For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38.710.050 — Documentation of compliance with adopted standards

Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.710.050

Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/c6fb06c6-8e50-4fa3-86df-047be15f758c

Sec. 38.710.050. - Documentation of compliance with adopted standards.

A. The following information must be provided with all subdivision preliminary plat applications in order to document compliance with adopted development standards unless waived by the development review committee during the pre-application process per 38.750.050. The developer must include documentation of any waivers granted by the city after the pre-application review. Additional relevant and reasonable information may be required to adequately assess whether the proposed subdivision complies with this chapter, the Montana Subdivision and Platting Act, and other applicable standards. 1. Surface water. a. Mapping. Locate on a plat overlay or sketch map all surface waters and the delineated floodplain which may affect or be affected by the proposed subdivision including: (1) Natural water systems such as natural streams, creeks, stream/ditches, drainages, waterways, gullies, ravines or washes in which water flows either continuously or intermittently and has a definite channel, bed and banks. (2) Artificial water systems such as canals, ditches, ditch/streams, aqueducts, reservoirs, irrigation or drainage systems. b. Description. (1) Describe all surface waters which may affect or be affected by the proposed subdivision including name, approximate size, present use and time of year when water is present. (2) Describe proximity of proposed construction (such as buildings, sewer systems, streets) to surface waters. c. Water body alteration. Describe any existing or proposed streambank or shoreline alterations or any proposed construction or modification of lake beds, watercourses or irrigation ditches. Provide information on location, extent, type and purpose of alteration. d. Wetlands. If the subdivision contains wetlands, as defined in 38.800.240, then a delineation of the wetland meeting standards of 38.610 must be provided and the location of existing and proposed modifications to wetlands must be shown on an overlay of the proposed plat. e. Permits. Include copies of any permits listed in 38.710.020 that have been obtained for the project. 2. Floodplains. Floodplain information must be submitted with the preliminary plat in compliance with 38.600.150 or 38.600.170 as applicable. 3. Groundwater. a. Depth. Establish the seasonal minimum and maximum depth to the water table by site specific monitoring of seasonal groundwater levels. Monitoring information must include dates and locations on which groundwater data was collected, data source, and the location and depth of all known aquifer which may be affected by the proposed subdivision. The high water table must be determined from monitoring data representing the period of major concern, which is defined as the May thru July period unless a different period is requested and approved by the city during the subdivision pre-application review. Groundwater discharge and management information to demonstrate compliance with 38.410.080. 4. Geology; soils; slopes. a. Geologic hazards. Identify geologic hazards affecting the proposed subdivision which could result in property damage or personal injury due to rock falls or slides; landslides, mud or snow; surface subsidence (i.e., settling or sinking); or seismic activity. b. Protective measures. Explain what measures will be taken to prevent or materially lessen the danger of future property damage or injury due to any of the hazards referred to in subsection 4.a above. c. Unusual features. Provide a statement describing any unusual soil, topographic or geologic conditions on the property which limit the capability for building or excavation using ordinary and reasonable construction techniques. The statement should address conditions such as shallow bedrock, high water table, unstable or expansive soil conditions, and slope. On a map, identify any slopes in excess of 15 percent grade. d. Soils map. The subdivision must be overlaid on the county soil survey maps obtained from the Natural Resource and Conservation Service (NRCS). The maps are 1:24,000 in scale. These maps may be copied without permission. However, enlargement of these maps could cause misunderstanding of the detail of mapping. Soils were mapped using a minimum delineation of five acres, and these soils reports were intended to alert developers to possible problems and the need for a more detailed on-site investigation. The developer must provide the following soil reports, which can be obtained from the NRCS: (1) The physical properties and engineering indexes for each soil type; (2) Soil limitations for utilities, building and site development, and water features for each soil type; (3) Hydric soils report for each soil type. If hydric soils are present, the developer must provide a wetlands investigation by a certified consultant, per 38.610; and (4) The developer must provide any special design methods planned to overcome the above limitations. e. Cuts and fills. Describe the location and amount of any cut or fill three or more feet in depth. These cuts and fills should be indicated on a plat overlay or sketch map. Where cuts or fills are necessary, describe any plans to prevent erosion and to promote revegetation such as replacement of topsoil and grading. 