§ 735-35 — Temporary paving
Code of the City of Camden, New Jersey · Camden City Code § 735-35
Corpus is an independent public-information project, not the official City of Camden website. Stable reference: corpuslaw.us/code/91a29ac1-6a08-4820-bb6c-f6aa7cc272b1
§ 735-35: Temporary paving.
Upon notice to the City Engineer and under his or her inspection, the permittee shall immediately, after completing the work, refill, properly tamp and restore the excavation or opening with a temporary paving cover as follows: 10 inches of compacted gravel (NJDOT aggregate base course) in all areas and two inches of approved bituminous temporary patch material (cold patch) in paved cartways. The temporary paving cover shall be left in place and maintained by the applicant for a minimum of 60 days and a maximum of 90 days, unless otherwise indicated by the Engineer, after which the temporary paving cover and required portion of compacted gravel shall be removed and replaced with the final paving required by the City Engineer. Improvements to the temporary paving that are deemed necessary due to settlement prior to approval for final paving shall reset the minimum number of days for temporary paving to be maintained by the permittee to 60 days from the date of repair.
Ask a question about Camden law
Corpus searches the Camden sections it holds and shows the ones that match, with their citations. Free, no sign-in.
