§ 4.23 — Actions Requiring Approval by Planning Department Staff
Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Unified Development Ordinance § 4.23
Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/fc287995-4bad-4d23-a108-579ac99f2632
SECTION 4.23: Actions Requiring Approval by Planning Department Staff
Certain permits may be issued by Planning Department Staff upon review and approval of the appropriate application and fees: A. Land Alteration and/or Disturbance Permit B. Tree Removal Permit C. Temporary Use Permit D. Conditional Use Permit-Minor E. Permit for Moving of Buildings F. Mobile Home/MEMA Cottage Placement Permit 4.23.1 Land Alterations and Disturbance Permit The purpose of this section is to set forth regulations governing the excavation, clearing and draining of properties within the City of Gautier. Because the alteration of land, particularly large areas, impacts hydrologic characteristics of most land areas, it is imperative that the activity takes into account the immediate and long-term impact of such work on adjoining and downstream properties. Specifically, the intent of these regulations is to assure that any land alteration results in a zero increase in sedimentation and storm water volumes and rates beyond that which existed prior to alteration or disturbance. A. Clearing and grubbing, haul roads, waste areas, plant sites or other areas occupied by the contractor. Clearing and grubbing on erodible areas, including the construction site, or other areas occupied by the contractor in connection with the work shall include adequate protection for preventing excessive erodible material from entering water or waterways on land not occupied by the contractor and preventing dust created by hauling equipment. Temporary measures as required by DEQ and the City shall be employed by the contractor from the beginning of the work. These measures may consist of the expeditious use of brush, vegetation or other residue from clearing and grubbing, temporary or permanent terraces, berms, dikes, dams, sediment basins or other effective means of containing sediment. All temporary or permanent erosion control features shall be maintained in an effective manner so long as essential to the abatement of siltation. B. Loading, hauling and removal of tree limbs and debris on sites less than ten acres 1. All persons, firms or corporations hereafter performing tree removal or trimming services for compensation within the City shall remove and dispose of all debris created by the performance of such services. 2. The debris shall be properly disposed of by the person, firm or corporation performing the services of their agent. Said debris shall be removed within five (5) days of completion of construction activities. C. Excavation Excavations shall be made in an acceptable manner to the City Consulting Engineer and shall be left in an aesthetically pleasing condition when completed: 1. A plot plan, drawn to scale, showing dimension of excavation, depth, slopes, distances from other property and entrances and exits shall be submitted. 2. Excavations shall be dug on a 3 to 1 slope. 3. Topsoil from pits shall be dressed down on slopes and grassed to prevent erosion. 4. Bottom of pits shall be graded in a generally level contour. 5. Edge of slope at ground level shall be no closer than thirty-five (35) feet from any property line, nor closer than three hundred (300) feet from a public road. 6. The maximum depth of the excavation shall be determined by the City Consulting Engineer. 7. Upon approval, a permit for an excavation shall be issued for a one (1) year period and shall be reviewed and considered for additional periods of time by the Planning Commission. D. Land clearing and drainage 1. Parcels of land greater than one (1) acre but less than five (5) acres No parcel of property in excess of one (1) acre but less than five (5) acres or series of contiguous lots the combined area of which exceeds one (1) acre but is less than five (5) acres shall be cleared prior to submitting to the Planning Director a site clearing plan and a Stormwater Pollution Prevention Plan (SWPPP). Such plans shall include but are not limited to access routes, proposed culvert locations, existing drainage systems on the property, plans for future drainage, and measures to address erosion control. Plans of this nature may be included with and made a part of the building permit application. 2. Best Management Practices Erosion and sedimentation controls shall be generally accepted best management practices and may include vegetative fences, silt screens, retention ponds, or other practices deemed appropriate by the Planning Director. The Planning Director may, upon determining that a previously approved erosion control plan is inadequate, issue a stop work notice to the contractor and order corrective measures sufficient to deter siltation of adjoining ditches, properties, or bayous and streams. 3. Parcels of land greater than five (5) acres Proposed new developments in excess of five (5) acres shall not be cleared until an overall project plan and a Stormwater Pollution Prevention Plan (SWPPP) has been submitted to the Planning Director. Such plans shall include detailed storm water run-off control measures including retention and/or detention ponds capable of retaining both "during construction" and "post-construction" sediments and of holding a volume of storm water equal to a five-year (5) storm based on south Mississippi average rainfalls for urbanized areas wherein the rainfall duration is one (1) hour at a rainfall intensity of three (3) inches per hour. Run off shall be drained onsite to retention ponds and allowed to discharge at a rate no greater than the average discharge prior to development. 4. Compliance with City, State and Federal Regulations All clearing of land, excavations and grading shall be conducted in strict compliance with all City regulations including Stormwater Management Policies and State and Federal regulations. E. Land to be Platted Provisions for maintenance of storm water control facilities shall be in accordance with the provisions in Article X. Spillways and discharge systems shall be constructed in accordance with accepted engineering practices and shall be maintained in good working order at all times. 