5. Vegetation. a. Vegetation map. On a plat overlay identify critical plant communities such as stream bank or shoreline vegetation; vegetation on steep, unstable slopes; and vegetation on soils highly susceptible to wind or water erosion. b. Protective measures. Describe measures to preserve trees and critical plant communities (e.g., design and location of streets, lots and open spaces). c. Noxious weed management and revegetation plan. Noxious weeds must be controlled in all developments as directed by the county weed control district (district) in accordance with the Montana County Noxious Weed Control Act (MCA 7-22-21). The developer must have any noxious weeds identified and their location mapped by a person with experience in weed management and knowledgeable in weed identification. A noxious weed management and revegetation plan approved by the district for control of noxious weeds must be submitted with the preliminary plat application. This plan must ensure the control of noxious weeds upon preliminary plat approval and the revegetation of any land disturbed during the construction of subdivision improvements. 6. Wildlife. a. Species. Describe any endangered species or species of concern which use the area affected by the proposed subdivision. b. Critical areas. Identify on a plat overlay of the proposed subdivision any known critical habitat as defined by the US Fish and Wildlife Service, habitat for threatened or endangered species, or wetlands. c. Public access. Describe the effects on public access to public lands, trails, hunting or fishing areas. d. Protective measures. Describe any proposed measures to protect or enhance wildlife habitat or to minimize degradation (e.g., keeping building and streets back from shorelines, setting aside wetlands as undeveloped open space). e. Discussion of impact; documentation. The developer must discuss the impact of the proposed development on fish and wildlife with the state department of fish, wildlife and Parks (FWP). With the preliminary plat application, the developer must provide written documentation from FWP that: (1) Verifies that FWP has reviewed the proposed plat; (2) Lists any FWP recommendations; and (3) Outlines any mitigation planned to overcome adverse impacts. 7. Agriculture. When a proposed development is adjacent to land used for agricultural production. (1) What measures will be taken, if any, to control family pets. (2) Fencing of agricultural land. Describe any existing fence lines around the development boundary which protect agricultural lands under an ownership other than of the developer, and describe any measure which will be taken to ensure that the owners of the development will share with the owner of the agricultural lands in the continued maintenance of the fence. 8. Agricultural water user facilities. a. Type, description, ownership, users, and existing easement holders and the easement type (e.g., filed, use, prescriptive or other) of facilities per 38.310.010 and 38.410.060. b. Written documentation demonstrating active use of facilities, for example the delivery of non-potable water supplies for irrigation, conversion to stormwater facilities, or other use. If a facility is not being actively used nor intended to be used in the future, include a written plan for discontinuance including all documentation required pursuant to Montana Law. c. Describe any proposed realignment, piping, street crossings, or other modifications. Any modification of an existing agricultural water user facility must comply with all relevant requirements of Montana law. d. Information from the owner(s) of the facility concerning the proposed use or discontinuance of the facility. e. If the facility provides conveyance of water to downstream water users or water rights holders, or is used for agricultural water return flows or stormwater then the facility must be perpetuated and located within an agricultural water user facility easement and/or stormwater drainage easement as applicable and consistent with the requirements of this chapter. 9. Water and sewer. Provide an engineering design report and/or other documentation demonstrating that adequate water distribution systems and capacity, and sewage collection and disposal systems and capacity, exists or will be provided to serve the proposed subdivision consistent with the City of Bozeman Design and Construction Standards and chapter 40. Provide the information needed to demonstrate proposed compliance with 38.780. Special care is needed when concurrent construction is proposed. 