For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 70-583 — General responsibilities

Code of Ordinances, City of Durham, North Carolina (Supp. No. 37, Update 1: codified through Ordinance No. 16682, adopted June 15, 2026) · Durham City Code § 70-583

Corpus is an independent public-information project, not the official City of Durham website. Stable reference: corpuslaw.us/code/0a13c0b4-f92c-4740-a9c4-59d0f9c251ae

Sec. 70-583. - General responsibilities.

(a) Department of Water Management (Department) CCC Program Responsibilities. The department shall administer the City of Durham's CCC Program, which must address containment and isolation of potential contamination of the potable water supply due to cross connections. The CCC Program shall, in conjunction with the DWM, set standards that address both containment and isolation of potential contamination resulting from cross connections. The CCC Program shall ensure that requirements of this article and the standards are implemented. The CCC Program shall also review building permit applications and perform plan reviews as they pertain to cross connection and backflow protection. CCC staff shall verify the following prior to issuance of building permits or issuance of Certificates of Compliance (COC) by the Durham City-County Inspections Department: (1) That the building has the required backflow protection; (2) That the design of new buildings includes the required backflow protection; (3) That installed backflow preventers are in compliance with the annual testing requirements of this article and the standards. (b) Department of Water Management Director (Director) Responsibilities. (1) The director shall appoint a CCC Administrator who, along with the director, is authorized to interpret this article and the standards, and enforce the CCC Program. (2) The director is authorized to enter into agreements (or contracts) delegating oversight of compliance with the city's backflow testing requirements to connected User water systems when the following requirements are met: a. The ORC must be, a NCWTFOCB certified ORC Cross Connection Control System Operator (15A NCAC 180.0206 subsection (d)l. b. Containment backflow preventers must be installed and maintained at all connections to the city's water distribution system immediately downstream of the water meter and prior to any branching of the user's water system. The annual reporting of City Code §70-588 must still be met. c. Isolation backflow preventers must be installed and maintained at all cross connections downstream of the water meter within the user's/consumer's potable water system at the point of use. The annual reporting of City Code §70-588 must still be met. (c) Responsibilities of the CCC Administrator (Administrator). The administrator will, in conjunction with the director, interpret this article and the standards, and enforce the CCC Program. A delegated organization (Refer to §70-583.B) shall maintain records for all containment and isolation BFPAs, including the location, type, manufacturer, model, size, serial number, and hazard of each BFPA. All tests and maintenance records for each BFPA shall be available to the city for audit and inspection upon request. (d) Responsibilities of the user. (1) Existing conditions. (a) Users shall not allow contamination of the city's water distribution system, nor allow the creation or use of a cross connection that is prohibited under this article. (2) Users shall: a. Eliminate all unprotected cross connections that are prohibited under this article. b. Install one or more approved BFPAs for those cross connections requiring BFPAs under this article within the time frames established under the standards. c. Bear all responsibility and cost for the installation, testing, maintenance, cleaning, repair, replacement, relocation, inspection, and permitting of BFPAs required under this article and for all associated plumbing work. d. Ensure installers and testers hold the appropriate licenses as required by the North Carolina State Building Code and City of Durham Code of Ordinances. e. Maintain BFPAs and ensure all BFPAs are functioning properly by the deadline established by the CCC Administrator. f. Ensure all BFPAs are tested and results of operational tests are submitted using the City's designated electronic reporting system managed by the currently contracted vendor as published at www.durhamnc.gov. Required reports shall be submitted by the deadline established by the CCC Administrator. g. Ensure that all non-residential properties have domestic containment. h. Ensure that all properties have isolation backflow protection in compliance with all applicable codes. i. All tests and maintenance records for each BFPA shall be available to the City for audit and inspection upon request. j. Ensure that all backflow prevention assemblies are protected against freeze damage. No Backflow shall be installed in a manner by which it is subject to freezing. Systems such as lawn irrigation may be installed with unions and an upstream, shut-off valve not subject to freezing. (3) Notification of Property Change. a. Use Change - Users shall notify the CCC Administrator regarding any changes in the use of a property. The CCC Administrator will determine if changes to the cross connection protection (i.e., BFPAs) are required based on the change. b. Ownership Change - Users shall notify the CCC Administrator, or the City's designated electronic reporting system regarding any changes in the ownership of a property. The CCC Administrator will determine if changes to the cross connection protection (i.e., BFPAs) are required based on the change. (4) Installation of Backflow Prevention Assemblies. a. Installation of BFPAs shall be performed by persons with the appropriate licenses as required by the North Carolina Administrative Code and the North Carolina Building Code. b. Person performing the work shall be defined as an employee in accordance with 21 NCAC 50.0512 of a company holding the proper licenses. c. The Department may require permits for BFPA installation, replacement, relocation, removal, and any other application required under this Article. Users shall obtain required backflow, plumbing, and/or fire protection system permits that are required prior to BFPA installation. Initial testing shall not be performed using a jumper or by-pass around a missing meter. d. All BFPA installations shall be completed in accordance with established standards. e. All BFPA installations shall have an approved shut-off valve installed upstream of each backflow, excluding fire protection, in accordance with the NC Plumbing Code section 606.2. f. All BFPA installations shall have an approved wye mesh strainer installed upstream of each backflow, excluding fire protection, in accordance with manufacturer recommendations. The strainer provided in a pressure reducing valve is not an approved wye mesh strainer. g. All backflow preventers are to be installed in manner where they will