For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-279 — Plumbing inspections

Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Development Code § 30-279

Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/e27b8afe-8e7a-46f1-8f08-a3375d0ebb3e

Sec. 30-279. - Plumbing inspections.

(a) Rough-in. Rough in inspection of all piping installations shall be made after all permitted piping has been installed, and before any such piping has been covered or concealed or before any appliances have been attached. All drain, waste and vent piping below the first floor level to a re-vent height is to be filled with water to a minimum head of ten feet for a test then inspected before covering. This inspection includes water distribution piping below a first floor slab. Water distribution is defined as all water piping inside and under the building. (b) Top out. Top out shall be made after all water distribution piping is tested and proven tight in a manner required by the Uniform Plumbing Code, and after all vent piping above the floor to the extensions through the roof and/or wall have been completed, and before any piping is covered or concealed. (c) Mercury test. This inspection shall include an air pressure test, at which time the gas piping shall stand a pressure of not less than ten pounds per square inch (PSI) gauge pressure, or at the discretion of the building official, the piping and valves may be tested at a pressure of at least six inches of mercury measured with a manometer or slope gauge. Test pressures shall be held for a length of time satisfactory to the mechanical inspector, but in no case for less than 15 minutes and with no perceptible drop in pressure. The test for welded piping and at the discretion of the mechanical inspector other piping systems shall be conducted. The test pressure shall not be less than ten (PSI) using a recording device for a period of not less than 24 hours. All necessary apparatus for conducting test shall be furnished by the permittee. (d) This inspection shall be performed on gas piping carrying gas at pressures in excess of 14 inches water column pressure. The gas piping system shall stand a pressure test of not less than ten (PSI) gauge pressure. The test pressure shall be held for a length of time satisfactory to the mechanical inspector, but in no case for less than 15 minutes with no drop in pressure. The mechanical inspector at his discretion may require the use of a recording device for a period of not less than 24 hours. All necessary apparatus for conducting test shall be furnished by the permittee. (e) Gas final. Final inspection of all installations shall be made after all piping covered by the permit has been installed, and after all portions thereof to be concealed by plastering or other covering have been so concealed, and after all nonportable gas appliances have been installed. A mercury test is required for a final gas inspection, even if a temporary gas inspection previously has been made. (f) Plumbing final. When all plumbing is complete, and the fixtures are installed and ready for service, a final inspection shall be requested for by the plumbing contractor. (g) Other plumbing inspections: (1) Landscape irrigation sprinkler systems. Shall be inspected as a final inspection with manifold area left exposed. (All other piping may be covered.) (2) Cross-connection control. Shall be provided in accordance with the provisions of the IPC and the city Backflow Prevention and Control Ordinance. The premises owner or responsible person shall have the backflow prevention assembly tested by a certified backflow assembly tester at the time of installation, repair, or relocation and at least on an annual schedule thereafter, or more often when required by the administrative authority. This includes the backflow device for a fire sprinkler system. (3) Temporary gas. Temporary use of gas is allowed during construction projects, with the building official's approval, when the following conditions are met. A need for the use must be shown. The gas piping shall pass a mercury or medium pressure piping test. All equipment being utilized during the time period must be completed and pass a safety inspection by the mechanical inspector. No additional equipment may be connected and used during this time period. Use is limited to three months without approval of extension by the building official. A partial inspection fee will be assessed for the inspection, at the time of request. Finally, a mercury or medium pressure gas test will be required with the final plumbing/mechanical inspection.

(Ord. No. 2478, § I, 11-17-08)

Ask a question about Las Cruces law

Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.