Sec. 27-1618. - Landscape plan.
A. Applicability. Landscaping in compliance with this zoning code shall be required for any new construction, and expansion of existing structures. All plans submitted in support of a building permit or zoning compliance permit shall include a landscape plan where required. No landscape plan submittal is required for any one- or two-family building permit applications except those located within a development covered by a master site plan approval (section 27-1619). Any building permit for a one- or two-family dwelling within a master site plan approved location shall indicate on the site plan the landscaping required by the approved master site plan. B. Authority. A landscape plan may be submitted for review by a property owner or the property owner's agent, including the landscape professionals described in subsection 27-1618.C. [image omitted; see the official code] Figure 27-1618.A. Landscape Plan C. Procedures. 1. Common procedures. Common procedures for landscape plan review are identified in Table 27-1600.1 and are summarized here for applicant convenience. 2. Specific procedures. Landscape plans shall be prepared as follows: (a) Lots of one and one-half (1.5) acres or larger: The plan shall be prepared by a Montana licensed landscape architect. (b) Lots smaller than one and one-half (1.5) acres: The applicant is encouraged to work with a nurseryman or landscape design professional to meet the requirements of this article. D. Decision criteria. The zoning coordinator may approve a landscape plan upon a finding that the application meets all of the following criteria, as applicable: 1. The landscape plan conforms to all requirements of this article and is consistent with the currently adopted land use plan and future land use map and any other applicable plans. 2. The landscape design includes the installation of a diversity of species and sizes of vegetation with preference given to locally naturalized vegetation. 3. Preservation of existing, locally naturalized vegetation is incorporated into the landscape design. 4. No plant materials or landscape features are situated in such a manner so as to inhibit clear sight areas established in subsection 27-1802.H or otherwise create a traffic hazard. 5. The facilities for watering and drainage are adequate to ensure the landscape area is maintained and that no soil, bark, mulch, gravel, stone, or similar materials are allowed to wash off the landscape area into parking areas, driveways, public streets, sidewalks, gutters, or storm drainage facilities. E. Post approval. 1. Site specific and binding. Approved landscape plans shall be binding upon the applicants and their successors, transferees, and assigns. No planning division approval of a certificate of occupancy shall be issued for any building or structure where landscaping has not been provided and continued in accordance with the required and approved landscape plan, or any approved modifications thereto, or the plan has not been guaranteed through a performance bond or approved security as provided below. 2. Landscaping installed within one year of issuance of building permit. (a) All landscaping and screening material, organic and inorganic, shall meet the standards of section 27-1210 and be in place prior to the issuance of a certificate of occupancy. Irrigation systems shall be fully functional at the same time as the completion of the landscape planting. This requirement shall be verified by the submission of a final, as-installed landscaping plan by the party responsible for the creation of the landscape plan that is submitted with the certificate of occupancy application. (b) If the timing of the project and seasonal limitations prevent planting prior to issuance of the certificate of occupancy, security as described in this section may be provided and the planting period may be extended accordingly. 3. Security required. (a) When the timing of a project delays the installation of the landscaping, a performance bond or letter of credit in an amount of one hundred fifty (150) percent of the landscaping materials and labor costs that does not expire for at least one year from the date of issuance shall be posted with the planning and community services department to ensure the placement of the required landscaping. (b) The property shall be inspected by the zoning coordinator to make sure that the required landscaping has been planted before release of the security bond or letter of credit. 4. Administrative relief. Administrative relief is provided to add flexibility in the application of a specific landscaping regulation when a standard is inapplicable or inappropriate to a specific use or design proposal. Administrative relief may be applied up to a total of ten (10) individual landscape standards for any site. The application shall follow the procedures in section 27-1614, Administrative relief. (a) Policies. (1) The planning division recognizes that the specific landscape requirements in article 27-1200 cannot and do not anticipate all possible landscape situations. In addition, the planning division recognizes that there may be landscape proposals which conform to the purpose, intent and objectives of the landscape regulations, but were not anticipated in the specific regulations. Therefore, the planning division may grant administrative relief in the event of these situations and proposals. (2) The reasonable development of a site may require the granting of administrative relief to some of the requirements. Although all of the categories of landscape requirements are considered important, the planning division generally assigns the following priorities for compliance with the landscape requirements: (i) First, adjacent residential uses should be buffered; (ii) Second, an attractive appearance of the project should be provided along adjacent streets by landscaped setbacks and trees; (iii) Third, the parking areas and building elevations which form major public views of the project should be visually softened and enhanced by trees and other plantings. (3) Compliance with the requirements, such as the third priority above, should not be "forced" into a site design. For both visual effect and ease of maintenance, relatively few, but larger landscaped areas, which are integrated with the other elements of the site design, are generally encouraged. In addition, relatively numerous and smaller landscaped areas, which are not integrated with the other elements of the site design, are generally discouraged. (4) However, the granting of administrative relief should not always mean that a requirement is reduced without compensation. For example, the granting of a reduced buffer-yard depth should be compensated by the planting of additional trees, shrubs or other plants. (b) Application. (1) A written request for administrative relief shall be submitted following the procedures in section 27-1614. The written request shall include a justification in terms of the findings necessary to grant administrative relief. The written request with decision shall be attached to the plan or retained in the applicable file, as appropriate. (2) The zoning coordinator must make all of the following findings in order to grant administrative relief: (i) The strict application of the regulation in question is unreasonable given the development proposal or the measures proposed by the applicant or that the property has extraordinary or exceptional physical conditions that do not generally exist in nearby properties in the same general area and such conditions will not allow a reasonable use of the property in its current zone in absence of relief; (ii) The intent of the landscaping section and the specific regulation in question is preserved; (iii) The granting of the administrative relief will not result in an adverse impact upon surrounding properties; and (iv) Proportional compliance is not appropriate for the location and development planned. (3) The zoning coordinator shall render a decision on the request within thirty (30) calendar days of receipt of the request and all required information. An appeal of the zoning coordinator's decision may be made in accordance with section 27-1616.
(Ord. No. 21-5748, § 3(Exh. A), 1-25-21; Ord. No. 23-5853, § 3, 10-9-23; Ord. No. 26-5930, § 1, 5-26-26)
Ask a question about Billings law
Corpus searches the Billings sections it holds and shows the ones that match, with their citations. Free, no sign-in.