§ 38.710.190 — Submittal materials for concept plans
Bozeman Municipal Code, City of Bozeman, Montana (Codified through Order No. 2026-11, adopted September 15, 2026. (Supp. No. 16, Update 1)) · Bozeman Municipal Code § 38.710.190
Corpus is an independent public-information project, not the official City of Bozeman website. Stable reference: corpuslaw.us/code/a468025f-a090-442c-8577-74590e53db13
Sec. 38.710.190. - Submittal materials for concept plans.
A. Applications for all concept review must be submitted to the community development department on forms provided by the community development director. The following materials are required and additional materials may be identified on application forms. 1. Project Narrative providing a description of the overall project including design intent, project goals, project time frame, proposed uses, site improvements, buildings, anticipated parking demand and source of off-street parking. 2. List of questions regarding specific project input sought from the city. 3. Data regarding the existing zoning, site and building conditions, adjacent uses, available utilities and other related general information about adjacent land uses. 4. If existing structures are 50+ years old, provide color photos of all sides of the building. 5. If parkland is required, explain proposed way to satisfy per 38.420, BMC and proposed integration with natural features. 6. Include a separate site plan displaying existing conditions such as lot boundaries, dimensions, setbacks, existing easements, access points, vehicular and pedestrian circulation, buildings, natural features, and topography. 7. Site plan displaying proposed development including: a. Existing and proposed utilities labeled. b. Setbacks (Form and Intensity minimums, Wetland, Watercourse) annotated with distances in feet. c. Pedestrian and vehicular circulation. d. Street vision triangles. e. Open space (if applicable). f. Anticipated parking demand and source of off-street parking. g. Building footprint. 8. Natural features: Preliminary scoping of wetlands and wetland boundaries with identification of whether they are expected to be jurisdictional to federal regulations, all proposed areas for fill, all watercourses with classification as identified by the Gallatin Conservation District, all agricultural irrigation facilities with identified ditch owners or operators and evidence of notice to the owners or operators. 9. Civil plan including: a. Proposed utilities- electric, natural gas, telephone, cable, water, sewer. b. Easements (in correct dimensions and width). c. Identify a stormwater strategy (surface vs. subgrade), and general location. Calculations not required. d. Topographic contours. 10. Proposed structure(s): a. Conceptual building elevations with overall height, roof pitch, and transparency locations. b. Floor plans with areas of each space identified with use (if known). c. Building materials intended. 11. Setbacks (property line, wetland, watercourse). All setbacks must be annotated with type. Show the building footprints and any proposed encroachments. Any setback or property line encroachments must be clearly shown and be noted with encroachment type (e.g. awning, weather protection, cantilever, lighting, eave, etc.). 12. Landscape plan including: a. If known, the landscape design approval pathway selected for compliance (prescriptive vs. performance); b. The general location of street trees, screening, landscape separation, and parking lot landscaping, as applicable to the project; c. The general location and square footage of the proposed landscape types, such as: (1) Turf; (2) Seed Mix; and (3) All other plants except for trees. 13. List the proposed landscape water supply source, location, and ownership (e.g. private or public) with a brief description of how this water will be used. 14. If phasing is proposed, a separate phasing plan with phases clearly identified. Include a description of each individual phase as related to the overall improvements. 15. Identify if the applicant intends concurrent construction and for what infrastructure. 16. The information related to water adequacy required by 38.710.030.A.14, unless the information was previously provided through a subdivision review process and the proposed development does not generate more demand than addressed during the subdivision review. a. At the discretion of the Director of Utilities, updated information will be required if previous approvals or determination of no impact are more than 5 years old.
(Ord. No. 2025-12, § 4(Exh. A), 12-16-2025)
Ask a question about Bozeman law
Corpus searches the Bozeman sections it holds and shows the ones that match, with their citations. Free, no sign-in.