4.9. Closure Plan.

The application shall contain a closure plan to be implemented when waste activities cease at at the landfill facility. The closure plan shall include, but not be limited to: 1. Closure Plan Activities. The closure plan shall include a listing of activities that will occur when waste related activities cease at the landfill facility including a listing of materials necessary for closure and a schedule for the completion of the closure activities. 2. Waste Removal Plan. A plan for the removal of all waste material that is not intended to be disposed of at the facility. 3. Equipment Decommissioning. The closure plan shall include a plan for the decommissioning and cleaning of all equipment and structures at the facility that contacted waste materials. 4. Construction Quality Assurance Plan. A construction quality assurance plan for the construction of the final cover system and any other structures associated with closure. These shall include a gas management system, leachate collection system, erosion control, and groundwater monitoring system. 5. Third-Party Procedures. Procedures for the certification of closure by a third-party, independent professional engineer. 6. Aerial Photo. A provision for a color aerial photo of the landfill upon completion of the closure activities including establishment of vegetation on the landfill. 7. Cost Estimates. The closure plan shall include cost estimates for the completion of all closure activities. The cost estimates shall be based on the cost necessary for closure at anytime during the life of the facility and shall not be discounted to current values. The cost estimate should reflect a worst case scenario. 8. Financial Assurance. Documentation that financial assurance is available to complete all closure activities. The financial assurance must be greater than or equal to the closure cost estimate total determined in Section 4.6.7. 9. Post-Closure Activities. A listing of post-closure activities that will occur when closure of the facility is complete including a schedule and cost estimates for the implementation of the proposed post-closure activities. 10. MDEQ Closure Plan Certification. The City Manager may require additional information be submitted if it is determined that the information in the application is insufficient or if the nature of the landfill facility warrants additional information to ensure the facility can be operated as proposed.

Ask a question about Gautier law

Corpus searches the Gautier sections it holds and shows the ones that match, with their citations. Free, no sign-in.