§ 6.3.3 — Soil Erosion and Sedimentation Control Plan

Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 6.3.3

Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/f19a8d8f-0011-4632-9035-82af2aaf2a2e

6.3.3. - Soil Erosion and Sedimentation Control Plan

Land-disturbing activities subject to the standards in this section shall require prior approval of a soil erosion and sediment control plan prepared in accordance with the following standards. A. Preparation of Plan 1. The soil erosion and sedimentation control plan shall be prepared by, and shall bear the seal and signature of a licensed professional engineer, registered landscape architect, certified professional in erosion and sedimentation control (CPESC), or a registered surveyor to the extent permitted by North Carolina law, at a scale not less than 1 inch equals 100 feet. 2. The plan shall be filed with the Planning and Development Director, and the applicable Soil and Water Conservation District, 30 days prior to the commencement of the proposed activity. 3. Plans submitted for sites less than 1 acre do not require a seal and signature of a licensed professional engineer, registered landscape architect, certified professional in erosion and sedimentation control (CPESC), or registered surveyor. B. Submission of Plan 1. A person conducting land-disturbing activity that proposes to disturb or uncover 1 or more acres shall submit an erosion control plan with the Engineering Services Director, at least 30 days prior to beginning such activity and shall keep another copy of the plan on file at the job site. 2. If the Engineering Services Director, either upon review of such plan or on inspection of the job site, determines that a significant risk of accelerated erosion or off-site sedimentation exists, the Engineering Services Director shall require a revised plan. 3. Pending the preparation of the revised plan, work shall cease or shall continue under conditions outlined by the appropriate authority. C. Financial Responsibility Statement 1. Soil erosion and sedimentation control plans shall be disapproved unless accompanied by an authorized statement of financial responsibility and ownership. 2. This statement shall be signed by the person financially responsible for the land-disturbing activity or his attorney in fact. 3. The statement shall include the mailing and street addresses of the principal place of business of the person financially responsible and landowner, or their registered agents. 4. If the person financially responsible is not a resident of North Carolina, a North Carolina agent must be designated in the statement for the purpose of receiving notice of compliance or non-compliance with the plan, the North Carolina Environmental Policy Act, this Ordinance, or rules or orders adopted or issued pursuant to this Ordinance. D. Plan Requirements The plan required by this section shall contain architectural and engineering drawings, maps, assumptions, calculations, and narrative statements as needed to adequately describe the proposed development of the land and the measures proposed to ensure compliance with the requirements of this section. Plan content may vary to meet the needs of specific site requirements. Detailed guidelines for plan preparation can be found in the Development Guide . E. North Carolina Division of Water Resources Approval Required The landowner or developer shall forward to the Director of the North Carolina Division of Water Resources, a plan for any land-disturbing activity that involves the utilization of ditches for the purpose of de-watering or lowering the water table of a tract. Written documentation of this plan submittal shall be provided to the Engineering Services Director prior to approval of an erosion and sedimentation control plan. F. Conservation District Review Within 20 days of receipt of any plan, the applicable Soil and Water Conservation District shall review it and submit its comments and recommendations to the Engineering Services Director. Failure of the Soil and Water Conservation District to submit its comments and recommendations within 20 days shall not delay final action on the plan. G. Engineering Services Director Review 1. The Engineering Services Director shall review each complete plan submitted within 30 days of the date it is determined complete and notify the person submitting the plan that it is approved, approved with conditions, approved with performance reservations, or disapproved. 2. Failure to approve or disapprove a soil erosion and sedimentation control plan within 30 days of the date it is determined to be complete shall result in its being approved. 3. If the plan is disapproved, the reasons for the denial shall be stated in writing. 4. The Engineering Services Director shall approve or deny a revised soil erosion and sedimentation control plan within 15 days of receipt, or it shall be deemed approved. 5. If, following commencement of a land-disturbing activity pursuant to an approved plan, the Engineering Services Director determines that the plan is inadequate to meet the requirements of this Ordinance, the Engineering Services Director may require revisions as necessary for compliance. 6. A plan submitted for a land-disturbing activity for which an environmental document is required by the North Carolina Environmental Policy Act (North Carolina General Statutes Section 113A-1, et seq.) shall be deemed incomplete until a complete environmental document is available for review. The Engineering Services Director shall promptly notify the person submitting the plan that the 30 day time limit for review of the plan pursuant to this section shall not begin until a complete environmental document is available for review. H. Grounds for Plan Denial A soil erosion and sedimentation control plan shall be disapproved if: 1. It fails to adequately meet the basic control objectives or detail provisions of this Ordinance; 2. Implementation of the plan would result in a violation of rules adopted by the Environmental Management Commission to protect riparian buffers along surface waters; or 3. If its content is inadequate. I. Other Denials 1. A soil erosion and sedimentation control plan shall be disapproved if there is a finding that an applicant, a parent, subsidiary, or other affiliate of the applicant: (a) Is conducting or has conducted land-disturbing activity without an approved plan, or has received notice of violation of a plan previously approved by the North Carolina Sedimentation Control Commission or the Engineering Services Director and has not complied with the notice within the time specified in the notice; (b) Has failed to pay a civil penalty assessed pursuant to the Environmental Policy Act or this Ordinance which is due and for which no appeal is pending; (c) Has been convicted of a misdemeanor pursuant to North Carolina General Statutes Section 113A-64(b) or any criminal provision of this Ordinance; or (d) Has failed to substantially comply with State rules adopted pursuant to the Act or regulations of this Ordinance. 2. For purposes of this subsection, an applicant's record may be considered for only the 2 years prior to the application date. J. Application Amendments An amendment to a soil erosion and sedimentation control plan may be submitted in written and/or graphic form and shall be reviewed in the same manner as the original application. Until such time as the amendment is approved, the land-disturbing activity shall not proceed except in accordance with the plan as originally approved. K. Work Conducted from Approved Plan A person engaged in land-disturbing activity who fails to file a plan in accordance with this Ordinance, or who conducts a land-disturbing activity except in accordance with provisions of an approved plan shall be deemed in violation of this Ordinance. L. Plan Approval Required for Permit If land-disturbing activity is subject to the requirements of this section, a building permit shall not be issued unless a soil erosion and sedimentation control plan is submitted to the Engineering Services Director, a land disturbance permit issued in accordance with Section 2.5.10, Land Disturbance Permit (if required), and initial soil erosion and sedimentation control devices are installed and are functioning properly. M. Work Completed Before Final Subdivision Approval A final plat approval or certificate of occupancy shall not be issued unless work at the site is completed in accordance with a valid land disturbance permit, or financial guarantee is approved and accepted as required by this Ordinance. N. Financial Guarantee The applicant for a land disturbance permit to grade more than 1 acre may be required to file with the Engineering Services Director a financial guarantee to cover all the costs of protection of the site, which shall be established in accordance with Section 2.6, Financial Guarantees. The guarantee shall remain in force until the work is completed in accordance with the land disturbance permit and the work is approved by the Engineering Services Director. Upon violation of this Ordinance, the Engineering Services Director may draw on the financial guarantee in accordance with Section 2.6, Financial Guarantees, to establish protective cover on the site, to control the velocity of runoff, and/or prevent off-site sedimentation.

(Ord. No. 7287/17-29, § 14, 4-3-2017; Ord. No. 7622/20-38, § 11.D, 8-5-2020)

Ask a question about High Point law

Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.