§ 6.3.6 — Design and Performance Standards

Code of Ordinances of the City of High Point, North Carolina (Codified through Ordinance No. 8067/25-45, enacted November 17, 2025 (Supp. No. 9)) · High Point Development Ordinance § 6.3.6

Corpus is an independent public-information project, not the official City of High Point website. Stable reference: corpuslaw.us/code/0fce8da3-d671-42e9-9c86-8abbd4e5c4ae

6.3.6. - Design and Performance Standards

A. Design for 10-Year Storm Except as provided in Section 6.3.6 B, High Quality Water Zones, erosion and sedimentation control measures, structures, and devices shall be so planned, designed, and constructed to provide protection from the calculated maximum peak rate of runoff from the 10-year storm. Runoff rates shall be calculated using the procedures in the USDA, Soil Conservation Service's "National Engineering Field Manual for Conservation Practices," or other acceptable calculation procedures. B. High Quality Water Zones In high quality water (HQW) zones, the following design standards shall apply: 1. Uncovered areas in HQW zones shall be limited at any time to a maximum total area within the boundaries of the tract of 20 acres. Only the portion of the land-disturbing activity within a HQW zone shall be governed by this section. Larger areas may be uncovered within the boundaries of the tract with the written approval of DENR. 2. Soil erosion and sedimentation control measures, structures, and devices within HQW zones shall be planned, designed, and constructed to provide protection from the runoff of the 25-year storm which produces the maximum peak rate of runoff as calculated according to procedures in the United States Department of Agriculture Soil Conservation Service's "National Engineering Field Manual for Conservation Practices" or according to procedures adopted by any other agency of this State or the United States or any generally recognized organization or association. 3. Sediment basins within HQW zones shall be designed and constructed so the basin will have a settling efficiency of at least 70 percent for the 40 micron (0.04 mm) size soil particle transported into the basin by the runoff of that 2-year storm which produces the maximum peak rate of runoff as calculated according to procedures in the United States Department of Agriculture Soil Conservation Service's "National Engineering Field Manual for Conservation Practices" or according to procedures adopted by any other agency of this State or the United States or any generally recognized organization or association. 4. Newly constructed open channels in HQW zones shall be designed and constructed with side slopes no steeper than 2 horizontal to 1 vertical if a vegetative cover is used for stabilization unless soil conditions permit a steeper slope or where the slopes are stabilized by using mechanical devices, structural devices, or other acceptable ditch liners. In any event, the angle for side slopes shall be sufficient to restrain accelerated erosion. 5. Ground cover sufficient to restrain erosion must be provided for any portion of a land-disturbing activity in a HQW zone within 7 days of completion of any phase of grading. C. Sedimentation Basins Except as provided for in Section 6.3.6 B, High Quality Water Zones, above, all sedimentation basins shall be designed and constructed to have a settling efficiency of at least 70 percent for the 40 micron (0.04 mm) size soil particle.

Ask a question about High Point law

Corpus searches the High Point sections it holds and shows the ones that match, with their citations. Free, no sign-in.