§ 224A-8: Permitting requirements for Tier 3 solar energy systems.
A. All Tier 3 solar energy systems shall be permitted pursuant to the issuance of a special permit and site plan approval by the Planning Board in accordance with the standards and procedures set forth in City Code Chapter 267, Articles VI and VII, respectively. Tier 3 solar energy systems shall be exempt from certificate of appropriateness review and approval by the Architectural Review Board. Tier 3 solar energy systems shall be subject to the following additional special permit conditions: (1) Lot size: The property on which the Tier 3 solar energy system is placed shall be at least eight acres. (2) Setbacks: A Tier 3 solar energy system shall comply with the setback requirements of the underlying zoning district, and shall not be located in a front, side or rear yard setback. (3) Height: No structure can exceed 25 feet or two stories. (4) Underground requirements: All on-site utility lines shall be placed underground to the extent feasible and as permitted by the serving utility, with the exception of the main service connection at the utility company right-of-way and any new interconnection equipment, including without limitation any poles, with new easements and right-of-way. (5) Vehicular paths: Vehicular paths within the site shall be designed to minimize the extent of impervious materials and soil compaction. (6) Signage: (a) No signage or graphic content shall be displayed on the solar energy systems except for the manufacturer's name, equipment specific information, safety information, and twenty-four-hour emergency contact information. Said information shall be depicted within an area of no more than eight square feet. (b) As required by National Electric Code (NEC), disconnect and other emergency shutoff information shall be clearly displayed on a light reflective surface. A clearly visible warning sign concerning voltage shall be placed at the base of all pad-mounted transformers and substations. (7) Glare: All solar panels shall have anti-reflective coating(s). (8) Lighting: Lighting of the solar energy systems shall be limited to that minimally required for safety and operational purposes and shall be reasonably shielded and downcast from abutting properties. (9) Tree-cutting: Removal of existing trees is subject to the requirements of Chapter 252 of the City Code. No more than 30% of the existing trees on site can be removed for the installation of a Tier 3 solar energy system. Trees deemed to be invasive species and proposed for removal, shall be required to be mitigated at a ratio of one tree planted for every three trees removed. (10) Lot coverage: A Tier 3 solar energy system shall not exceed 50% of the lot on which it is installed. (11) Fencing requirements: All mechanical equipment, including any structure for storage batteries, shall be enclosed by an eight-foot-high fence with a self-closing and self-locking gate to prevent unauthorized access. (12) Screening and visibility: Applicants for Tier 3 solar energy systems shall be required to: (a) Conduct a visual impact assessment of the visual impacts of the solar energy system on public roadways and adjacent properties. At a minimum, a line-of-sight profile analysis shall be provided. Depending upon the scope and potential significance of the visual impacts, additional impact analyses, including for example a digital view-shed report, may be required to be submitted by the applicant. (b) Submit a screening and landscaping plan to show adequate measures to screen through landscaping, berms, grading, or other screening methods so that views of solar panels and Solar Energy Equipment shall be minimized as reasonably practicable from public roadways and adjacent properties to the extent feasible. (13) Decommissioning: (a) Solar energy systems that have been abandoned and/or not producing electricity for a period of one year shall be removed at the owner and/or operator's expense, which at the owner's option may come from any security made with the City as set forth herein. (b) A decommissioning plan signed by the owner and/or operator of the solar energy system shall be submitted by the applicant to the Building Department and Planning Board prior to the issuance of a Building Permit, addressing the following items, as well as any other materials required by the Planning Board: [1] The estimated cost of removing the solar energy system. [2] The time required to decommission and remove the solar energy system and ancillary structures. [3] The time required to repair any damage caused to the property by the installation and removal of the solar energy system. [4] Restoration landscaping plan to the condition that existed prior to the installation of the solar energy system. [5] Identify the party responsible for decommissioning. [6] Documentation of termination of lease (if applicable). [7] Document the removal of all operator-owned equipment, concrete, conduits, structures, fencing, driveways, and foundations. (c) Security: [1] The deposit, execution, or filing with the City Clerk of a cash, bond, or other form of security reasonably acceptable to the City's Department of Law, shall be in an amount sufficient to ensure the good faith performance of the terms and conditions of the permit issued pursuant hereto and to provide for the removal and restorations of the site subsequent to removal. The amount of the bond or security shall be 125% of the cost of removal of the Tier 3 solar energy system and restoration of the property with an escalator of 2% annually for the life of the solar energy system. The decommissioning amount shall be reduced by the amount of the estimated salvage value of the solar energy system. [2] In the event of default upon performance of such conditions, after proper notice and expiration of any cure periods, the cash deposit, bond, or security shall be forfeited to the City, which shall be entitled to maintain an action thereon. The cash deposit, bond, or security shall remain in full force and effect until restoration of the property as set forth in the decommissioning plan is completed. [3] In the event of default or abandonment of the solar energy system, the system shall be decommissioned as set forth herein. (14) Ownership changes. If the owner or operator of the solar energy system changes or the owner of the property changes, the special permit shall remain in effect, provided that the successor owner or operator assumes in writing all of the obligations of the special permit, site plan approval, and decommissioning plan. A new owner or operator of the solar energy system shall notify the Building Department of such change in ownership or operator within 30 days of the ownership change. Satisfactory proof that the decommissioning security is active and in place shall be submitted to the satisfaction of the City's Department of Law. (15) An approved fire apparatus access road is required to be constructed for all Tier 3 systems. (16) Applications for all Tier 3 systems shall incorporate, at a minimum, controls for water quality in accordance with City Code Chapter 226, Stormwater Management. Panels shall be considered impervious if they are not spaced a distance apart equal to the width of the panel or designed in general conformance with the NYSDEC solar panel Construction Stormwater Permitting/SWPPP Guidance. Runoff shall be reduced to reflect preexisting hydrological and hydraulic conditions to mimic forest conditions. (17) An annual inspection and monitoring report shall be submitted to the Building Department for Tier 3 systems by March 31 of a given calendar year. The report shall provide data from the previous calendar year (January to December) outlining power generated, number of users benefitting from the system, energy credits received, and estimated savings. In addition, the report shall provide photographic documentation of the installed system and any mitigation measures required as part of the approval.
Ask a question about Mount Vernon law
Corpus searches the Mount Vernon sections it holds and shows the ones that match, with their citations. Free, no sign-in.