For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 52.05 — Reporting requirements

Code of Ordinances, City of Dayton, Ohio (Supp. No. 36: codified through Ordinance No. 32173-25, passed December 31, 2025) · Dayton City Code § 52.05

Corpus is an independent public-information project, not the official City of Dayton website. Stable reference: corpuslaw.us/code/7b0638e8-5561-4250-92ee-e9606a10f327

Sec. 52.05. - Reporting requirements.

I. Baseline monitoring report. (A) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4) (whichever is later) existing categorical users currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the Director a report that contains the information listed in Section 52.04(V). (B) At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the Director a report that contains the information listed in Section 52.04(V). (C) A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. The sampling requirements for initial compliance reports are equivalent to the sampling requirements for the baseline monitoring report. II. Reports on compliance with categorical pretreatment standard deadline (90-day compliance report). (A) Within 90 days following the date for final compliance by the "CIU with applicable pretreatment standards and requirements set forth in this chapter, in a wastewater discharge permit, the affected user shall submit to the Director a report containing the information outlined in Section 52.04(V)(D)—(F). (B) For users subject to equivalent mass or concentration limits established by the Director in accordance with procedures established in 40 CFR 403.6(c), this report shall contain a reasonable measure of the users long term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports shall be signed and certified in accordance with Section 52.04(VI). III. Periodic report on continued compliance (discharge monitoring report) and monitoring waivers. (A) Any user that is required to have an industrial waste discharge permit and performs self-monitoring shall submit to the Director during the months of June and December, unless required on other dates or more frequently by the Director, a report indicating the nature of the effluent over the previous reporting period. The frequency of monitoring shall be as prescribed within the industrial waste discharge permit. All users, except for zero discharge users, shall sample their discharge at least twice per year. (B) The report shall include a record of the concentrations (and mass if specified in the wastewater discharge permit) of the pollutants listed in the wastewater discharge permit that were measured and a record of all flow measurements (average and maximum) taken at the designated sampling locations, and shall also include any additional information required by this chapter or the wastewater discharge permit. Production data shall be reported if required by the wastewater discharge permit. Both daily maximum and average concentration (or mass, where required) shall be reported. All discharge monitoring reports shall be signed and certified in accordance with Section 52.04(VI). (C) If sampling and analyses are performed more frequently than required for any parameters required by the user's industrial wastewater permit, using test procedures prescribed by 40 CFR Part 136 or amendments thereto, or otherwise approved by EPA or as specified in the user's permit, at the designated sample location(s), then the results shall be reported to the Director. (D) Any user subject to equivalent mass or concentration limits established by the Director or by unit production limits specified in the applicable categorical standards, shall report production data as outlined in Section 52.05(II)(B). (E) Zero discharge users shall submit periodic reports as required by the Director stating that no categorical or otherwise regulated industrial waste has been discharged to the POTW. (F) If the Director calculated limits to factor out dilution flows or non-regulated flows, the user will be responsible for providing flows from the regulated process flows, dilution flows and non-regulated flows. (G) Flows shall be reported on the basis of actual measurement; provided, however, that the Director may accept reports of average and maximum flows estimated by verifiable techniques if the Director determines that an actual measurement is not feasible. (H) Sampling shall be representative of the user's daily operations and shall be taken in accordance with the requirements specified in Section 52.06. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (I) The Director may require reporting by users that are not required to have an industrial wastewater discharge permit if information or data is needed to establish a sewer charge, determine the treatability of the effluent or determine any other factor that is related to the operation and maintenance of the sewer system. (J) The Director may require self-monitoring by the user or, if requested by the user, may agree to perform the periodic compliance monitoring needed to prepare the periodic compliance report required under this section. If the Director agrees to perform such periodic compliance monitoring, it may charge the user for such monitoring, based upon the costs incurred by the city for the sampling and analyses. Any such charges shall be added to the normal sewer charge and shall be payable as part of the utility bills. The Director is under no obligation to perform periodic compliance monitoring for a user. (K) The Director shall require reporting by users with applicable standards that require compliance with a BMP or a pollution prevention alternative to provide documentation to determine compliance with the standard when submitting their periodic report on continued compliance. (L) The Director (at his/her discretion) may authorize an industrial user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the discharge or is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user. This authorization is subject to the following conditions: (1) The waiver may be authorized where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process wastewater. (2) The monitoring waiver is valid only for the duration of the effective period of the individual wastewater discharge permit, but in no case longer than five years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent individual wastewater discharge permit. (3) In making a demonstration that a pollutant is not present, the industrial user must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. (4) The request for a monitoring waiver must be signed by the authorized representative and include the following