For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 59-53 — General service 5-G schedule

Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-53

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/ce93138f-a9ad-4e38-93ae-63051d5f74c9

Sec. 59-53. - General service 5-G schedule.

(a) Availability. This schedule is available to the contracting customer(s) in a single enterprise, located entirely on a single, contiguous premise. This schedule is not available to the individual customer that qualifies for a residential or industrial schedule, nor for auxiliary or breakdown service. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power, or as a substitute for power contracted for or which may be contracted for, under any other schedule of the city, except at the option of the city for service in conjunction with the renewable energy generation rider, or under special terms and conditions expressed in writing in the contract with the customer. The obligations of the city in regard to supplying power are dependent upon its securing and retaining all necessary rights-of-way, privileges, franchises and permits, for the delivery of such power. The city shall not be liable to any customer or applicant for power in the event it is delayed in or is prevented from, furnishing the power by its failure to secure and retain such rights-of-way, rights, privileges, franchises and permits. (b) Type of service. (1) The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages, where available: Single-phase, 120/240 volts; or 3-phase, 208Y/120 volts, 480Y277 volts; or 3-phase, 3-wire, 240, 480, volts; or 3-phase, 12470/7200 volts; or Three-phase voltages other than those listed above may be available at the city's option, if the size of the customer's contract warrants a substation solely to serve that customer, and if the customer furnishes suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault built in accordance with the city's specifications. (2) The type of service supplied will depend upon the voltage available. Prospective customers should determine the available voltage by contacting the nearest office of the city before purchasing equipment. (3) Motors of less than five hp may be single-phase. All motors of more than five hp must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the service of the city to permit other types of motors. (c) Monthly rate. (1) Charges will be included in customers' bills as provided by subsection 59.40(a) and may include charges for a purchase power adjustment rider (§ 59-41 et seq.), and/or a portfolio standard renewable energy rider (§ 59-42 et seq.), and/or an "extra facilities charge" rider (§ 59-43 et seq.) and shall include a "minimum bill," a "billing demand" charge and a "power factor correction" all as defined immediately below. (2) The billing demand each month shall be the largest of the following: (i) The maximum integrated 30-minute demand in the previous 12 months including the month for which the bill is rendered. (ii) Fifty percent of the contract demand. (iii) Thirty kilowatts (kw). The city will install a permanent demand meter when the monthly usage of the customer equals or exceeds 3,000 kwh per month, or when tests indicate a demand of 15 kw or more. The city may, at its option, install a demand meter for any customer served under this schedule. (3) Power factor correction. When the average monthly power factor of the customer's power requirements is less than 85 percent, the city may correct the integrated demand in kilowatts for that month by multiplying by 85 percent and dividing by the average power factor in percent for that month. (4) Minimum bill. The minimum bill shall be the bill calculated on the rate above including the basic facilities charge, demand charge and energy charge, but the bill shall not be less than the amount determined as shown below according to the type of minimum selected by the city. (i) Monthly charge as defined in subsection 50-40(a) or if the customer's measured demand exceeds the contract demand, the city may, at any time establish the minimum based on the maximum integrated demand in the previous 12 months including the month for which the bill is rendered, instead of the contract demand. The annual charge shall be as defined in subsection 50-40(a). (ii) The city may choose the annual charge option if the customer's service is seasonal or erratic, or it may offer the customer a monthly minimum option. Unless otherwise specified in the contract, the billing procedure for annual minimums will be as follows: For each month of the contract year when energy is used, a monthly bill will be calculated on the rate above. For each month of the contract year when no energy is used, no monthly amount will be billed. The bill for the last month of the contract year will be determined as follows: (i) If the total of the charges for 12 months exceeds the annual minimum, the last bill of the contract year will include only the charge for that month. (ii) If the total of the charges for 12 months is less than the annual minimum, the last bill of the contract year will include an amount necessary to satisfy the annual minimum. (d) Contract period. Each customer shall enter into a contract to purchase electricity from the city for a minimum original term of one year, and thereafter from year to year upon the condition that either party can terminate the contract at the end of the original term, or at any time thereafter by giving at least 60 days' previous notice of such termination in writing; but the city may require a contract for a longer original term of years where the requirement is justified by the circumstances.

(Ord. No. 10-01, § 1, 1-14-2010)

Ask a question about Concord law

Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.