Sec. 38.710.070. - Site plan submittal requirements.

A. Applications for all site plan approvals must be submitted to the community development department on forms provided by the community development director. Submittal level of detail for master site plans must be consistent with the intent and scope of the submittal per 38.740.020.B and phasing per 38.740.110.G. B. General information. 1. Complete, signed application including the following: a. Name of project/development; b. Location of project/development by street address and legal description; c. Name and mailing address of developer and owner; d. Name and mailing address of engineer/architect, landscape architect, irrigation designer, and/ or planner; e. Listing of specific land uses being proposed; and f. A statement signed by the owner of the proposed development of their commitment to comply with the requirements of this Code and any conditions considered necessary by the review authority; 2. Location map, including area within one-half mile of the site; 3. For all developments, excluding sketch and reuse/further development, a construction route map must be provided showing how materials and heavy equipment will travel to and from the site. The route must avoid, where possible, local streets or streets where construction traffic would pose a threat to public health and safety. C. Site plan information. The following information is required whenever the requested information pertains to zoning or other regulatory requirements of this chapter, existing conditions on-site or conditions on-site which would result from the proposed development: 1. Boundary line of property with dimensions; 2. Date of plan preparation and changes; 3. North point indicator; 4. Suggested scale of one inch to 20 feet, but not less than one inch to 100 feet; 5. Parcel and site coverage information: a. Parcel size in gross acres and square feet; b. Estimated total floor area with a breakdown by land use; and c. Location, percentage of parcel and total site, and square footage for the following: (1) Existing and proposed buildings and structures; (2) Driveway and parking; (3) Areas to remain undisturbed, (4) Landscaped areas, with and without irrigation, (5) Recreational uses areas, parks, school sites, etc., and (6) Public street right-of-way; 6. Total number, type and density per type of dwelling, and total net and gross residential density and density per residential parcel; 7. Location, identification and dimension of the following existing and proposed data, on-site and to a distance of 100 feet outside site plan boundary, exclusive of public rights-of-way, unless otherwise stated: a. Topographic contours at a minimum interval of one foot, or as determined by the review authority; b. Adjacent streets and street rights-of-way to a distance of 150 feet, except for sites adjacent to major arterial streets where the distances must be 200 feet; c. On-site streets and rights-of-way; d. Ingress and egress points; e. Traffic flow on-site; f. Traffic flow off-site; g. Utilities and utility rights-of-way or easements including but not limited to: (1) Electric; (2) Natural gas; (3) Telephone, cable TV, optic fiber, and similar utilities; (4) Water; and (5) Sewer (sanitary, treated effluent and storm); h. Surface water and groundwater, including: (1) Holding ponds, streams and irrigation ditches; (2) Watercourses, water bodies and wetlands; (a) If wetlands information was provided with a prior subdivision, provide delineation of on-site wetlands per the subdivision work on the site plan. The developer must provide recertification from a wetlands professional per 38.610 that site wetlands mapped with the subdivision are still accurate or provide new delineation. (b) If no wetlands delineation was done with a prior subdivision, the developer must complete such delineation of on-site wetlands consistent with the process in 38.610. (3) Floodplains as designated on the effective federal insurance rate map and delineated per requirements of 38.600 or that may otherwise be identified as lying within a 100-year floodplain through additional floodplain delineation, engineering analysis, topographic survey or other objective and factual basis; (4) A floodplain hazard evaluation report in compliance with article 6 of this chapter if not previously provided with subdivision review; (5) Agricultural water user facilities and easements and contact requirements per 38.310.010 unless: (a) Such information was previously provided through a subdivision review process; or (b) The provision of such information was waived in writing during subdivision review of the land to be developed; (6) Depth to the high water table must be determined from tests taken during the period of major concern; i. Grading and drainage plan, including provisions for on-site retention/detention and water quality improvement facilities as detailed in a Stormwater Drainage Plan; (1) All drainageways, streets, arroyos, dry gullies, diversion ditches, spillways, reservoirs, etc., which may be incorporated into the storm drainage system for the property must be designated: (a) The name of the drainageway (where appropriate); (b) The downstream conditions (developed, available drainageways, etc.); and (c) Any downstream restrictions; j. Slopes of greater than 15 percent or other significant topographic features; k. Sidewalks, walkways, drive aisles, loading areas and docks, bicycle facilities, including typical details and interrelationships with vehicular circulation system, indicating proposed treatment of points of conflict, a statement requiring lot accesses to be built to the standard contained in this section, the City of Bozeman Design and Construction Standards, and the City of Bozeman Modifications to Montana Public Works Standard Specifications; l. Provision for site accessibility, including, but not limited to, wheelchair ramps, parking spaces, handrails and curb cuts, including construction details and the applicant's certification of ADA compliance; m. Fences and walls, including typical details; n. Exterior signs; o. Exterior refuse, recycling, and composting collection areas, including typical details; p. A site plan, complete with all structures, parking spaces, building entrances, traffic areas (both vehicular and pedestrian), vegetation that might interfere with lighting, and adjacent uses, containing a layout of all proposed fixtures by location and type. The materials required in 38.710.050.A.18, if not previously provided; q. Curb, asphalt section and drive approach construction details; r. Landscaping and irrigation (detailed plan showing plantings, irrigation layout, and other relevant information as required in 38.710.090); s. Unique natural features, significant wildlife areas and vegetative cover, including existing trees and shrubs having a diameter greater than two and one-half inches, by species; t. Snow storage areas. All parking facilities containing five (5) or more parking spaces shall provide a snow management plan. The plan shall contain the