For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 735-34 — Final paving

Code of the City of Camden, New Jersey · Camden City Code § 735-34

Corpus is an independent public-information project, not the official City of Camden website. Stable reference: corpuslaw.us/code/fb735a18-8306-40f5-a3b5-82bad126c839

§ 735-34: Final paving.

A. Final paving is to comply with the requirements in the City of Camden and the current edition of New Jersey Department of Transportation (NJDOT) Standard Specifications for Road and Bridge Construction, as amended, herein referred to as "NJDOT Standard Specifications." A lesser specification may be allowed after review by the City Engineer. B. Surface restoration. (1) No permittee shall commence restoration on any street foundation, or surface, or curb and sidewalk, until the City Engineer has determined that settlement of the subsurface is complete and the area properly prepared for restoration. (2) Bituminous pavement over bituminous base course: The street surface shall be permanently restored 12 inches beyond the excavation on all sides by milling the surface surrounding the excavation to a depth of two inches to extend the surface course restoration. The permanent restoration shall consist of a minimum of six inches of dense-graded aggregate, six inches of hot mix asphalt 19M64 base course and two inches of hot mix asphalt 9.5M64 surface course applied with appropriate tack coat to the adjacent pavement surface or a pavement cross section consistent to the existing pavement section. (3) Bituminous pavement over concrete base course: The street surface shall be permanently restored 12 inches beyond the excavation on all sides by milling the surface surrounding the excavation to a depth of two inches to extend the surface course restoration. The permanent restoration shall consist of a minimum of six inches of dense-graded aggregate, six inches of concrete base course and two inches of hot mix asphalt 9.5M64 surface course applied with appropriate tack coat to the adjacent pavement surface or a pavement cross section consistent to the existing pavement section. (4) Concrete surface over stone base: The street surface shall be permanently restored six inches beyond the excavation on all sides by sawcutting the surface surrounding the excavation to a depth of nine inches to extend the surface course restoration. The permanent restoration shall consist of a minimum of six inches of dense-graded aggregate and nine inches of concrete surface course installed with expansion joints adjacent to the existing concrete surface or a pavement cross section consistent to the existing pavement section. (5) At the discretion of the City Engineer, the surface restoration shall extend the whole width of the roadway or of the travel lane. (6) For road openings down the center of the cartway, surface restoration shall extend across the full width of the paved road (both travel lanes). (7) For road openings along the curbline, the road shall be restored along the travel lane. (8) The permittee is responsible for the full restoration of the roadway surface, including restriping, installation of raised pavement markings, speed humps and signage. (9) Any concrete sidewalks disturbed, damaged or disrupted during the excavation or trench opening shall be replaced with concrete sidewalk conforming to all applicable standards of the City of Camden. (10) Where concrete curbing and/or gutters are disturbed, damaged or removed, curbing and gutters of the exact configuration as the existing shall be constructed. Concrete shall be Portland cement concrete, air-entrained, conforming to the NJDOT Standard Specifications for Class B concrete, and shall have a minimum compressive strength of 4,000 pounds per square inch after 28 days. (11) All topsoiled, seeded or otherwise unpaved areas disturbed in the course of the work shall be topsoiled with a minimum thickness of not less than four inches of loam-type topsoil. Fertilizer, lime and other soil conditioners needed to promote the proper growth of grass shall be incorporated and thoroughly worked into the topsoil. Seed or sod of species suitable for growth in the location and environment, and conforming to the requirements of the NJDOT Standard Specifications, shall be placed in all unpaved areas. (12) All gravel shoulder areas disturbed during excavation or trench opening shall be restored and graded to provide and maintain the proper flow of drainage and to provide adequate lateral support of the abutting pavement structure. The gravel material shall be soil aggregate, Type I-6, conforming to the requirements of NJDOT Standard Specifications Section 901. The soil aggregate or gravel shall be a minimum thickness of not less than eight inches compacted thickness. (13) All concrete drive aprons disturbed during the course of excavation or trench opening shall be replaced in accordance with all applicable standards for concrete drive aprons, as set forth in the City of Camden Land Development Ordinance,[1] and shall be constructed of Portland cement concrete, air-entrained, Class B concrete, having a twenty-eight-day compressive strength of 4,000 pounds per square inch and a minimum concrete thickness of six inches and shall be reinforced with welded wire fabric four inches by four inches. (14) Unless this requirement is waived at the time of approval, all restoration of roadway joints are to be thermally fused. (15) In the event of the failure to restore the street opening properly within a reasonable time after the opening has been made or to maintain the restored street properly for a period of one year from the date of the aforesaid certificate of proper restoration, the City may, upon three days' notice to the person receiving the permit, undertake the restoration or maintenance work and have recourse to deposit for compensation.

Ask a question about Camden law

Corpus searches the Camden sections it holds and shows the ones that match, with their citations. Free, no sign-in.