Sec. 59-60. - Optional time of use schedule 12—OPT.

(a) Availability. This schedule is not available to new customers. Service under this schedule shall be used solely by the contacting customer in a single enterprise, located entirely on a single, contiguous premises. This schedule is not available to the individual customer who qualifies for a residential schedule, nor for auxiliary or breakdown service. Power delivered under this schedule shall not be used for resale or exchange or in parallel with other electric power or as a substitute for power contracted for or which may be contracted for, under any other schedule of the city, expect at the option of the city, under special terms and conditions expressed in writing in the contract with the customer. The obligations of the city in regard to supplying power are dependent upon its securing and retaining all necessary rights-of-way, privileges, franchises and permits, for the delivery of such power. The city shall not be liable to any customer or applicant for power in the event it is delayed in, or is prevented from furnishing the power by its failure to secure and retain such rights-of-way, rights, privileges, franchises and permits. (b) Applicability. This schedule is applicable to "service establishments" and is supplied to customer's premises at one point of delivery through one kilowatt-hour meter. (c) Types of service. (1) The city will furnish 60 Hertz service through one meter, at one delivery point, at one of the following approximate voltages where available: Single-phase, 120/240 volts; or 3-phase, 208Y/120 volts, 480Y277 volts; or 3-phase, 3-wire, 240, 480, volts; or 3-phase, 12470/7200 volts; or Three-phase voltages other than those listed above may be at the city's option, if the size of the customer's contract warrants a substation solely to serve that customer, and if the customer furnishes suitable outdoor space on the premises to accommodate a ground-type transformer installation, or substation, or a transformer vault built in accordance with the city's specifications. (2) The type of service supplied will depend upon the voltage available. Prospective customers should ascertain the available voltage by inquiry at the office of the city before purchasing equipment. (3) Motors of less than five hp may be single-phase. All motors of more than five hp must be equipped with starting compensators. The city reserves the right, when in its opinion the installation would not be detrimental to the service of the city, to permit other types of motors. (d) Monthly rate. (1) The monthly rate under this schedule shall be as provided in subsection 59-40(a), and may include charges for a purchase power adjustment rider (§ 59-41 et seq.), and/or a portfolio standard renewable energy rider (§ 59-42 et seq.), and/or an "extra facilities charge" rider (§ 59-43 et seq.), and shall include a "minimum bill" calculated on the following rates: basic facilities charge, demand charge, and energy charge (all as found in the "schedule of user fees and charges"), but the sum of the on-peak demand and economy demand charges shall not be less than $1.79 per month per kw of contract demand (see (d), contract demand, below), a "billing demand" as provided below in subsection (2), a "power factor correction" provided in subsection 59-53(c)(3), and a seasonal and daily rates as provided immediately below. The on-peak and off-peak hours are defined as: Summer Months | Winter Months June—September | October—May On-peak period hours | 1:00 pm—9:00 p.m. Monday—Friday | 6:00 a.m.—1:00 p.m. Monday—Friday Off-peak hours: All other weekday hours and all Saturday and Sunday hours. All hours for the following holidays shall be considered as off-peak: New Year's Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. (2) Billing demand: The billing demand each month for this rate schedule shall be calculated by combining the following two billing demands, economy and on-peak: (i) The on-peak billing demand each month shall be the largest of the following: a. The maximum integrated 30-minute demand measured during the on-peak period during the month for which the bill is rendered; and b. Fifty percent of the contract demand (or 50 percent of the on-peak demand if specified in the contract); and c. Fifteen kilowatts (kw). (The city shall determine, in its sole discretion, the applicable billing method for on-peak billing demand.) (ii) Economy demand. The monthly economy demand shall be defined as the difference between the monthly off-peak demand and the monthly on-peak demand. The monthly economy demand shall not be less than zero. (e) Contract demand. The city shall establish contracts to specify the maximum demand to be delivered to the customer which shall be the contract demand. The contract demand shall be the maximum demand for the previous 12 months, including the month the bill is rendered. Where the customer can restrict on-peak demand to levels considerably below that of the contract demand, the city may also contract for a limited on-peak contract demand in addition to the contract demand.

(Ord. No. 10-01, § 1, 1-14-2010)