following: (1) Locations for snow storage, which may include on-site landscaped areas, and other open space for at least 15 percent of the total area of the site used for parking, access drives, walkways and other paved surfaces; (2) Snow storage is prohibited: (a) Within the public right-of-way; (b) Where it would obstruct line of sight or vision triangle; (c) In a location where it blocks fire hydrants, emergency vehicle access or access to other properties; (d) Where it will cause unmanageable freeze/thaw and icing of sidewalks, pathways and other paved surfaces; (e) Where it obstructs on-site amenities, including but not limited to points of egress, mailboxes, storage areas, and trash enclosures; (f) Within any access easement; (g) Where placed in a manner which violates the Clean Water Act (CWA) and/or the Montana Pollutant Discharge Elimination System (MPDES), and/or any other federal, state or local law or statute. (h) Where it will cause damage to trees located in the public right-of-way; u. Location of city limit boundaries if within 200 feet of the development; v. Historic, cultural and archaeological resources, describe and map any designated historic structures or districts, and archaeological or cultural sites; and w. Public facilities, including schools, parks, trails, etc. 8. Detailed plan of all parking facilities, including circulation aisles, access drives, bicycle racks, compact spaces, accessible spaces and motorcycle parking, on-street parking, number of employee and non-employee parking spaces, existing and proposed, and total square footage of each. a. If electronic vehicle chargers are included or expected for future use identify location, path of electrical service, and layout for chargers and transformers; 9. The information related to transportation capacity required by 38.710.050.A.11, subject to the following exceptions: a. Such information was previously provided through a subdivision review process and the proposed development does not generate more trips than estimated during the subdivision review; or b. The provision of such information was waived in writing during subdivision review of the land to be developed; or c. The provision of such information is waived in writing by the DRC prior to submittal of a site plan application; or d. The application for site plan approval involves the redevelopment of property located within the city's established neighborhood conservation overlay district. In such cases, the city may require the property owner to sign a waiver of right to protest creation of a special improvement district, or other form of agreement, assuring participation, on a fair share, prorata basis, in future improvements to intersections in the vicinity of the development proposal; or e. The application for site plan approval involves the adaptive reuse of an existing building, regardless of its location within the city, or the redevelopment of a property located within one of the city's urban renewal districts. In cases where an existing building or complex of buildings is to be torn down and replaced with a larger building or complex of buildings, the city engineer may require the information described in 38.710.050.A.11 to evaluate the additional traffic impacts resulting from development of the larger building or complex of buildings; or f. Unless waived by the DRC, updated information will be required if previous approvals or waivers are more than five (5) years old. 10. Building design information (on-site): a. Building heights and elevations of all exterior walls of the building or structure; b. Height above mean sea level of the elevation of the lowest floor and location of lot outfall when the structure is proposed to be located in a floodway or floodplain area; c. Floor plans depicting location and dimensions of all proposed uses and activities; and d. All on-site utilities and mechanical equipment; 11. Description and mapping of soils existing on the site, accompanied by analysis as to the suitability of such soils for the intended construction. Soil in proposed landscaping areas must comply with requirements outlined in the most recent version of the City of Bozeman Landscape and Irrigation Performance and Design Standards Manual. 12. Temporary facilities plan showing the location of all temporary model homes, sales offices and/or construction facilities, including temporary signs and parking facilities; 13. Unless already provided through a previous subdivision review, a noxious weed control plan complying with 38.710.050.A.5.c; and 14. Drafts of applicable supplementary documents as set forth in 38.720; 15. The information necessary to complete the determination of density change and parkland provision required by 38.420.020.B, unless such information was previously determined by the city to be inapplicable and written confirmation is provided to the applicant prior to submittal of a preliminary site plan application. If a new park will be created by the development the park plan materials of 38.710.050.A.14 must be provided; 16. Affordable housing. If the application includes requests for incentives provided in 38.340, describe how the site plan will satisfy any requirements of 38.340 which have either been established for that lot through the subdivision process or if no subdivision has previously occurred are applicable to a site plan. The description must be of adequate detail to clearly identify those lots and dwellings designated as subject to 38.340 compliance requirements and to make the obligations placed on the affected lots and dwellings readily understandable; 17. Phased site plans: a. A phasing plan showing the location of phase boundaries and that each phase will be fully functional if subsequent phases are not completed; b. A utilities plan showing that each phase will be able to be fully functional if subsequent phases are not completed; c. A revegetation and grading plan showing how disturbed areas will be revegetated to control weeds and site grading and drainage control will be maintained as phased construction proceeds; d. If the applicant intends for multiple phases to be under construction simultaneously, evidence of financial commitment from the project lender for the completion of all phases to be undertaken at once. Evidence of financial commitment may be provided at the time the building permits for the multiple phases are sought. 18. When 38.420.020 requires parkland dedication in association with a site plan, and cash-in-lieu of parkland will not be provided, the materials required by 38.710.050.A.14. 19. The information related to water adequacy required by 38.710.050.A.19, unless the information was previously provided through a subdivision review process and the proposed development does not generate more demand than addressed during the subdivision review. a. At the discretion of the Director of Utilities, updated information will be required if previous approvals or determination of no impact are more than 5 years old.

(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)