§ 14-224 — Limitations and requirements
Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-224
Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/97a54fab-0c0b-400e-bfa0-8f2526ef9759
Sec. 14-224. - Limitations and requirements.
(a) Nonnumeric limitations. Stormwater discharges shall be free from: (1) Debris, oil, scum, and other floating materials other than in trace amounts; (2) Eroded soils and other materials that will settle to form objectionable deposits in receiving waters; (3) Suspended solids, turbidity and color at levels inconsistent with the receiving waters; and (4) Chemicals in concentrations that would cause violation of the water quality criteria set by the state in the receiving waters. (b) Implementation requirements. The owner or operator shall: (1) Implement the erosion and sediment control plan as required; (2) Install downslope and perimeter controls before any major land disturbing activities; (3) Install needed erosion controls even if they may be located in the way of subsequent activities, such as utility installation, grading or construction. It shall not be an acceptable defense that controls were not installed because subsequent activities would require their replacement or cause their destruction; (4) Implement controls as needed to prevent erosion and adverse impacts to receiving streams and shall install additional or alternative erosion and sediment controls when existing controls prove to be ineffective in preventing sediment from leaving the site; (5) Maintain all erosion and sediment controls. At a minimum, accumulated sediment shall be removed from controls when it reaches one third to one half the height of the control and properly disposed. Nonfunctioning controls shall be repaired, replaced or supplemented with functional controls within 24 hours of discovery or as soon as field conditions allow; (6) Implement the appropriate temporary or permanent vegetative practices within five days when a disturbed area will be left undisturbed for 30 days or more; (7) Minimize off-site vehicle tracking of sediments; (8) Remove any off-site accumulations of sediment at a frequency sufficient to minimize off-site impacts (e.g., fugitive sediment in street could be washed into storm sewers by the next rain or pose a safety hazard to users of public streets); and (9) Comply with applicable state or local waste disposal, sanitary sewer or septic system regulations. (c) Inspection requirements. Inspection of all erosion controls and other erosion and sediment control plan requirements shall be performed during land disturbing activities. Inspections shall be performed: (1) At least once a week; (2) Within 24 hours of the end of a storm event of one-half inch or greater; and (3) As often as is necessary to ensure that appropriate erosion and sediment controls have been properly constructed and maintained and determine if additional or alternative control measures are required. (d) Documentation of inspections. The documentation and inspections required herein shall be completed by the engineer representing the owner, operator or developer during construction and submitted upon application for the first approval of any plat or any other time requested by the city. Such inspections must be documented and certified as required in this section. Documentation must include the day and time the inspection was performed, who performed the inspection, any deficiencies noted, and corrective action needed. Documentation of all inspections must be kept with the erosion and sediment control plan. Inspections must continue until the time that planned construction activities have been completed, land disturbing activities have ceased and disturbed areas have been stabilized with no significant erosion occurring. (e) Retention of records. All records, reports and information resulting from activities required by this section shall be retained by the owner or operator, on-site if practicable, for a period of at least three years from the latter of the date construction was completed or the date of approval of the final plat. (f) Noncompliance reporting. (1) Anticipated noncompliance. The owner or operator shall give at least ten days' advance notice, if possible, before any anticipated or planned noncompliance with permit requirements. Giving notice of planned or anticipated noncompliance may not immunize the owner or operator from enforcement for that noncompliance. (2) Unanticipated noncompliance. The owner or operator shall notify the city orally within 24 hours from the time he becomes aware of unanticipated noncompliance. A written report shall be provided to the city within five working days of the time he becomes aware of the circumstances. The report shall describe the cause, the exact dates and times, steps taken or planned to reduce, eliminate, or prevent reoccurrence and, if the noncompliance has not ceased, the anticipated time for correction. (3) Termination of permit requirements. Upon successful completion of all permanent erosion and sediment controls for a construction project a written notification of such shall be submitted to the city. All inspection forms required by the city must be attached. Coverage is not terminated until done so in writing by the city.
(Code 1974, app. D, § 304; Ord. No. 2004-365, §§ 1, 2, 10-19-2004)
Ask a question about Pearl law
Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.