4.23.2 Tree Removal Permit A Tree Removal Permit shall be issued by the Planning Director prior to issuance of a building permit, if the site proposed for development contains trees. All tree removal procedures shall comply with the standards in Article XI. A. Submittal Requirements All plans shall be fully dimensioned, drawn to scale and shall include, at the minimum, the following: 1. The species, size, quantity and location of existing trees to be retained; 2. The species, size, quantity and location of existing trees four (4) inches or more in diameter measured at four (4) feet above the natural ground to be removed; and 3. A detailed landscaping plan, if required. The Planning Director or his/her designee shall review the tree preservation and replacement plan and if found to be in accordance with this Ordinance, approve such plans. B. Factors to be considered for Removal of Trees. The following factors shall be used in determining which trees must be preserved: 1. Native trees on the side including but not limited to oaks, magnolia, cedar, elms and pecan shall take priority in determination of trees to be preserved. 2. The species, size, quantity and location of existing trees to be retained 3. The species, size, quantity and location of existing trees four (4) inches or more in diameter measured at four (4) feet above the natural ground to be removed and the nature and quality of the landscaping to be installed for replacement 4. Topographical constraints on design 5. Drainage, access and egress, and utilities 6. Any factors reasonably related to the health, safety and welfare of the public which necessitated disturbance of the existing natural landscape character 7. The economic usefulness of the property without disturbance of its natural character 8. Any other factors as may be relevant and proper 4.23.3 Temporary Use Permit Temporary Uses which are allowed in accordance with Article VI require a Temporary Use Permit from the Planning Director before the proposed use or activity may begin. The Planning Director may at his discretion elect to take a request for temporary permits to the Planning Commission for review and action should he desire. Applications for a Temporary Use Permit shall be filed with any additional information requested. A. Approval Criteria The temporary use may be approved, conditioned or denied by the Planning Director based on the following criteria: 1. Permission of the owner of the land has been obtained as evidenced by a notarized copy of the owner’s consent; 2. The site is physically suitable for the type and intensity of the temporary land use; 3. The proposed use is compatible with land uses presently on the site; 4. Adequate provisions have been made for sanitary and medical facilities; 5. Adequate provisions have been made for vehicular access and off-street parking as well as emergency access; and 6. Any negative impacts for the proposed temporary use are mitigated. B. Revocation A temporary use permit may be revoked or modified effective immediately upon written notice of violation by the Planning Director if any of the following findings are made: 1. The temporary use permit was obtained by misrepresentation or fraud. 2. One or more of the conditions of the temporary use permit have not been met, or 3. The use is a violation of any statute, ordinance, law or regulations. 4.23.4 Permit for Moving of Buildings No person, firm or corporation shall move any buildings or structures into or within the City or shall remove any building or structure from the City without first obtaining a permit from the Building Official for each such building or structure to be moved or removed. Only a licensed moving company or individual may move a structure. A. Exceptions. Utility buildings and accessory structures proposed for relocation do not require a moving permit provided the structure width does not exceed eight and one-half (8.5) feet. All structures wider than eight and one-half (8.5) feet and proposed for moving over state, Federal or City roads must be permitted by both the City and the State. All structures in excess of twelve (12) feet in width must also be properly escorted when being moved. Applicants for moving permits in the City must present a copy of an approved state permit, if required by city officials, prior to city approval. Building permits must be obtained for any structure proposed for relocation into or within the City of Gautier. B. Application for Permit Applications for a building moving permit may be filed on the appropriate application available from the Planning Department and shall include all requested information, attachments, and submittals. C. Fees Certain fees are required prior to relocation of any structure: 1. Site cleaning fee. A refundable one hundred fifty ($150) deposit is required to guarantee site clean-up following removal of a structure from within the City. It shall be the responsibility of the permit holder to remove all debris, building materials or other objects from the site and to generally clean, and/or mow said property so that no unsightly evidence of the structure remains. Should said property not be cleared within thirty (30) days of structure removal, the City will retain the deposit and may use it to offset any cost incurred by the City to have the property cleared properly. The permit holder is required to notify the Planning Department when properties are cleared and call for an inspection. Upon approval by the inspector, a refund will be returned to the applicant. 2. Moving fee. A non-refundable moving fee of two hundred fifty ($250) shall be paid to the City of Gautier for each structure proposed for moving into or within the City. If the building being moved to Gautier is located outside Jackson County, additional fees will be charged depending on mileage. 