Sec. 14-221. - Applicability and authorization.

(a) Covered discharges. This division covers all discharges from construction activities designated in section 14-188. Additionally, the public works director shall review every application for a building permit to determine the potential for contribution to a violation of a water quality standard or for significant contribution of pollutants to waters of the city and shall designate the BMPs to be used during construction or may require an erosion and sediment control plan to be developed and submitted to the city. (b) Obtaining authorization. Owners or operators are authorized to discharge stormwater associated with construction activity under the terms and conditions of this article after development of the required erosion and sediment control plan and after obtaining a site development permit. (c) On-going construction activities. Projects that are on-going as of the effective date of the ordinance from which this section is derived must submit the required erosion and sediment control plan and obtain the necessary permit. (d) Allowable non-stormwater discharges. See section 14-189. (e) Responsibility compliance. The owners of the property and any operators associated with the construction activity on the property shall have joint and several responsibility for compliance with this division. (f) Exceptions. This section does not authorize: (1) Discharges of hazardous substances or oil. This division does not authorize the discharge of hazardous substances or oil resulting from an on-site spill. (2) Post-construction discharges. This division does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site has undergone final stabilization. (3) Discharges threatening water quality. This division does not authorize stormwater discharges from construction sites that the public works director determines will cause, or have reasonable potential to cause or contribute to, violations of water quality standards. However, the city may authorize coverage under this section after appropriate controls and implementation procedures designed to bring the discharges into compliance with water quality standards have been included in the erosion and sediment control plan. (4) Discharges to impaired receiving waters. The erosion and sediment control plan must specifically identify BMPs which ensure stormwater will not cause or contribute to nonattainment of a water quality standard. In cases where the city becomes aware of potential impairment due to construction activities, the city may require the amendment of the erosion and sediment control plan in order to require additional BMPs sufficient to comply with requirements of this division or any other requirements of the city.

(Code 1974, app. D, § 301; Ord. No. 2004-365, §§ 1, 2, 10-19-2004)

Ask a question about Pearl law

Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.