6.3.5. - Mandatory Standards for Land-Disturbing Activity
Land-disturbing activity shall comply with the following requirements: A. Undisturbed Buffer Zone Required 1. Land-disturbing activity shall not be permitted in proximity to a lake or natural watercourse unless an undisturbed buffer zone 25 feet wide is provided, or a buffer zone is provided along the margin of the watercourse of sufficient width to confine visible siltation within the 25 percent of the buffer zone nearer the land-disturbing activity, provided that these standards shall not apply to a land-disturbing activity in connection with the construction of facilities to be located on, over, or under a lake or natural watercourse. 2. Unless otherwise provided, the width of a buffer-zone is measured from the edge of the water to the nearest edge of the disturbed area, with the 25 percent of the strip nearer the land-disturbing activity containing natural or artificial means of confining visible siltation. 3. Waters that have been classified as trout waters by the North Carolina Environmental Management Commission shall have an undisturbed buffer zone 25 feet wide, or of sufficient width to confine visible siltation within the 25 percent of the buffer zone nearest the land-disturbing activity, whichever is greater. Provided, however, that the Engineering services Director may approve plans which include land-disturbing activity along trout waters when the duration of the disturbance is temporary and the extent of the disturbance is minimal. 4. The 25 foot minimum width factor for an undisturbed buffer zone adjacent to designated trout waters shall be measured horizontally from the top of the bank. 5. Where a temporary and minimal disturbance is permitted, land-disturbing activities in the buffer zone adjacent to designated trout waters shall be limited to a maximum of 10 percent of the total length of the buffer zone within the tract so that there is not more than 100 linear feet of disturbance in each 1000 linear feet of buffer zone. Larger areas may be disturbed with the written approval of DENR. 6. Land-disturbing activity shall not be undertaken within a buffer zone adjacent to designated trout waters that will cause adverse temperature fluctuations in these waters, as established in 15 NCAC 2B.0211 "Fresh Surface Water Classification and Standards". B. Fill Material Unless a permit from the Public Services Director to operate a landfill is on file for the official site, acceptable fill material shall be free of organic or other degradable materials, masonry, concrete and brick in sizes exceeding 12 inches, and any materials which would cause the site to be regulated as a landfill by the State of North Carolina. C. Graded Slopes and Fills 1. The angle for graded slopes and fills shall be no greater than a 2-to-1 slope (horizontal to vertical) if they are to be stabilized with vegetative cover. 2. Slopes or fills steeper than 2-to-1 must be protected by structures. 3. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. D. Ground Cover Whenever land-disturbing activity is undertaken on a tract, the person conducting the land-disturbing activity shall install such sedimentation and erosion control devices and practices as are sufficient to retain the sediment generated by the land-disturbing activity within the boundaries of the tract during construction upon and development of said tract, and shall plant or otherwise provide a permanent ground cover sufficient to restrain erosion after completion of construction or development. Except as provided in Section 6.3.6 B, High Quality Water Zones, of this Ordinance, provisions for permanent ground cover sufficient to restrain erosion must be accomplished within 90 calendar days following completion of construction or development.
(Ord. No. 7984/24-01, § 2(Pt. A), 1-16-2024)