§ 23-28 — Regulations for oil burners
Code of Ordinances of the City of Syracuse, New York (Supp. No. 41: codified through September 30, 2024) · Syracuse Code of Ordinances § 23-28
Corpus is an independent public-information project, not the official City of Syracuse website. Stable reference: corpuslaw.us/code/3efd1a8b-e3cf-4abf-972f-272a11a95e76
Sec. 23-28. - Regulations for oil burners.
The following regulations shall apply to oil burners [NOTE: These regulations do not apply to portable burners not requiring connecting [connection] to a flue, such as oil stoves, oil heaters and oil lamps equipped with a wick or mechanical device, the movement of which is essential to flame adjustments, or to such portable apparatus as blow torches, soldering pots, etc.]: A. Requirements. (1) In the determination of loads for the purpose of selecting oil burning rates, all heat dissipating devices shall be converted to equivalent direct radiation, btu per hour, or square inches of leader pipe area for gravity warm air systems. (2) One square inch of leader pipe area shall be equivalent to one hundred thirty-six (136) btu per hour. (3) Oil burners shall mean any device designed to burn fuel oil having a flash point of one hundred (100) degrees Fahrenheit or higher, and having a fuel tank or container with a capacity of more than ten (10) gallons connected thereto. (4) Oil burning equipment shall include oil burners and all tanks, piping, pumps, control devices and accessories connected to the burners. (5) Ratings: (a) Certified ratings will be used in determining ratings of heating boilers. (b) For warm air furnaces, ratings at registers shown in manufacturers' catalogues will be used. If ratings at registers are not shown, eighty-five (85) percent of bonnet ratings will be used. (c) Steel boilers—if not listed in manufacturers' catalogues—number, diameter and length of boiler tubes shall be given on application blank. (6) Total net load: Requirements of building to be heated plus any indirect load such as domestic hot water may be expressed in btu per hour, or square feet equivalent direct radiation. MINIMUM REQUIREMENTS— CONVERSION INSTALLATIONS B. Sizing of burners. (1) Steam and hot water: The burning rate of the burner in gallons per hour (G.P.H.) must not be less than that obtained from the following formula: G.P.H. = 0.35 R (A) in which R is expressed as steam radiation in hundreds of square feet. Value of R shall be determined as follows: (a) When the total net load is between fifty (50) percent and one hundred (100) percent of the boiler's certified hand fired rating, this rating of the boiler shall be used for R. (b) When the total net load is less than fifty (50) percent of the boiler's certified hand fired rating, R shall be equal to the total net load plus seventy (70) percent of the difference between this load and the above rating. (c) When the total net load is between one hundred (100) percent and one hundred twenty-five (125) percent of the boiler's certified hand fired rating, the total net load shall be used for R. NOTE: Applications may be rejected when the total net load exceeds one hundred twenty-five (125) percent of the boiler's hand fired rating. Permits for such installations may be issued upon the submission by application of such further supporting data as the division may require. (d) If the boiler is designed for mechanical firing and has no certified hand fired rating, the total net load shall be used for R provided it is between eighty (80) percent and one hundred (100) percent of the mechanically fired rating, and on eighty (80) percent of the mechanically fired rating provided the total net load is less than this amount. NOTE: Permits will not be issued for the installation of oil burners in boilers of this type if the total net load exceeds the mechanically fired rating. (2) Warm air: The burning rate of the burner in gallons per hour (G.P.H.) must not be less than that obtained from the following formulae: Gravity warm air— G.P.H. = 0.237 L (B) G.P.H. = 0.0153 H (C) Mechanical warm air— G.P.H. = 0.0147 H (D) In which L is expressed in hundreds of square inches of leader pipe and H in thousands of btu, L and H shall be determined as follows: (a) If the total net load is between fifty (50) percent and one hundred (100) percent of the hand fired rating of the furnace, the total net load shall be used for L or H. (b) If the total net load is less than fifty (50) percent of the hand fired rating of the furnace, the fifty (50) percent of rating figure shall be used for L or H. NOTE: Permits will not be issued for installations of conversion oil burners in warm air heating systems in which the total net load exceeds the mechanically fired rating of the furnace or the capacity of the warm air duct lines. C. Design of primary combustion chamber. (1) Plan area—at least 65 square inches per G.P.H. burner. (2) Radio length to width: (L/W) must be. At least 1.00 for burner atomization angles up to 60 degrees. At least 0.75 for burner atomization angles over 60 degrees. (3) Heights center of nozzle from floor of primary combustion chamber: (a) Pressure atomizing burners. Burning Rate G.P.H. | Center Line Nozzle to Floor 1.00— 1.35 ..... | 6" 1.36— 3.00 ..... | 7" 3.01— 4.00 ..... | 8" 4.01— 5.00 ..... | 9" 5.01— 7.50 ..... | 10" 7.51— 9.50 ..... | 12" 9.51—11.00 ..... | 13" 11.01—13.50 ..... | 14" 13.51—18.00 ..... | 15" (b) Horizontal rotary burners with secondary air through checker-work floor of combustion chamber. (If no secondary air, use table under pressure atomizing burners.) Burning Rate G.P.H. | Center Line Nozzle to Floor 2.1— 7.0 ..... | 8" 7.1—15.0 ..... | 10" 15.1—25.0 ..... | 12" 25.1—33.0 ..... | 14" 33.1—45.0 ..... | 16" 45.1—62.0 ..... | 20" (c) Vertical rotary burners—use manufacturer's specifications. D. Combustion volume. (1) Method of computation. (a) Determine the volume bounded by the furnace walls at the top of the primary combustion chamber and the center of the crown (or water grates, if not removed). (b) To this, add the volume of the primary combustion chamber. (2) Volume required. Not less than three (3) cubic feet for each gallon of oil to be burned per hour. (3) Bridge walls. Volume on burner side of bridge wall must be not less than seventy-five (75) percent of required total. E. Boiler and furnace burner units. Plans and specifications for all such units shall be approved by the engineer subject to manufacturer's written guarantee of compliance with all requirements of this chapter before a permit for installation will be granted. F. Draft. (1) Chimney—must be of sufficient area and height to provide a minimum draft of 0.04 inches of water in the primary combustion chamber when burner is operating at full load. (Use manufacturers' recommended sizes when available.) (2) Barometric dampers—recommended on all domestic and commercial installations. G. Special boilers and furnaces. The following equipment shall be installed only on the condition that it shall be designed with special attention given to elimination of causes and possibilities of emission of dense smoke, and installation of same shall include all servicing necessary for the proper regulation of smoke to comply with all provisions of these regulations: Vertical Boilers Water Tube Boilers Portable Boilers Contractors' Equipment Incinerators
Ask a question about Syracuse law
Corpus searches the Syracuse sections it holds and shows the ones that match, with their citations. Free, no sign-in.