10. Stormwater management. A Stormwater Drainage Plan meeting the requirements found in the City of Bozeman Design and Construction Standards and the city's adopted stormwater master plan. 11. Transportation Facilities. a. Access. The developer must demonstrate that the land to be subdivided has access onto a legal street. b. Streets, roads, and alleys. Describe any proposed new public or private streets, roads or alleys, or substantial improvements of existing public or private streets, roads or alleys. The developer must demonstrate that the future streets will be consistent with the city's adopted design standards, article 34.4, the current long-range transportation plan, and other relevant standards. c. Active transportation facilities. Describe active transportation facilities to be developed with the development and their relationship to existing and future facilities. d. Access to arterial streets. Discuss whether any of the individual lots or tracts have access directly to arterial streets or roads, and if so, the reason access was not provided by means of a street within the subdivision and how the access complies with 38.400.090. e. Modification of existing streets, roads or alleys. Explain any proposed closure or modification of existing streets, roads or alleys. f. Pollution and erosion. Explain how street, road and alley maintenance will be provided to meet the department of environmental quality guidelines for prevention of water pollution and erosion and who is proposed to provide the required maintenance. g. Transportation Capacity. Demonstrate that adequate transportation capacity exists or will be provided to serve the proposed development consistent with the city's adopted design standards and long-range plans. A Transportation Impact Study (TIS), if required, shall be provided in accordance with the City of Bozeman Design and Construction Standards. (1) TIS is required if the proposed development meets any of the following criteria: (a) The proposed development exceeds the following thresholds. For uses not included below refer to Table 2 from Chapter 2 of the ITE Recommended Practice: Multimodal Transportation Impact Analysis for Site Development; Use | Threshold Single detached dwellings | 35 dwellings Single attached dwellings | 60 dwellings Multi-dwelling structures | 90 dwellings Retail | 5,300 sq. ft. gross floor area (b) The development proposes access spacing that do not meet the requirements on any collector or arterial streets; (c) The development intensifies use and is not adjacent to a collector or arterial street; (d) The proposed development is in an area that was included in a previous TIS and the trip generation for the proposed development exceeds the values assumed for the area in the previous TIS or if the previous TIS is more than 5 years old. (e) Other special circumstances as determined by the Director of Transportation and Engineering. (2) When required above, the study area for the TIS must include: (a) Nearest collector-collector, arterial-arterial, or arterial-collector intersections that serve the proposed development. (b) Intersections of local streets with arterial and collector streets within the study area defined in this paragraph 38.710.050.A.11.g.2. (c) Local streets that connect to existing local streets. (d) Additional locations as identified by the Director of Transportation and Engineering. (3) When required, the TIS must include the following information: (a) Project description. Identify location of project and describe the existing transportation network and facilities that serve the development. This should include all classifications of streets, active transportation facilities and transit service. Describe how the proposed development will connect to the existing system including the use of local streets that connect the proposed development to arterial or collector streets. Identify the timeline for build out of the development including any anticipated phases. (b) Existing traffic volumes. Provide information on existing traffic volumes collected within two years of the study, including bicycle and pedestrian volumes and existing transit routes and stops. Identify locations, dates, and times of data collection. Identify the peak hours of the existing transportation system. Locations near schools or special generators may need to include counts to help identify the peak periods. Data collection should cover 3 days, typically Tuesday, Wednesday and Thursday. Provide information on seasonal adjustment factors used and the basis of the factors. (c) Site trip generation. Identify number of weekday trips that will be generated by the proposed development using the most recent version of the Institute of Transportation Engineers (ITE)Trip Generation Manual or approved alternative methodology. For mixed-use sites, include trip generation in the form of a table of each type of land use with corresponding ITE land use code, the independent variable, as appropriate, the trip rates used (daily and peak) and resulting trip generation. Include identification of the peak hours for the site as well as for the adjacent transportation system. Include adjustments, when appropriate, for pass by trips, internal trip capture, and any reductions based on mode split. Any adjustments must be detailed in the report and must be based on identified and accepted methods. For phased projects the trip generation for each phase should be identified. For redevelopment sites, include a comparison of existing trips with trips generated by the proposed development. (d) Adjacent trip generation. Identify current or proposed developments and the associated trip generation from those developments that will be added to the existing volumes to make up the total background volumes. Identify and describe methodology used to determine anticipated additional traffic growth. (e) Trip distribution. Identify how the trips generated by the site will be distributed to the transportation system through each intersection within the study area, as defined in 38.710.050.A.11.g.