For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-1619 — Master site plan

City Code, Billings, Montana (Supp. No. 67: codified through Ordinance No. 26-5937, passed October 12, 2026) · Billings City Code § 27-1619

Corpus is an independent public-information project, not the official City of Billings website. Stable reference: corpuslaw.us/code/0909d672-0017-4bd6-9df1-9acff80cf462

Sec. 27-1619. - Master site plan.

[image omitted; see the official code] Figure 27-1619.A. Master Site Plan A. Applicability. The purpose of this section is to set forth the procedures and criteria for review and approval of master site plans when two (2) or more buildings share common facilities on an undivided lot. The purpose of master site plan review is to confirm that development is consistent with the requirements of this zoning code and with all previously approved plans applicable to the property. B. Authority. A request for master site plan approval may be submitted by a property owner or owner's agent. C. Procedures. Common procedures for master site plan review are identified in Table 27-1600.1 and are summarized here for applicant convenience. D. Decision criteria. The master site plan shall be reviewed against the following criteria: 1. The master site plan is consistent with any prior approvals, including any conditions that may have been placed on such approval; and 2. The master site plan conforms with all applicable requirements of this zoning code, or with all applicable requirements as modified by a request for a minor code adjustment. E. Review and decision-making. A master site plan is subject to administrative approval and shall be reviewed as follows: 1. Within sixty (60) calendar days following the submittal of a complete application, the zoning coordinator shall approve or deny the application, unless the applicant consents in writing to an extension of the review period. The review period clock stops when corrections or revisions are required and begins again once the additional information or modified complete plans are received. Failure of the applicant to timely respond to the corrections or request for additional information does not trigger subsection 2. 2. In the event that review exceeds ninety (90) calendar days, the applicant may seek immediate approval from the planning director. F. Effect. 1. Approved master site plans shall be binding upon the property owner(s) and their successors, transferees, and assigns. 2. No permit shall be issued for any building, structure, or use that does not conform to an approved master site plan. 3. No building, structure, use or other element of the approved master site plan shall be modified without amending the master site plan. 4. All buildings, structures and uses shall remain in conformance with the approved master site plan or be subject to enforcement action. G. Connectivity. Each development shall contribute to an interconnected system of streets and blocks as required by the city subdivision regulations in addition to the following requirements. Streets shall be located to result in the following block regulations. 1. Streets shall connect and continue existing or planned streets from adjoining areas. 2. Block faces at the maximum length above require pedestrian access at mid-block points to ensure walkability. Pedestrian access or walkways may be incorporated as a dedicated alley or as an easement between lots. H. Appeal process. An applicant who has requested review based on cured circumstances but is again denied may appeal the administrative denial pursuant to section 27-1616, Appeal of administrative decision. I. Post-approval actions. 1. Expiration. (a) Approved master site plans shall expire one year after approval if a building permit has not been issued or the approved use has not been established. Where a master site plan expires due to the passage of this time period, new site plan review documents must be submitted for approval in the same manner as an original application for development review. (b) An extension not to exceed one year may be granted by the zoning coordinator. 2. Modifications to master site plans. The holder of an approved site plan may request a minimal modification to the document, or the conditions of approval, by submitting amended documents to the zoning coordinator.

(Ord. No. 21-5748, § 3(Exh. A), 1-25-21; Ord. No. 22-5807, § 3(p), 5-9-22; Ord. No. 26-5930, § 1, 5-26-26)

Ask a question about Billings law

Corpus searches the Billings sections it holds and shows the ones that match, with their citations. Free, no sign-in.