§ 4.10 — Future Improvement Payment
Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Unified Development Ordinance § 4.10
Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/83384f33-57b3-49ea-9805-b7bf615de9b3
SECTION 4.10: Future Improvement Payment
The provisions of this section apply to all proposed developments in the City of Gautier or adjacent to public rights-of-way. A. Nothing herein shall be construed as relieving the developer or applicant of any requirement relating to concurrency or maintenance of level of service as may be required by this Code or the Comprehensive Plan. B. This section does not modify existing agreements between a developer and the City for final development orders granted prior to the effective date of this section. C. This section shall apply to situations when improvements cannot be installed or constructed within a public right of way, easement, or City owned property within the City of Gautier, due to circumstances outside of the City of Gautier or the developer's immediate control. Examples of such situations include, but are not limited to, improvements to and along the U.S. Highway 90 corridor and unimproved public rights of way within the City of Gautier and when a City improvement schedule coincides with an adjacent development. 4.10.1 Improvements Required The approval of any development plan shall be subject to the developer providing an assurance payment that all required improvements within a public right-of-way, easement, or City owned property, including, but not limited to, sidewalks, pedestrian tracks or pathways, signage other than traffic control, handrails and permanent striping will be constructed according to the approved development plan at an undisclosed later date by the City of Gautier. The following information shall be provided by the developer: A. The projected total cost for each improvement. Cost for construction shall be proposed by a signed and sealed and dated estimate prepared and provided by the developer's Mississippi Professional Engineer. B. The amount and type of payment provided to assure construction. 4.10.2 Amount and Type of Future Improvement Payment A. The City Manager, or his or her designee, shall be responsible for determining the adequacy of the amount of the payment proposed to be provided by the developer. B. Payment requirements shall be one of the following: 1. Certified check; 2. Cashier’s check; 3. Money order; or 4. Cash. C. The amount of payment shall be one hundred percent (100%) of the total construction cost for the required improvements ("future improvement payment"). D. In addition to the future improvement payment, the developer shall pay an administrative fee. 4.10.3 Sufficiency of Future Improvement Payment A. The payment shall be made prior to the issuance of a development order for commercial projects or a building permit for residential projects. B. At such time that the improvements can be made to the public right-of-way, easement, or City-owned property, the City shall construct such improvements and use the future improvement payment to pay for the costs of the improvements. After completion of the improvements, any unused portion of the future improvement payment shall be returned to the developer. If the future improvement payment is not sufficient to pay for the improvements, the developer shall pay any shortfall to the City. 4.10.4 Final Development Order and Extension of the Commencement of Construction Deadline A final development order is valid for a period of two (2) years from the date of issuance. However, a building permit must be issued for either the construction of infrastructure or construction of the entire project and construction must commence within said two (2) year period after which the permitted development activity may be completed provided the conditions of this section continue to be satisfied. If a building permit is not issued within two (2) years from the date of issuance of the final development order or a building permit is issued and construction has not commenced within two (2) years from the date of issuance of the final development order, then the development order becomes null and void. "Construction of infrastructure" shall be defined as site work, grading, or other construction activity (not including land clearing and grubbing or demolition of existing structures) related to installation of roadways, access drives, parking lots, underground utilities, stormwater or drainage facilities, or building foundations. If construction activity ceases for a period of one (1) year after a building permit for construction of the infrastructure or construction of the entire project has been issued, the development order will be considered null and void. No extensions to this deadline shall be allowed, except as set forth in section 4.11.
Ask a question about Gautier law
Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.
