§ 59-62 — Large general industrial service time of use rate
Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 59-62
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/fb6c5aea-9f73-463a-a381-ea4c4e28c05a
Sec. 59-62. - Large general industrial service time of use rate.
(a) Availability. This schedule is not available for auxiliary or breakdown service, or for individual customers who qualify for a residential rate schedule. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power, or as a substitute for power contracted for or which may be contracted for under any other schedule of the city, except at the option of the city for service in conjunction with the renewable energy generation rider, or under special terms and conditions expressed in writing in the contract with the customer. The obligations of the city in regard to supplying power are dependent upon its securing and retaining all necessary right-of-ways, privileges, franchises and permits, for the delivery of such power. The city shall not be liable to any customer or applicant for power in the event it is delayed in, or is prevented from furnishing the power by its failure to secure and retain such right-of-ways, rights, privileges, franchises and permits. (b) Applicability. Available only to non-residential loads with a demand greater than or equal to 2000 kW during at least four months of a 12-month period. Service under this schedule should be used for a customer with a single enterprise located entirely on a single, contiguous premise. (c) Types of service. (1) The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages where available: a. Single-phase, 120/240 volts; or b. 3-phase, 208Y/120 volts, 480Y277 volts; or c. 3-phase, 3-wire, 240, 480, volts; or d. 3-phase, 12470/7200 volts; or e. 3-phase voltages other than these listed above, but only at the city's option and provided that the size of the customer's contract warrants a substation solely to serve that customer, and further provided that the customer furnish suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault build in accordance with the city's specification. (2) The type of service supplied will depend upon the voltage available. Prospective customers should ascertain the available voltage by contacting the office of the city before purchasing equipment. (3) Motors of less than 5 H.P. may be single phase. All motors of more than 5 H.P. must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the service of the city, to permit other types of motors. (d) Monthly rates. (1) Basic facilities charge. (2) Plus demand charge. a. On peak demand charge per month. b. Economy demand charge. (3) Energy charge. a. All energy charge per month. (4) Determination of on-peak and off-peak hours. Summer Months | Winter Months April 1—October 31 | November 1—March 31 On-peak period hours | 2:00 p.m.—6:00 p.m. Monday—Friday | 7:00 a.m.—10:00 a.m. Monday—Friday. Off-peak period hours | All hours except the hours of: 1) 2:00 p.m. to 6:00 p.m. during April 1—October 31, Monday through Friday. 2) 7:00 a.m. to 10:00 a.m. during November 1—March 31, Monday through Friday. (5) Determination of billing demand. a. The on-peak billing demand each month shall be the largest of the following: 1. The maximum integrated one hour demand measured during the on-peak period during the month for which the bill is rendered. 2. 15 Kilowatts (kW). b. Economy demand. The monthly economy demand shall be defined as the difference between the monthly off peak demand and the monthly on peak demand. The monthly economy demand shall not be less than zero. In the winter months where there is no peak demand charge the charge for demand during these months will be at the economy demand rate. (6) Minimum bill. The minimum bill shall be the bill calculated on the rate above including the basic facilities charge, demand charge and energy charge. Payment shall be made as per section 59-40(b). (7) Power factor correction. When the average monthly power factor of the customer's power requirements is less than 85 percent, the city may correct the demand in kilowatts for that month by multiplying by 85 percent and dividing by the average power factor in percent for that month. (8) Annual demand surcharge. When the customer KW demand at the wholesale power provider's (currently Duke Power's) peak is higher than the average KW demand billed during the on-peak period, the annual demand surcharge will be applied to the customer's bill. (e) Rate adjustment. This rate will be adjusted every January 1 to include increases or decreases in the city wholesale purchase power cost, as per section 59-40. (f) Renewable energy portfolio standard (REPS) rider. The city's renewable energy portfolio standard (REPS) rider is applicable to all service supplied under this schedule. See section 59-42. Effective for bills rendered on or after December 13, 2012.
(Ord. No. 12-123, § 2, 12-13-2012; Ord. No. 24-46, § 1, 6-13-2024)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.