(2). Include any assumptions made and identify the methodology utilized to develop the trip distribution. (f) Traffic assignment. Utilizing the developed trip distribution, show how the existing and future trips are assigned to the streets serving the proposed development. Include figures that show traffic volumes on the transportation system. Include all streets, including local streets, which will distribute trips to transportation system. Include graphics, which show: (i) A.M. and P.M. peak hour existing volumes; (ii) A.M. and P.M. peak hour site generated volumes; (iii) A.M. and P.M. peak hour current year total traffic; (iv) A.M. and P.M. peak hour total traffic at year of build out; and (v) Total daily traffic (with site-generated traffic shown separately). (g) Capacity analysis. Provide level of service analysis for existing and proposed arterial-arterial, collectorcollector, and arterial-collector intersections and intersections of local streets with collectors and arterials. Provide level of service for the existing conditions and design year, defined as the projected year of full build out or 5 years from the date of application whichever is greater. Analysis must include evaluation of signalization warrants. Where appropriate, intersection capacity should be analyzed for both signalization and roundabout operation. Capacity analysis will utilize the methods identified in the most recent version of the Highway Capacity Manual. (h) Crash Study. Summarize crash history, including bicycle and pedestrian involved crashes, for the study area over the most recent 5 years of available data. Crash study should provide aggregate number of crashes as well as crash rates, collision types, and contributing factors (as available). (i) Site operational analysis. Identify any proposed modification to access spacing and demonstrate turning movements for fire apparatus and/or other applicable design vehicles. (j) Recommended mitigations. Identify mitigation strategies to address areas that do not meet the City of Bozeman Design and Construction Standards. Mitigations should be identified to address: (i) Intersection capacity that does not meet the level of service standard identified in 38.400.060.B.3; (ii) Vehicular volumes requiring traffic calming for local streets in the study area that exceed the volume threshold per 38.400.060.B.3; (iii) Crash clusters; and (iv) Barriers to safe bicycle and pedestrian movement as identified by the Director of Transportation and Engineering. If the project is phased, include identification of when the mitigations are required. (k) The information needed to demonstrate proposed compliance with 38.780. Special care is needed when concurrent construction is proposed. 12. Non-municipal utilities. The developer must submit a copy of the subdivision plat to all relevant utility companies. With the preliminary plat, the developer must provide written documentation of the following: a. Affected utilities. (1) Indicate which affected utilities the subdivision plat has been submitted to for review and include a copy of responses. (2) The developer must provide a written statement from the utility companies that the proposed subdivision can be provided with service. (3) Non-municipal utility locations shall be coordinated with locations of municipal utilities. 13. Land use. a. Indicate the proposed use and number of lots or spaces in each: (1) Residential area. Types of structures and numbers of each (e.g., two- or four-unit dwelling structures); (2) Condominium (number of units); (3) Recreational vehicle park; (4) Commercial or industrial; and (5) Other (please describe). 14. Parks and recreation facilities. The following information must be provided for all land used to meet parkland dedication requirements: a. Park plan. A park plan, including: (1) Site plan with one-foot contour topographic survey for the entire property; showing proposed developer installed improvements on the initial park plan and proposed future improvements on the future park plan, and phasing proposed if any, exact product specifications are not required; (2) Drainage areas; (3) Utilities within, serving, and adjacent to the property; (4) Existing or proposed utility easements within the property; (5) The location of any critical lands (wetlands, riparian areas, streams, etc.) and location of watercourse setbacks and any permits from non-city agencies required to execute the proposed plan; (6) Park conceptual landscaping plan, prepared by a qualified landscape professional in accordance with 38.710.090 unless the parks department has adopted an alternate plan standard, showing the location and specific types and species of plants, shrubs, trees as well as grass seed mixes. (7) General description of land, including size, terrain, details of location and history, water features, and proposed activities; (8) Trail design and construction showing compliance with adopted city standards and trail classifications; (9) Appropriate sections from the design guidelines for city parks; (10) Cost estimate, installation phasing and responsibility, and maintenance plan tasks and responsibility for custom features or atypical designs; (11) If playground equipment will be provided with initial installation by the subdivider, information including the manufacturer, installation data and specifications, installer, type of fall zone surfacing, and age group intended for use; otherwise, a general identification of proposed function; (12) Soils information and analysis; (13) A description of how the proposed