Sec. 30-277. - Electrical inspections.
(a) Temporary poles. Temporary power poles will be inspected to verify compliance with electrical code, as well as, with all other applicable code requirements. (b) Underground. Installations underground will be inspected to verify code compliance with the electrical code, as well as with all other applicable code requirements. (c) Rough-in. Rough-in inspections will be done after wiring is installed in a building and before it is covered by building insulation or other wall covering. To qualify for a rough-in inspection, all supporting and securing of wiring must be completed. Also all grounding conductors must be made up in all boxes and in the electric control panel. All neutral conductors must also be made up in the panel, as well as in all boxes of multi-wire branch circuits. (d) Service. Service inspections may be requested either separately or as part of a rough-in inspection. Services will be inspected to verify compliance with the electrical code, as well as, with all other applicable code requirements. (e) Final. A final inspection will be made after a project is complete. All outlets, devices and lighting fixtures must be installed and working before the final inspection can result in approval. Whenever closet plans call for lighting outlets, the lighting fixtures, and closet shelving shall be installed. All counter tops shall be completed before a final inspection can result in approval.
(Ord. No. 2478, § I, 11-17-08)
Ask a question about Las Cruces law
Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.