§ 25.12.090 — Section 112.2 Amended; Required Inspections and Testing

Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 25.12.090

Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/f1db4e59-c264-4ff1-86a8-87668a735f6b

25.12.090 Section 112.2 Amended; Required Inspections and Testing.

Section 112.2 of the International Fuel Gas Code is amended to read as follows: 112.2 Required inspection and testing. The Code Official, upon notification from the permit holder or the permit holder’s agent, shall make the following inspections and other such inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or the permit holder’s agent of violations that must be corrected. The holder of the permit shall be responsible for the scheduling of such inspections. The Code Official may require that every request for inspection be filed at least one day before such inspection is desired. Such request may be online or by telephone at the option of the Code Official. It shall be the duty of the person requesting inspection of any equipment regulated by this code to provide access and means for proper inspection of such equipment. It shall also be the duty of the person requesting final inspection to determine that the equipment is operational with permanent gas and/or electrical connections before requesting such final inspection. (1) 1. Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks, and other rubble that would damage or break the piping or cause corrosive action, clean backfill shall be on the job site. (2) 2. Rough-in inspection shall be made after the roof, framing, fire blocking, and bracing are in place and all ducting and other components to be concealed are complete, and prior to the installation of wall or ceiling membranes. (3) 3. Final inspection shall be made upon completion of the mechanical system. The owner of the property shall have the duty of requesting the final inspection and to provide access and a means for proper inspection. The requirements of this section shall not be considered to prohibit the operation of any heating equipment or appliances installed to replace existing heating equipment or appliances serving an occupied portion of a structure provided that a request for inspection of such heating equipment or appliances has been filed with the department not more than 48 hours after such replacement work is completed, and before any portion of such equipment or appliances is concealed by any permanent portion of the structure. (: Ord. 20528 §10, August 21, 2017).

(Ord. 21816 §7; December 15, 2025)

Ask a question about Lincoln law

Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.