park plan is consistent with the goals of the city's current long-range plan for parks; (14) A description of how the proposed park will meet the recreational needs of the residents of the development; and (15) A phase I environmental assessment of the area proposed to be transferred to the city or property owner's association. b. Irrigation information. (1) Irrigation system design compliant with requirements outlined in the most recent version of the City of Bozeman Landscape and Irrigation Performance and Design Standards Manual; and (2) If an existing well will be used for irrigation, a certified well log must be submitted showing depth of well, gpm, pump type and size, voltage, water rights, etc. c. Phasing. If improvements will be phased, a phasing plan must be provided including proposed financing methods and responsibilities. d. Cash-in-lieu and improvements-in-lieu. If the development includes a proposal for cash-in-lieu or improvements-in-lieu of park a specific justification responding to the review factors established by resolution of the city commission. If improvements-in-lieu are proposed specific costs of proposed improvements and costs to install must be provided. 15. Neighborhood center plan. A neighborhood center plan must be prepared and submitted for all subdivisions containing a neighborhood center per 38.410.020.A. 16. Lighting plan. The following lighting information must be submitted for all development where lighting is proposed other than within the street right-of-way: a. Proposed fixture locations, types, source of power, and demonstration of compliance with city lighting standards. b. When requested by the city, the applicant must also submit a visual-impact plan that demonstrates appropriate steps have been taken to mitigate on-site and off-site glare and to retain the city's character. c. Post-approval alterations to lighting plans or intended substitutions for approved lighting must only be made after city review and approval. 17. Miscellaneous. a. Public lands. Describe how the subdivision will affect access to any public lands. Where public lands are adjacent to or within 200 feet of the proposed development, describe present and anticipated uses for those lands (e.g., open space, recreation, etc.), and how public access will be preserved/enhanced. b. Hazards. Describe any health or safety hazards on or near the subdivision, such as mining activity or potential subsidence, high pressure gas lines, dilapidated structures or high voltage power lines. Any such conditions must be accurately described, and their origin and location identified. List any provisions that will be made to mitigate these hazards. Also describe any on-site or off-site land uses creating a nuisance. c. Wildlands-urban interface. Describe the subdivision's location within or proximity to the wildlands-urban interface (WUI) and ember zone designated by the most recent city-adopted hazard mitigation plan. Describe any hazard from the subdivision's proximity to the WUI. List any provisions that will be used to mitigate these hazards and reduce structure ignitability. 18. Affordable housing. Describe how the subdivision will integrate with 38.340. The description must be of adequate detail to clearly identify those lots complying with 38.340 requirements and to make the obligations placed on the affected lots readily understandable. a. On all lots intended to comply with 38.340, the building envelope must be depicted. 19. Submittal Requirements for Water rights. a. Describe how the proposed subdivision intends to satisfy 38.410.110. b. Provide documentation of all water rights appurtenant to or in use upon associated with the property with the proposed subdivision. Documentation must include: (1) A description of the research methods used to identify the water rights appurtenant to or in use upon associated with the property. The applicant must provide a written certification if no water rights are appurtenant to or associated with the property. (2) Current Official water rights abstracts and share or stock certificates. (3) All adopted Master's Reports or closing orders issued by the Montana Water Court. (4) Title information establishing water right ownership. For water rights in divided split ownership describe the percent ownership interest attributable to the property. (5) Maps showing the water rights points of diversion and the means of conveyance for the delivery of water to the subject property. (6) Evidence clearly establishing and quantifying all beneficial use of water appurtenant to or associated with the property the water rights within the prior 5 year period. (7) Any additional information that is reasonably e and necessary and is requested by for the City to determine if the water rights are useful for City purposes pursuant to Section 38.410.110.D.1. c. DNRC approval for any proposed appropriation or proposed use of water subject to MCA 852-306 or MCA 85-2-402 for which DNRC approval is required prior to beneficial use. d. Indicate whether any of the items in 38.410.110.B are applicable. e. Describe any water efficiency and conservation offsets that will be implemented. f. Identify the lots for which a payment of cash in lieu of water rights will occur and the lots for which a deferral will be sought.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)

Ask a question about Bozeman law

Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.