For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20.06.650 — Section 3303 Amended; Demolition of Buildings

Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 20.06.650

Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/b5346559-ae77-4a9a-9b7e-cabcad86be9d

20.06.650 Section 3303 Amended; Demolition of Buildings.

Section 3303 of the International Building Code is amended to read as follows: SECTION 3303 DEMOLITION OF BUILDINGS 3303.1 Purpose. The purpose of this section is to regulate and provide minimum standards for the demolition of buildings. 3303.2 Definition. For the purpose of this section, the word “demolish” is defined as follows: Demolish shall mean and include the razing, tearing down, or removal of all or part of a building; the removal of the outer facing of a building but leaving a skeleton or structural frame; or the removal of an upper story or stories of a building. Demolish shall also include “deconstruction” which is the whole or partial disassembly of structures for the purposes of reusing salvaged building materials. 3303.3 Demolition permit. 3303.3.1 Permit required. No person shall demolish or remove a building, or part thereof, without first having obtained a permit therefor from the building official. 3303.3.2 Application for permit. To obtain a demolition permit the applicant shall first file an application therefor in writing on a form furnished by the building official. Such application shall set forth a statement of the facts necessary to fully describe the building, its use, its legal description, and address. Provisions shall be made by the applicant for the proper abandonment of all utilities as required by this code before a demolition permit may be issued. Applications for demolition permits shall expire 180 days after the application date. 3303.4 Advisory note; safety requirements. All demolition work should be performed in conformance with “Safety Requirements for Demolition,” ANSI A10.6-1990 as published by American National Standards Institute, Inc. 3303.5 Liability insurance. Whenever any building which is to be demolished has been used, or is being used, for any occupancy group except detached one- or two-family occupancies, the person applying for the demolition permit shall, as a part of the application, be required to: (1) At all times maintain public liability insurance coverage for all claims arising out of all work in the City of Lincoln and within three miles of the corporate limits thereof done by or under the supervision of the demolition contractor under the provisions of this code. Such insurance shall be in the form of a commercial or comprehensive general liability policy, or an acceptable substitute policy form as permitted by the City Attorney, with a minimum combined single limit of $500,000.00 aggregate for any one occurrence on any job for which a permit is required under this code, provided the City of Lincoln shall be named an additional insured thereunder. The coverages required herein shall be subject to review and approval by the City Attorney for conformance with the provisions of this section. (2) At all times keep on file with the building official a current certificate of insurance signed by a qualified agent of an insurance company licensed to do business in the State of Nebraska and approved by the City Attorney for conformance with the provisions of this section evidencing the existence of valid and effective policies of insurance naming the city as an additional insured for the coverage required by subsection 1 of this section, the limits of each policy, the policy number, the name of the insurer, the effective date and expiration date of each policy, the deductibles or self-insurance retainers of each policy, and a copy of an endorsement placed on each policy requiring thirty days notice by mail to the building official before the insurer may cancel the policy for any reason, and upon request of the building official or the City Attorney, a copy of any endorsements placed on such policies or the declarations page of such policies. Any termination, reduction, or lapse of such insurance shall automatically terminate the privilege of the demolition contractor to be issued permits under the provisions of this code, unless other insurance meeting the requirements of this section is provided and in full force and effect at the time of such termination or cancellation. Where the building official determines that the proposed demolition of a building involves a greater risk than normal, the building official may require a certificate evidencing liability coverage in excess of the minimum sum stated above. 3303.6 Permit fees. A fee for each demolition permit shall be paid to the building official as set forth in Section 20.06.130 of the Lincoln Municipal Code. Where work for which a permit is required by this chapter is commenced prior to obtaining said permit, the fees above specified shall be doubled. The payment of such double fee shall not relieve any person from fully complying with the requirements of this chapter in the execution of the work or from any other penalties prescribed herein. The applicant shall apply and pay for any street use permit and any permit for parking meters which shall be out of use during the demolition. Fee refunds shall be in accordance with Section 109.6. 3303.7 Utility disconnection. All water and sanitary sewer services shall be disconnected and sealed in accordance with the Lincoln Municipal Code Chapter 17.10 and said disconnects shall be inspected and approved by the Transportation and Utilities Department. 3303.8 Completion of demolition work. All demolition work, including the removal of the foundation, must start within 30 days and must be completed within 60 days from the date of the demolition permit issuance. Upon completion of the demolition work, the applicant shall clean the premises of all debris, request an inspection of the premises, and then fill all excavations and grade the area with top soil or other material approved by the building official. 3303.9 Building official may stop demolition. The building official shall have the authority to stop the demolition or removal of any building or structure or part thereof, when the same is being done in a reckless or careless manner, or in violation of the provisions of this chapter or any other ordinances of the city. When such work is stopped by order of the building official, it shall not be resumed without approval of the building official. A demolition permit may be revoked by the building official at any time upon a violation of the terms thereof, or upon a violation of any provision of this chapter or any other ordinance of the city. 3303.10 Securing the demolition site. All demolition sites shall be secured at all times during the demolition process. 3303.11 Expiration. All demolition permits shall expire after 60 days from issuance. The building official may allow an extension of 30 days due to extenuating circumstances. Demolition must be completed in accordance with 3303.8. ( Ord. 20257 §65; October 19, 2015).

(Ord. 20747 §117; February 25, 2019)

Ask a question about Lincoln law

Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.