§ 59-55 — General service, all electric, schedule 6-GA
Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-55
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/3bb1731e-8106-4946-bf6d-3aa5214c005a
Sec. 59-55. - General service, all electric, schedule 6-GA.
(a) Availability. This rate is available only to establishments in which environmental space conditioning is required and all energy for all such conditioning (heating and cooling) is supplied electrically through the same meter as all other electric energy used in the establishment. However, if any such establishment contains residential housekeeping units, all energy for all water heating and cooking for such units is also supplied electrically. Service under this schedule shall be used solely by the contracting customer in a single enterprise, located entirely on a single, contiguous premise, and all electric energy used in the establishment must be provided by the city. To qualify for service under this schedule, space conditioning systems shall be permanently installed in accordance with sound engineering practices and the manufacturer's specifications and installation standards. This schedule is not available to the individual customer that qualifies for a residential or industrial schedule, nor for auxiliary or breakdown service. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power or as a substitute for power contracted for or which may be contracted for, under any other schedule of the city, except at the option of the city, under special terms and conditions expressed in writing in the contract with the customer. The obligations of the city in regard to supplying power are dependent upon its securing and retaining all necessary right-of-way, privileges, franchises and permits, for the delivery of such power. The city shall not be liable to any customer or no applicant for power in the event it is delayed in or is prevented from, furnishing the power by its failure to secure and retain such right-of-way, rights, privileges, franchises and permits. (b) Applicability. This schedule is applicable to all electric service of the same available type supplied to customer's premises at one point of delivery through one kilowatt-hour meter. (c) Types of service. The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages where available: (1) Single-phase, 120/240 volts; or 3-phase, 208Y/120 volts, 480Y277 volts; or 3-phase, 3-wire, 240, 480, volts; or 3-phase, 12470/7200 volts; or Three-phase voltages other than those listed above may be available at the city's option, if the size of the customer's contract warrants a substation solely to serve that customer, and if the customer furnishes suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault built in accordance with the city's specifications. (2) The type of service supplied will depend upon the voltage available. Prospective customers should ascertain the available voltage by inquiry at the office of the city before purchasing equipment. (3) Motors of less than five hp may be single-phase. All motors of more than five hp must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the service of the city, to permit other types of motors. (d) Monthly rate. (1) The monthly rate under this schedule shall be as provided in subsection 59-40(a) and may include charges for a purchase power adjustment rider (§ 59-41 et seq.), and/or a portfolio standard renewable energy rider (§ 59-42 et seq.), and/or an "extra facilities charge" rider (§ 59-43 et seq.), and shall include a "minimum bill" as provided in subsection 59-53(c)(4), a "billing demand" as provided immediately below and a "power factor correction" provided in subsection 59-53(c)(3). (2) The billing demand each month shall be the largest of the following: (i) The maximum integrated 30-minute demand measured during the month for which the bill is rendered. (ii) Fifty percent of the maximum integrated 30-minute demand in the previous 12 months including the month for which the bill is rendered. (iii) Fifty percent of the contract demand. (iv) Fifteen kilowatts (kw). Note: The minimum billing demand for contracts made prior to March 15, 1971 shall be five kw until the maximum integrated 30-minute demand becomes 15 kw, after which the minimum billing demand for such contracts shall be 15 kw. The city will install a permanent demand meter for all customers served under this schedule. (e) Payment. See subsection 59-40(b). (f) Contract period. See subsection 59-53(d).
(Ord. No. 10-01, § 1, 1-14-2010)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.