not become submerged. All BFPA shall have positive drainage with adequate gravity drainage to atmosphere, not pumped. (5) Compliance Deadlines. a. A user that has not met the minimum testing requirements for annual testing as described in Code §70-588(8) by the established deadline shall be in violation of this code. b. A user that has received a notice as described in §70-591, shall comply with the requirements. If the notice requires the installation of an approved BFPA or requires the removal of an unprotected cross connection, and an imminent danger to the water system or to public health does not exist, the User shall take the required action within 60 days from the date that the notification is deemed received, as described in Code §70-591. c. If the CCC Administrator has determined that an imminent danger to the water system or to public health exists, a shorter compliance time may be specified in the notice. d. In cases that do not present an imminent danger to the water system or to public health, the CCC Administrator may extend the time for compliance for up to an additional 30 days if compliance efforts are underway and continuing, and the existence of a hardship or special circumstances can be demonstrated. The extension shall only be valid if it is provided in writing and signed by the CCC Administrator. e. All BFPAs shall be tested and results submitted, including failures, to the City of Durham, via the City's designated electronic reporting system by the deadline established by the CCC Administrator. (6) Failure to Comply. A User that fails to comply with a notice issued by the CCC Administrator, or with the deadlines described in Code § 70-583.D.4 will be in violation of this Article. (7) Responsibilities of an Inspector. Cross connection inspectors are required to inspect properties served by the City's water distribution system on such a schedule as set by the CCC Administrator to: a. Identify protected, unprotected, and under protected CCs to determine compliance with regulations; b. Provide a detailed inspection summary to ensure compliance with Standards; c. Determine the hazard level (High or Low) of cross connections and required BFPAs; d. Inspect installed BFPAs to determine if there are problems with the installation; and e. Perform inspections per the NC Building Code and the City Code and Standards, and enter accurate notes into the City's designated electronic portal. As a condition of continued city water service, the cross connection inspectors shall have the right to enter, at any reasonable time, any property connected to the city's water distribution system for the purpose of performing the duties of this article. Refusal of entry may result in the termination of water service. No person shall interfere with a cross connection inspector in the performance of the activities authorized by this article. (8) Responsibilities of a tester. Responsibilities of certified backflow testers include: a. Testing installed BFPAs at the time of installation, at least annually, after repairs, after cleaning, after relocation or replacement, and when responding to a reported backflow incident. b. Maintaining required certifications and licenses to test BFPAs in the City of Durham as required by State law and the City Code and Standards. c. Tester ethics and code of conduct: i. Testers shall not falsify any data or results obtained from field tests performed by the tester. ii. Tester shall not sign or submit any test reports to the City of Durham if the tester did not personally perform the test. iii. Testers shall not make any unneeded repairs, replacements, not repair BFPAs with any part not specifically designed for the BFPA being repaired. iv. A Tester shall not remove, straight-pipe, or bypass any BFPA that would create an unprotected cross connection. v. A Tester shall not perform a test using water through a bypass or jumper around a meter. vi. A tester shall perform tests using City of Durham- Specified Test Procedures only (Vertical Sight Tube or Differential Pressure Gage, short downstream tube, compensating tee and bleed off valve). A copy of these test procedures will be provided to all City of Durham Approved Testers upon request. Furthermore, Testers will verify all components required for field-testing are present (i.e., inlet and outlet shut off valves, all test cocks). Any discrepancies shall be listed on the Testing and Maintenance Report. vii. Following the installation of a new BFPA, testers are required to submit appropriate Testing and Maintenance Report to the City of Durham prior to scheduling the Cross Connection Control Backflow Permit inspection. viii. The tester shall also provide a copy of their test results to the customer or tenant upon completion of the procedure. ix. For existing BFPAs, testers are required to submit the appropriate Testing and Maintenance Report, both passing and failing to the City of Durham, via the city's designated electronic reporting system no later than the established deadline set by the CCC Administrator. In addition, the Testing and Maintenance Report shall be submitted to the city by the deadline or within five calendar days of the date the test is performed, whichever is earlier. If test reports are received more than five days after the date of test, they will not be accepted and the Tester will be required to re-test the BFPA in question and submit the form within the required period. The tester shall also provide a copy of their test results to the customer upon completion. x. Tester shall be employed in accordance with 21 NCAC 50.0512 EMPLOYEES EXEMPTED FROM LICENSURE. xi. It is the responsibility of all City of Durham approved backflow testers to maintain their testing equipment, including differential pressure gauges which shall be checked per manufacturer specifications at least once annually. xii. A tester is required to observe, verify, and record the make, model, size, serial number, and location of all BFPAs while performing a field test. xiii. A tester shall recognize the degree of hazard present when testing an BFPA, and if the BFPA is not adequate to safeguard the degree of hazard, the tester shall test the BFPA and notify the CCC Administrator of the inadequate protection. If the BFPA is installed in a manner inconsistent with existing City of Durham code requirements or Standards (in a ceiling, PVC, etc.), a Tester is required to note that discrepancy on the Test and Maintenance Report. Any tester failing to conform to the provisions of this article or the Tester Ethics and Code of Conduct will be in violation of this Code and will be subject to loss of testing privileges within the City of Durham's water system jurisdiction. Loss of testing privileges in Durham will result in notification to the approved reciprocal testing entities in NC.

(Ord. No. 15942, § 1, 6-6-2022)

Ask a question about Durham law

Corpus searches the Durham sections it holds and shows the ones that match, with their citations. Free, no sign-in.