For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 59-58 — General service schedule TOU

Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-58

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/baf45478-5de0-4cf5-b8cc-84e34ddacced

Sec. 59-58. - General service schedule TOU.

(a) Availability. This schedule is available only to non-residential customers meeting the criteria of the next sentence requiring electrical loads having a demand greater than or equal to 100 kw during at least three months of a 12-month period and an average annual load factor of at least 55 percent. This schedule is not available for auxiliary or breakdown service, or individual customers who qualify for either a residential or industrial rate schedule. Service under this schedule shall be available for customers with a single enterprise located entirely on a single, contiguous premise. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power, or as a substitute for power contracted for or which may be contracted for under any other schedule of the city, except at the option of the city for service in conjunction with the renewable energy generation rider, or under special terms and conditions expressed in writing in the contract with the customer. The obligations of the city in regard to supplying power are dependent upon its securing and retaining all necessary right-of-ways, privileges, franchises and permits, for the delivery of such power. The city shall not be liable to any customer or applicant for power in the event it is delayed in, or is prevented from furnishing the power by its failure to secure and retain such right-of-ways, rights, privileges, franchises and permits. (b) Applicability. This schedule is applicable to all electric service of the same available type supplied to customer's premises at one point of delivery through one kilowatt-hour meter. (c) Type of service. (1) The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages where available: Single-phase, 120/240 volts; or 3-phase, 208Y/120 volts, 480Y277 volts; or 3-phase, 3-wire, 240, 480, volts; or 3-phase, 12470/7200 volts; or Three-phase voltages other than these listed above, but only at the city's option and provided that the size of the customer's contract warrants a substation solely to serve that customer, and further provided that the customer furnish suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault build in accordance with the city's specification. (2) The type of service supplied will depend upon the voltage available. Prospective customers should ascertain the available voltage by contacting the office of the city before purchasing equipment. (3) Motors of less than five hp may be single-phase. All motors of more than five hp must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the service of the city, to permit other types of motors. (d) Monthly rate. The monthly rate under this Schedule shall be as provided in subsection 59-40(a), and may include charges for a purchase power adjustment rider (§ 59-41 et seq.), and/or a portfolio standard renewable energy rider (§ 59-42 et seq.), and/or an "extra facilities charge" rider (§ 59-43 et seq.), and shall include a "minimum bill" comprised of the three charges named "basic facilities charge", "demand charge" and "energy charge" all as found in the "schedule of user fees and charges" (see subsection 59-40(a)), a "billing demand" as provided below and a "power factor correction" provided in subsection 59-53(c)(3). (1) This rate schedule includes fixed charges and charges that vary with both the time of day and season of the year. The on-peak and off-peak months and hours are defined as: Summer Months | Winter Months June—September | October—May On-Peak period hours | 1:00 p.m.—7:00 p.m. Monday—Friday | 6:00 a.m.—9:00 a.m. Monday—Friday Off-peak hours: | All other weekday hours and all Saturday and Sunday hours. (2) Billing demand. The monthly rate shall include a charge for billing demand combining both the on-peak and economy demands (the city shall determine, in its sole discretion, the applicable billing method): (i) The on-peak billing demand each month shall be the largest of the following: a. The maximum integrated 30-minute demand measured during the on-peak period during the month for which the bill is rendered; b. Fifteen kilowatts (kw). (ii) Economy demand. The monthly economy demand shall be defined as the difference between the monthly off-peak demand and the monthly on-peak demand. The monthly economy demand shall not be less than zero. (e) Payment. See subsection 59-40(b).

(Ord. No. 10-01, § 1, 1-14-2010)

Ask a question about Concord law

Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.