§ 96.04 — SPECIFIC CIRCUMSTANCES
Municipal Code, City of Rio Rancho, New Mexico (Code 2026-04-23) · Rio Rancho Municipal Code § 96.04
Corpus is an independent public-information project, not the official City of Rio Rancho website. Stable reference: corpuslaw.us/code/bb220915-4ffb-4b3d-bd18-4aa6cdb07c31
§ 96.04: SPECIFIC CIRCUMSTANCES.
Without limiting the generality of the foregoing, the following special circumstances require right-of-way use permits. The absence of mention in this section does not exempt an activity from the requirement to obtain a right-of-way use permit. (A) Right-of-way crossing. (1) Crossings shall not unreasonably interfere with or unduly impair the proper and safe use of the right-of-way or adjacent properties. (2) If a crossing is being proposed in conjunction with the construction of a new building or the remodel or renovation of an existing building, approval for the crossing shall be obtained prior to the city’s issuance of the building permit. The right-of-way permit must be obtained prior to starting construction of the crossing. (B) Curb cuts. If the proposed crossing includes a curb cut, the following shall apply: (1) Residential areas. (a) The minimum width of curb cuts shall be 12 feet and the maximum width shall be 36 feet. (b) A minimum of 22 feet of standing curb must remain between any two curb cuts on the same lot or single parcel of land or if more than one lot or parcel of land is being put to a single land use, then the requirement shall apply to the land use. (c) No double or circle drives shall be installed or maintained unless the property shall have a minimum of 60 feet frontage on the street affected thereby. (d) No curb cuts shall be closer than two and one-half feet from side property lines. (e) Corner property curb cuts shall be no closer to the intersecting street than either: (i) Twenty-five feet from the curb face of the intersecting street or extension thereof; or (ii) Ten feet from the property line of the intersecting street. (f) No dual frontage access (access to more than one street from a residential lot) shall be allowed. (g) No curb cuts shall be allowed as a secondary access from arterial roadways and will need approval by the city for collector roadways. (2) In all light traffic commercial areas, which shall include all office building or other commercial buildings not more than two stories in height, the gutter line width of curb cuts shall be a minimum of 12 feet and a maximum of 36 feet not including radii. All other requirements shall be the same as in residential areas. (3) In all heavy traffic commercial areas which include, but are not limited to, all drive-in type establishments, the gutter line width of curb cuts shall be a minimum of 20 feet and a maximum of 40 feet in width, not including radii, as justified after a complete study of traffic volume, pedestrian volume, one-way streets, and type of business making request. All other requirements shall be the same as in residential areas. (4) When conformance to the standards as set forth in this subsection would cause harm to the community or exceptional and undue hardship to any person, the city may vary design standards to the extent that substantial justice may be done. However, the relief may not be granted if it is detrimental to the public good or impairs the intent and purpose of this chapter or the desirable general development of the community. Any modification thus granted shall be entered in the records of the Development Services Department setting forth the reasons which justified the modification. (C) Emergency repair work. If the applicant calls New Mexico One-Call between 8:00 a.m. and 5:00 p.m., Monday through Friday (except city holidays), the right-of-way use permit application and associated traffic control plan must be submitted to the city prior to the start of work. For emergency repairs that require notification to New Mexico One-Call at any other time, the right-of-way permit application is due to the city by noon the following business day. (D) Persons who use the right-of-way for short duration operations, including but not limited to: landscaping/landscape maintenance, lifting with crane or boom truck, concrete delivery, concrete cutting, asphalt repair, utility repair, and utility locators using destructive methods, must obtain right-of-way use permits. The level of complexity required for traffic control will be commensurate with the duration of work and location of work as defined in the MUTCD. (E) Builders shall obtain right-of-way use permits for placement of construction dumpsters/drop boxes in the right-of-way. (F) Heavy haulers, persons proposing to drive non-street-legal construction equipment, and persons proposing to haul spoils, rock, debris, fill dirt or the like to or from an excavation or construction site shall obtain a right-of-way use permit. The city may dictate the haul route and the hours of operation for the haul. (1) All costs associated with the haul including moving and reinstalling existing structures and infrastructure shall be borne by the applicant. (2) Water wagons and scrapers are prohibited from being driven on paved roads. (G) Persons requesting special event permits pursuant to Section 154.83, R.O. 2003, must also obtain right-of-way use permits if their events affect the right-of-way. Satisfying the insurance and bonding requirements for the special event permit shall not relieve the applicant from meeting the requirements of this chapter. (H) Buried utilities. (1) The placement of buried utilities within the right-of-way shall be approved by the city prior to installation. (2) Non-city-owned utilities installed parallel to a roadway shall be located in the public utility easement. (3) Buried utilities shall cross the roadway at an angle of 90 degrees to the roadway centerline and shall use city installed conduit if available and if the roadway is under five years old. See Section 96.03(J). (4) Barrier devices shall be installed where necessary to protect surface components and the traveling public. (5) Where buried facility requires the removal or replacement of existing curbs, gutters or pavement surfaces, the same shall be replaced in accordance with the plans and specifications accompanying and made a part of the permit application. (6) The city may require that the utility be installed using boring or jacking methods. This requirement shall be based on considerations such as the type of roadway, traffic conditions, length of construction time, existing utilities or other conditions as relevant. (I) Persons proposing to install culverts or make other storm water management revisions in the right-of-way must obtain both the city’s approval for the work and a right-of-way use permit.
( Ord. 10-21 ; Am. Ord. 14-04 ; Am. Ord. 25-04 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.
