Sec. 27-1625. - Wind and solar facilities.

A. Application types. Tier 2 wind and solar facilities are processed through section 27-1620, Permits. Tier 3 wind and solar facilities are processed through section 27-1623, Special review use. B. Additional information. Both applications shall include the following information: 1. Approved net metering agreement(s) and copies of applications to or approved permit from applicable state and federal agencies. 2. A landscape plan showing that all areas occupied by the facility that are not utilized for access to operate and maintain the installation shall be planted and maintained with a native shade tolerant grass or other vegetation for the purpose of soil stabilization or other methods approved by the zoning coordinator. 3. A storm water management plan showing existing and proposed grading and drainage demonstrating no net increase in runoff. 4. A preliminary transportation plan describing ingress and egress to the proposed project site to deliver equipment and provide access during and after construction. Such plan shall describe any anticipated improvements to existing roads, bridges, or other infrastructure, as well as measures which will be taken to restore damaged or disturbed access routes following construction. 5. An environmental assessment that analyzes the impact of the proposed project regarding on-site and site-adjacent floodways, riparian corridors, open water, wildlife migration routes, protected habitat, protected plant species, and other environmentally sensitive areas as identified by the county, city, state, or federal government, along with proposed mitigation recommendations. 6. A decommissioning plan, compliant with MCA 75-26-301 where applicable, shall be prepared and submitted with zoning compliance permit or special review application. The plan shall address the following: (a) Defined conditions upon which decommissioning will be initiated (e.g., end of land lease, no power production for twelve (12) months, etc.). (b) Removal of all non-utility owned equipment, conduit, structures, fencing, roads, and foundations and restoration of property to condition prior to development of the WECS. This shall include a revegetation plan. The applicant may propose retaining some site improvements, such as roads and infrastructure, subject to landowner consent and city approval. (c) Timeframe for completion of decommissioning activities, not to exceed one year. (d) Description and copy of any lease or any other agreement with landowner regarding decommissioning. (e) Name and address of person or party responsible for decommissioning. (f) Plans and schedule for updating this decommissioning plan. (g) A professional engineer's estimated cost of decommissioning, the financial resources to be used to accomplish decommissioning, and the escrow agent with which the resources shall be deposited. The decommissioning plan shall also include an agreement between the applicant and the city that: (1) The financial resources for decommissioning shall be in the form of a surety bond or letter of credit to be deposited in an escrow account with an escrow agent acceptable to the city. (2) The city shall have access to the escrow account funds for the expressed purpose of completing decommissioning if decommissioning is not completed by the applicant within one year of the end of project life, inoperability of individual WECS turbine, or facility abandonment. Escrow funds may be used for administrative fees and costs associated with decommissioning. (3) The city is granted the right of entry onto the site, pursuant to reasonable notice, to effect or complete decommissioning. (4) The city is granted the right to seek injunctive relief to effect or complete decommissioning, as well as the city's right to seek reimbursement from applicant, operator, or their successor(s) for decommissioning costs in excess of the amount deposited in escrow and to file a lien against any real estate owned by applicant, operator, or their successor(s), or in which they have an interest, for the amount of the excess, and to take all steps allowed by law to enforce the lien. 7. Before final electrical inspection, provide evidence that the decommissioning plan was recorded with the Billings city clerk. C. Annual activity statement. Following approval, all permit holders are required to submit an annual activity statement that confirms that the system is still active and compliant with the permit and that provides current owner and emergency contact information. This requirement shall not preclude the city from undertaking a separate compliance report where confirmation of data provided by the facility's operator is desired.

(Ord. No. 21-5748, § 3(Exh. A), 1-25-21)