures required for obtaining development approval and permits as may be required. Although each development is different, the general development process is as follows. Not all of these steps apply to all projects. This generic process is for information purposes only. The Planning Department can assist with determining exactly what step and process a particular development will need to get approval and permits. A. Preapplication 1. Fact Finding – The developer will usually call or meet with the City development review staff early in their process to gather information. At this time, usually the developer does not have specific information on the development, but are mainly offering scenario to determine feasibility or the best approach for the project. 2. Preapplication Conference – A preapplication conference is not required, but is highly encouraged by the City. This is a meeting between City staff and the developer to discuss specific information and requirements can be obtained prior to submittals being generated and an application being submitted. B. Application 1. Application Submittal – The developer will submit the required application for the proposed activities along with all required attachments such as plans, flood related documents, stormwater documents, outside agency permits, etc. 2. City Staff Review – Once the application is received, the appropriate City staff will review the information and notify the applicant of any missing information or corrections needed at that time. The applicant will also be notified at this time of any required Public Hearings or other special processes needed. 3. Site Visit – City staff will visit the site if needed to verify existing site conditions. C. Public Hearing and Other Special Processes Conducted 1. Determination – Staff will determine if any special processes need to be conducted during their initial review of the application such as a Conditional Use, Master Development, Subdivision, etc. These processes will need to be completed prior to a construction permit being issued. 2. Application – The developer will need to provide application and supporting documents for any special processes. 4. Staff Review - Once the applications are received, the appropriate City staff will review the information and notify the applicant of any missing information or corrections needed at that time. The applicant will also be notified of the date and time for any public hearings and the general process. 3. Approval Process – See specific procedures for special processes throughout this Article of the Ordinance. D. Permitting 1. Final Submittals – Once all comments are addressed by the developer, any corrected documents or paperwork are submitted to the City. 2. Final Staff Review – Staff will review the documents and comments until all deficiencies are corrected. 3. Permits Issued – Once all submittals are correct and received and all special processes are complete, the developer’s contractor may apply for permits. Once permits are issued, construction may begin. E. Construction 1. Inspections – During construction, the contractor will notify the City when required inspections need to be performed. 2. Construction Paperwork – The contractor will provide the City with any needed paperwork during construction such as stormwater forms, and flood related paperwork, etc. F. Close-Out 1. Final Inspection – Once construction is complete City staff will inspect the project for compliance. Comments will be provided if any deficiencies are noted. 2. Final Paperwork – The developer will provide any necessary paperwork to close the project out such as: flood related documents, outside agency final approvals, etc. 3. Certification of Occupancy – Once all deficiencies are corrected and all required documentation has been received, the City will issue a Certificate of Occupancy. 4.1.1 Withdrawal of Applications An application for development approval may be withdrawn at any time. Caution: The withdrawal of any application for development approval which occurs after the publication of any notices which may be required by this Code or other law will result in the application losing its relative position in priority for plan review and will require the applicant to resubmit its application at the initial step in the development review process required for the particular development. Such resubmittal will require payment of the necessary fees in order to activate the plan review process and reestablish relative position and priority for plan review. Note: Nothing in this section shall be construed to prevent the Planning Commission or the City Council from delaying action or decision on any application. In the event the Commission or City Council votes to delay review or decision on any application, said application will retain its relative position and priority for plan review purposes. 4.1.2 Warning and Disclaimer of Liability for Staff Review Staff approvals are reviewed only for general conformance with local codes and ordinances. They are not reviewed for accuracy of data or design, nor does the City of Gautier warrant such. These permits and approvals do not relieve the owner nor any of his representatives of the responsibility of compliance with the requirements of all local codes and ordinances. 4.1.3 Prerequisites to Issuance of a Development Permit No development permit shall be issued unless the proposed development activity: A. Conforms to the requirements of this Ordinance; and B. Conforms to the building codes and fire codes as adopted by the City; and C. Conforms to technical construction standards and any other engineering standard for stormwater, sewage, water, streets, traffic and other engineering concerns as may be adopted by the City of Gautier. 4.1.4 Pre-Application Procedures Prior to filing for a formal and scheduled review of proposed development plans, the applicant may request the Planning Director, or designee, to set a time for discussion of the proposed development. Checklists appropriate to the proposed development shall be provided to the applicant by the Planning Director, or designee. In addition, the applicant will be directed to the appropriate City departments or other agencies so that the applicant may obtain information from such department(s) and/or agency(s) prior to filing for formal review.

Ask a question about Gautier law

Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.