§ 96.05: RESTORATION.
(A) Any damage to existing infrastructure, landscape or structures within the right-of-way or properties adjoining the work shall be repaired to city standards by the applicant. This includes pavement damaged by dumpsters or construction drop boxes. (B) Work areas, including adjacent areas that were cleared/grubbed or damaged shall be stabilized and reseeded within 14 calendar days after the permit completion date. (C) All excavations within the right-of-way shall be backfilled with consecutive lifts not exceeding eight inches of loose material and shall be compacted to 95% of maximum density, plus two percentage points of optimum moisture content and shall be tested in accordance with ASTM D-1557. Excavations including potholes shall follow the city standard detail for restoration. (D) Pavement surfaces shall be tested in accordance with applicable testing methods based on the type of material to be placed. Whenever a pavement excavation, trenchless excavation, or disturbance is required, pavement shall be placed to create a neat true line. Width of pavement cut, excavation, trenchless excavation, or disturbance shall be sufficient to remove any broken or cracked pavement and wide enough to allow for the equipment required to obtain the required compaction. Edges of pavement cuts for asphalt concrete surfaces shall receive an application of tack coat prior to placing the new pavement. All asphalt patches shall be per the city’s utility patch detail. (E) Sidewalks, curbs, gutters or combination curbs and gutters shall be removed to nearest joint. All concrete used to replace curbs and gutters shall obtain a minimum compression strength of 3,000 psi at 28 days. Curbs and gutters shall be replaced to conform to the same shape, size and continuous gradient as existing curbs and gutters. (F) Testing. (1) The permittee shall submit all test results to the city within 14 calendar days of the date of completion of the test. (2) Right-of-way use permits will not be issued to persons who are delinquent in providing test results. (3) If test results show that the work was not compliant with city standards, the applicant shall repair and retest the work at no cost to the city. (G) The permittee shall warranty all restoration work to the city for a period of one year from completion and acceptance by the city. (H) If conformance is not attained, or the removal and restoration required by this section have not been completed within the required time, the city may perform the necessary removal and restoration at the cost of the work plus 10% to the person responsible (the utility or property owner, as the case may be). The city may then revoke or refuse to process future right-of-way permit requests by such owner until such time the costs associated with the removal and restoration are reimbursed in full to the city.
( Ord. 10-21 ; Am. Ord. 14-04 ; Am. Ord. 25-04 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.