For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 59-56 — Industrial service schedule 7-I

Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-56

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/a94dc69e-d9c8-4f6e-9fc4-d0447f2a4042

Sec. 59-56. - Industrial service schedule 7-I.

(a) Availability. This rate schedule is available only to establishments classified as "manufacturing industries" by the North American Industrial Classification System (NAICS) manual published by the Executive Office of the President, Office of Management and Budget, National Technical Information Service, U. S. Department of Commerce (most current edition). This schedule is available for electric service by the contracting customer in a single enterprise, located entirely on a single, contiguous premises. This schedule is not available for auxiliary or breakdown service. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power, or as a substitute for power contracted for or which may be contracted for under any other schedule of the power company, except at the option of the city, or for service in conjunction with the renewable energy generation rider, or under special terms and conditions expressed in writing in the contract with the customer. The obligations of the city in regard to supplying power are dependent upon its securing and retaining all necessary right-of-way, privileges, franchises and permits, for the delivery of such power. The city shall not be liable to any customer or applicant for power in the event it is delayed in, or is prevented from furnishing the power by its failure to secure and retain such right-of-way, rights, privileges, franchises and permits. (b) Applicability. This schedule is applicable to all electric service of the same available type supplied to customer's premises at one point of delivery through one kilowatt-hour meter. (c) Type of service. (1) The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages where available: Single-phase, 120/240 volts; or 3-phase, 208Y/120 volts, 480Y277 volts; or 3-phase, 3-wire, 240, 480, volts; or 3-phase, 12470/7200 volts; or Three-phase voltages other than these listed above may be available at the city's option, if the size of the customer's contract warrants a substation solely to serve that customer, and if the customer furnish suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault built in accordance with the city's specifications. (2) The type of service supplied will depend upon the voltage available. Prospective customers should determine the available voltage by contacting the office of the city before purchasing equipment. (3) Motors of less than five hp may be single-phase. All motors of more than five hp must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the service of the city, to permit other types of motors. (d) Monthly rate. The monthly rate under this schedule shall be as provided in subsection 59-40(a), and may include charges for a purchase power adjustment rider (§ 59-41 et seq.), and/or a portfolio standard renewable energy rider (§ 59-42 et seq.), and/or an "extra facilities charge" rider (§ 59-43 et seq.), and shall include a "minimum bill" as provided in subsection 59-53(c)(4), a "billing demand" as provided immediately below and a "power factor correction" provided in subsection 59-53(c)(3). Billing demand: For establishments served under this schedule where environmental space conditioning is required and all energy for all such conditioning (heating and cooling) is supplied electrically through the same meter as all other energy used in the establishment, the billing demand each month shall be the largest of the following: (1) The maximum integrated 30-minute demand measured during the month for which the bill is rendered. (2) Fifty percent of the maximum integrated 30-minute demand in the previous 12 months including the month for which the bill is rendered. (3) Fifty percent of the contract demand. (4) Fifteen kilowatts (kw). Note: The minimum billing demand for contracts made prior to March 15, 1971 shall be five kw until the maximum integrated 30-minute demand becomes 15 kw, after which the minimum billing demand for such contracts shall be 15 kw. The city will install a permanent demand meter for all customers served under this schedule. For all other customers served under this schedule, the billing demand each month shall be the largest of the following: (1) The maximum integrated 30-minute demand in the previous 12 months including the month for which the bill is rendered. (2) Fifty percent of the contract demand. (3) Thirty kilowatts (kw). (e) Payment. See subsection 59-40(b). (f) Contract period. See subsection 59-53(d).

(Ord. No. 10-01, § 1, 1-14-2010)

Ask a question about Concord law

Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.