3. Building permits fee. A non-refundable building permit fee must be paid upon issuance of a building permit. D. Insurance The mover shall be licensed and bonded and shall file with the City of Gautier a statement of insurance coverage in accordance with state regulations. E. Building permits If in the judgment of the Building Official, a structure sufficiently meets the requirements as set forth in Article XV he may approve the structure to be moved by presenting his/her evaluation report along with his/her recommendation to issue a moving permit to the Planning Director. Said reports shall be presented to the Planning Director no later than three (3) working days following inspection. Upon receipt of the Building Official’s evaluation report, the Planning Director may approve the issuance of a Building Permit in accordance with standard accepted procedures and fees. Said permit must be applied for prior to actual moving of the structure. Should a structure be moved and relocated within the City prior to issuance of the moving permit and the building permit the fees for said permits will be doubled. 4.23.5 Mobile Home/MEMA Cottage Placement Permit No person, firm or corporation shall move any mobile home or MEMA cottage into or within the City without first obtaining a permit from the Building Official. A. General Policies & Procedures Required by the City of Gautier 1. All mobile homes and MEMA cottages must be inspected prior to the issuance of the permit. 2. To receive a pre-permit inspection, a mobile home must be brought to a location within ten (10) miles of the Gautier city limits. 3. Mobile homes must be at least fourteen feet by sixty feet (14’ X 60’) in size, not including tongue. 4. Mobile homes must be a Zone 2 or Zone 3. 5. Mobile home movers are responsible for contacting the Planning Department twenty-four (24) hours before bringing-in, moving-out or relocating a mobile home in Gautier. The mover must provide a route plan, and time of movement. If a mobile home is to be moved in or out of Gautier after City business hours or on weekends, the mover or owner is responsible for any City personnel costs incurred as a result of employees being called in to monitor the mobile home placement. 6. Mobile homes must adhere to all applicable state and federal building and fire code requirements and City of Gautier ordinances, or the unit will not be allowed to enter the Gautier City limits. 7. If any of the above procedures and requirements are not followed, or if damage to City property occurs during the moving of any mobile home, deposits may be forfeited and additional damages may be assessed through any legal means possible. B. Application for Mobile Home Placement Permit Applications for a Mobile Home Placement may be filed on the appropriate application available from the Planning Department and shall include all requested information, attachments, and submittals. C. Process for Inspection of Mobile Homes and Criteria Applicants should call 228-497-1878 to arrange for an inspection. No specific time will be guaranteed for inspection of mobile homes. Inspections will be performed as soon as time and routing allows. The following items must be inspected and found satisfactory prior to the connection of electricity being approved. 1. Must be structurally sound 2. No damaged or missing panels or flashing 3. Paint or outer coating must be clean, undamaged and unstained 4. All windows and doors must be undamaged and operational 5. No insect, bug or rodent infestation 6. Placement within approved setback lines 7. Tie-down installation 8. Power pole installation and service to mobile home electrical panel 9. Sewer system installation and connections 10. Health and safety issues inside and outside of mobile home 11. Mobile homes within a flood zone require permanent foundation (Dry stacked. Blocks do not meet this requirement) 12. Drive and parking 13. Skirting – shall be installed after tie-down inspection and shall be kept in good condition for the life of the mobile home placement. a. Mobile home skirting shall be manufactured specifically for intended use or similar to item b.ii. below. b. MEMA cottage skirting: i. Split face or painted masonry chain wall foundation with venting per Building Code. ii. Masonry pier foundation shall be in-filled with painted treated wood or vinyl lattice in square or diamond pattern, or one (1) inch minimum painted treated wood slat or rail panels. All skirting shall be supported by two (2) inch minimum treated wood framing suspended from structure with one and one-half (1 ½) inch minimum ground clearance. The design of the skirting shall be of uniform consistency around the entire structure. 14. Stairs and landings. Landing must be a minimum of four feet by six feet (4’ X 6’) in size and shall apply to all mobile home entrances. 15. Building codes require house numbers to be attached to the structure. E. Additional Regulations Regarding Mobile Homes and MEMA Cottages All of the following regulations shall also apply to Mobile Homes and MEMA Cottages except where noted. 1. All mobile home lots shall abut upon a driveway of not less than twenty (20) feet in width, which shall have an unobstructed access to a public street which shall be classified as a collector or arterial street as defined by the City of Gautier. 2. All streets, roadways and driveways within a mobile home park shall be sufficiently illuminated at night with street lights. 3. In Mobile Home Subdivisions, only one (1) modular or mobile home shall be permitted per lot. 4. Each mobile home residence must have two (2) areas for parking of vehicles. F. General Notes 1. Commencement of any work, prior to obtaining the required permits will result in doubling of all applicable permit fees. 2. Mobile Home permits will be void ninety (90) days from issuance date. 3. Separate permits are required for both electric and plumbing. 4. The National Electric Code requires a four (4) wire hook-up. A separate neutral and ground wire must be run. A 100-amp service requires a four (4) wire hook-up in conduit with three (3) #4 and one (1) #6 wires. A 200- amp service requires two (2) 2/0 wires, one (1) 1/0 and one (1) #6 ground wire in conduit. These wires must be in PVC or rigid conduit. 5. Power poles must be a minimum of three (3) feet and a maximum of thirty (30) feet from the mobile home. 6. Placement of all mobile homes shall comply with the requirements of the 2006 International Residential Code, Mississippi State Regulation MH-5, and the Code of Federal Registry 24CFR and 44CFR and the ordinances of the City of Gautier.
Ask a question about Gautier law
Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.
