For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.8 — Operating Plan

Gautier Unified Development Ordinance (cover updated June 19, 2025); partial · Gautier Landfill Site Ordinance § 4.8

Corpus is an independent public-information project, not the official City of Gautier website. Stable reference: corpuslaw.us/code/39551d7e-2c5d-4707-a714-e1842572d53a

4.8. Operating Plan.

The application for permit shall contain an operating plan for the landfill facility that shall include, at a minimum, the following components, in this order: 1. Types of Waste. The operating plan shall include a detailed description of the types of waste and volumes of each waste type accepted at the facility. It shall also include the waste screening measures employed by the facility to ensure that unauthorized wastes are not accepted. This discussion shall include, but not be limited to: a. A list of all the types of waste and the daily volumes of each waste type accepted or proposed to be accepted at the landfill facility. The list shall be specific and shall not include terms such as “other”, “general”, “miscellaneous”, or similar terms that are vague in nature. Each item included in the list of waste types shall be accompanied by a description of the materials. b. A description of the service area from which the different types of waste will be accepted. c. A waste screening plan that provides for monitoring and random inspection of waste entering the landfill facility. d. An emergency response plan for the immediate segregation and removal of all unauthorized wastes from the landfill facility. 2. Fire Prevention. The landfill facility shall comply with the requirements of the City of Gautier and all applicable local, State and Federal laws and regulations relating to fire prevention. The operating plan shall include a Fire Prevention and Response Plan. At a minimum, the Fire Prevention and Response Plan shall include: a. A description of the safety measures employed to prevent fires. b. The location and handling procedures for flammable liquids and chemicals stored at the landfill facility. c. Details and specifications for a fire detection system for the landfill facility. d. Specifications and locations of all fire suppression equipment including, but not limited to, extinguisher, pumps, hoses, soil stockpiles, etc. e. A description of the responsibilities of all employees in the event of a fire. 3. Emergency Communications. The operating plan shall contain a description of an emergency communication system. This description shall include, but not be limited to: a. A listing of all equipment available for routine communications and emergency communications. b. A listing of authorities that may be contacted in the event of an emergency situation. c. A description of the internal chain-of-command in the event of an emergency, including a description of responsibilities. 4. Bird, Rodent and Vector Control. The operating plan shall contain a plan for the effective prevention and control of rodents and vectors. At a minimum, this plan shall include: a. A minimum of monthly inspections of the entire landfill facility for rodents and other vectors. A record of the most current inspection and eleven previous inspections shall be maintained at the landfill facility. b. A detailed description of all measures employed to prevent infestation by rodents and vectors, including good housekeeping practices used to control rodents and vectors. c. A detailed description of all measures and controls employed (e.g. bait stations and traps) to provide for the control of rodents and vectors. 5. Odor Control. The operating plan shall provide a plan for the prevention and treatment of malodors from the landfill facility. This plan shall include, but not be limited to: a. A description of the methods employed at the facility to prevent malodors from migrating off-site, including an assessment of the effectiveness of such methods. b. A description of the response measures taken once malodors are detected off- site including an assessment of the effectiveness of such measures. c. A plan for the handling of extremely noxious waste materials. 6. Litter. The operating plan shall describe all methods used to curtail windblown materials, including the following: a. The use of structures, fences, natural barriers, or other devices used to prevent material from blowing off-site. b. Operational plans for the prevention of material blowing off-site. This may include the use of manual labor pickers, mechanical collection devices, the use of portable fences, or the temporary closure of the facility on windy days. c. A plan to prevent litter on traffic arteries to and from the landfill facility. 7. Dust Control. The operating plan shall describe in detail all methods used to adequately control and minimize any dust emissions occurring both on-site and off-site, including the following: a. A detailed description of available staffing and all equipment/devices that are maintained on-site and are dedicated for dust control (e.g. location of water sources, water hoses, mechanical street sweepers, water truck, and brooms.) b. Operational plans for the prevention or minimization of dust emissions on-site and offsite. This may include the use of watering devices, water truck, brooms, and mechanical street sweepers. 8. Hours of Operations. The operating plan shall specify the hours of operation of the landfill facility. Those facilities requesting authorization for 24-hour per day operations shall provide information justifying the need for said authorization. 9. Groundwater Monitoring Plan. The operating plan shall contain a comprehensive groundwater monitoring plan demonstrating that the groundwater monitoring system is capable of detecting a release from the facility. 10. Erosion Control. The operating plan shall demonstrate that erosion at the site is minimized. This demonstration shall include: a. Descriptions of the methods used to prevent erosion at the site. b. Drawings, design details, calculations, and specifications of drainage structures at the site. The drainage structures shall be sized and designed to accommodate the25 year, 24 hour precipitation event without damage to the drainage structures or erosion of the facility.

Ask a question about Gautier law

Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.