§ 735-25: Permit review, inspection and supervision escrow fees.
A. If the application and plan conform to the requirements of this chapter, provide for the work to be performed in accordance with the current City of Camden highway specifications and are approved by the City Engineer, the City shall issue the permit upon receipt of the following: (1) Engineer review fee: as set forth in Subsection B below. (2) Performance and maintenance guaranty: as set forth in § 735-25. (3) Inspection fee: as set forth in Subsection C below. B. Engineer review fees. In addition to the permit application fee as provided in § 735-24, largescale project applicants, and applicants deemed eligible by the City Engineer, for the following permits shall pay a minimum fee of $250 for the purposes of review and issuance of the permit, examination of drawings, and initial administrative work performed by the City Engineer or its designee, which fee shall be nonrefundable for the following openings: (1) Applicants for sidewalk and driveway openings; or. (2) Applicants for all curb and roadway openings. C. Inspection and supervision fees. (1) For all projects involving sidewalk, driveway apron or grass area openings or excavations, the minimum inspection fee shall be 5% of the City Engineer's estimate of the cost of repairing and replacing the sidewalk, driveway or grass area or $250, whichever is greater. For all other projects the fee schedule as presented in § 735-25B shall be used. (2) For all projects involving curb and street openings and excavations, the minimum inspection escrow fee shall be 5% of the City Engineer's estimate of the cost of repairing and replacing the curb and street or $500, whichever is greater. For all other projects the fee schedule as presented in in § 735-25B shall be used. (3) For all projects, the applicant shall be required to pay escrow fees for additional inspection required to oversee the correction of unacceptable workmanship as determined by the City Engineer. (4) The inspection and supervision fees as provided for in this Subsection C may be partially or completely waived by the Municipal Engineer where special financial circumstances have been determined to exist. (5) The cost for repairing and/or replacing the excavated area(s) shall be determined by the City Engineer.
[Amended 9-9-2025 by Ord. No. MC-5582 ]
Ask a question about Camden law
Corpus searches the Camden sections it holds and shows the ones that match, with their citations. Free, no sign-in.