§ 96.03: REQUIREMENTS.

(A) Any person proposing to work in the right-of-way shall obtain a right-of-way use permit from the city. (1) For the purposes of this chapter work in the right-of-way shall include excavation, trenchless excavation, construction or any activity which might reasonably require barricading. Additionally, activities adjacent to the right-of-way which could reasonably be expected to encroach into the right-of-way, such as the storage of spoils from an excavation or parking of vehicles, or to otherwise affect the flow of traffic by causing visual distraction, such as unusual or large equipment or large groups of people, are also included. (2) Each person must obtain their own permit and have their own insurance and bonding. A subcontractor may not work under the general contractor’s permit. (3) Work included within a city approved subdivision, prior to the city’s acceptance of the subdivision, does not require a right-of-way use permit. (B) The permit application form and submittal requirements shall be in such form as prescribed by the Public Works Department for publicly funded capital projects, and by the Development Service Department for other work. (C) All work shall conform to federal, state and city ordinances, codes, design criteria and standards. In the case of conflicting requirements, the most stringent shall apply. (D) The permittee shall be responsible for the protection of the public as follows: (1) Appropriate traffic control per the MUTCD and approved by the city shall be utilized during the duration of the permit. (a) Traffic control plans shall be included with all permit submittals. (b) Traffic control plans shall be professionally produced utilizing appropriate computer software. Generic plans or hand drawn plans are not acceptable. (c) Traffic control plans shall be designed and drawn, using MUTCD standards, by a person certified in traffic control. Said person shall have a bona fide business presence in the greater Albuquerque/Rio Rancho metropolitan area, except as may otherwise be required by federal law (for projects funded by federal grants), and shall be certified by a training agency normally engaged in the business of traffic control training. (d) The city may require that revisions be made to proposed routes in order to cause as little inconvenience to the traveling public as possible. (2) Excavations shall not be left open at the end of a shift unless continuous shifts are planned. (a) Backfill, steel plate, security fencing and other safety options may be considered on a case-by-case basis by the city. (b) Barricades, warning tape and plastic fence are not acceptable alternatives. (3) Barricades shall be placed per the approved traffic control plan, by a certified traffic control technician. (a) Barricades shall not be placed on sidewalks, pedestrian or bike paths, or dedicated bike lanes unless said pathways are permitted to be closed. (b) Barricades, including supports, shall be moved outside the clear zone when not in use. (c) Inspection, preparation of shop drawings and record drawings, and reporting procedures shall be in accordance with the Department of Public Works procedures, the MUTCD and New Mexico Department of Transportation Standard Specifications for Highway and Bridge Construction, current edition. (d) The city will inspect barricading for compliance with approved traffic control plans and notify the permittee of discrepancies that must be corrected. (E) All flaggers shall be trained and certified by a training agency normally engaged in the business of flagger training. Flaggers must show certification cards on request. Approved safety wear is required. (F) The permittee shall be responsible for the utility location service, excavation (asphalt, concrete, other), backfill, compaction, surface replacement, testing, any necessary remedial work, and materials incorporated in the work. (G) To the extent any utility line spotting is required, right-of-way permit holders shall use the least intrusive method authorized by the City Engineer in compliance with state regulations. (H) The applicant shall provide a $10,000 bond and proof of insurance prior to approval of a right-of-way use permit. The purpose of this bond shall be to assure successful completion of the work required for the installation of the facility, should the applicant fail to comply with the plans and specifications of the permit. The city may also use this bond to correct any damage to existing infrastructure that is caused by the applicant. (1) The bond may be written for a single event, a specific duration or it may be evergreen. (2) The city reserves the right to request additional bonding should it be determined that the amount of the work or risk exceeds the capacity of the bond. (3) The bond shall be returned to the permittee upon successful completion of the work, as determined by the city. (4) This requirement is not in addition to the bonding/insurance requirements for a city capital improvement project. (I) Work hours shall be 9:00 a.m. to 3:00 p.m. on arterial classified roads and 7:00 a.m. to 5:00 p.m. on residential or collector classified roads, inclusive of setup and teardown of traffic control devices. (1) The city may authorize alternative work hours, if the scope of the work is such that the right-of-way cannot be reopened safely. (2) The applicant shall request the city’s determination on alternative work hours with the initial submission of the permit. (3) The city may require alternate hours, including nights or weekends, for operations that unduly disrupt traffic flows or represent potential safety hazards. (J) Roads less than five years old shall not be excavated or disturbed, including but not limited to any type of trenchless excavation, except for the repair of leaking wet utilities buried under the areas of the roadway or right-of-way where repair work is required. A list of roads which cannot be excavated or disturbed may be obtained from the City Engineer. (1) The City Manager may grant an exemption to this prohibition upon a recommendation of the City Engineer. (2) Any excavations or disturbances to roads less than five years old shall only occur at limited intervals and must be based upon a finding of good cause shown. (K) Any person doing work in the right-of-way involving the installation of infrastructure less than five years old shall use previously installed city conduit where available. The city is under no obligation to install conduit at any specific time or location nor is the city required to install conduit pursuant to any specific development. (L) The permittee shall maintain the work site in a clean and orderly manner. All debris, rubbish and excess material shall be removed from the right-of-way at the completion of each workday. (M) The permittee shall notify the city immediately upon completion of the work. (N) The city will provide any necessary inspections, during normal business hours, at no cost to the permittee. Should the permittee request inspections outside normal business hours, or should the city determine that such inspections are necessary to ensure public safety, the permittee will be responsible for paying the inspection cost, including overtime costs. (O) Except as otherwise expressly provided herein, all costs of complying with this chapter shall be borne by the applicant/permittee.

( Ord. 10-21 ; Am. Ord. 14-04 ; Am. Ord. 25-04 )