certification statement: "Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR _____ [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of _____ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report." (5) Non-detectable sample results may be used only as a demonstration that a pollutant is not present if the EPA approved method from 40 CFR Part 136 with the lowest minimum detection level for that pollutant was used in the analysis. (6) Any grant of the monitoring waiver by the Director must be included as a condition in the user's permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the Director for three years after expiration of the waiver. (7) Upon approval of the monitoring waiver and revision of the user's permit by the Director, the industrial user must certify on each report that there has been no increase in the pollutant in its wastestream due to activities of the industrial user. (8) In the event that a waived pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately comply with the monitoring requirements imposed by the Director and notify the Director (in writing). (9) This provision does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise specified in the categorical pretreatment standard. IV. Compliance schedules for meeting pretreatment standards. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M shall be established. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. (A) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g. hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (B) No increment referred to in subsection (A) of this section shall exceed nine months. (C) Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the Director including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports. V. Notification of significant production changes. Any user operating under a wastewater discharge permit incorporating mass or concentration limits based on production levels shall notify the Director within two business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not providing a notice of such anticipated change will be required to comply with the existing limits contained in its wastewater discharge permit. VI. Hazardous waste notification. (A) Any user that is discharging 15 kilograms of hazardous wastes as defined in 40 CFR 261 (listed or characteristic wastes) in a calendar month or any facility discharging any amount of acutely hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e) is required to provide a one time notification in writing to the city, EPA, and OEPA. Any existing user exempt from this notification shall comply with the requirements contained herein within 30 days of becoming aware of a discharge of 15 kilograms of hazardous wastes in a calendar month or the discharge of acutely hazardous wastes to the city sewer system. (B) Such notification shall include: (1) The name of the hazardous waste as set forth in 40 CFR Part 261; (2) The EPA Hazardous waste number; and (3) The type of discharge (continuous, batch, or other). (C) If an industrial user discharges more than 100 kilograms of such waste per calendar month to the sewer system, the notification shall also contain the following information to the extent it is known or readily available to the industrial user: (1) An identification of the hazardous constituents contained in the wastes; (2) An estimation of the mass and concentration of such constituents in the wastestreams discharged during that calendar month; and (3) An estimation of the mass of constituents in the wastestreams expected to be discharged during the following 12 months. (D) These notification requirements do not apply to pollutants already reported under the self-monitoring requirements. (E) Whenever the EPA publishes final rules identifying additional hazardous wastes or new characteristics of hazardous waste, a user shall notify the Director of the discharge of such a substance within 90 days of the effective date of such regulations. (F) In the case of any notification made under this paragraph, an industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. Discharging of hazardous waste to the sewer system is prohibited as per Section 52.03(II). VII. Report of potential problems (including accidental spills, slug discharges and/or slug loads). (A) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, a slug discharge or slug load, that may cause potential problems for the POTW, the user shall immediately telephone and notify the Director of the incident. This notification shall include the location of the discharge, type of waste, concentration, and volume, if known, and corrective actions taken by the user. (B) Within five days following such discharge, the user shall, unless waived by the Director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability that may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any assessments, penalties, or other liability that may be imposed pursuant to this chapter. (C) A report shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in paragraph A, above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure. VIII. Non-compliance reporting. (A) Industrial users shall submit such additional reports as the Director shall require. (B) If sampling performed by a user indicates a violation, the user shall notify the Director within 24 hours of becoming aware of the violation. The user shall also repeat the sampling within five days and submit the results of the repeat analysis to the Director within 30 days after becoming aware of the violation, except the user is not required to resample if: (1) The Director performs sampling at the user at a frequency of at least once per month; or, (2) The Director performs sampling at the user between the time when the user performs its initial sampling and the time when the user receives the results of this sampling. IX. Notification of changed conditions. (A) Each user shall notify the Director of any planned significant changes to the user's operations or system that might alter the nature, quality, or volume of its wastewater at least 90 days before the change. (B) The Director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under Section 52.04(V). (C) The Director may issue a wastewater discharge permit under Section 52.04(VII) or modify an existing wastewater discharge permit under Section 52.04(XI) in response to changed conditions or anticipated changed conditions. (D) For purposes of this requirement, significant changes include, but are not limited to, flow changes of 20 percent or greater, and the discharge of any previously unreported pollutants. X. Total toxic organics (TTO) reporting. (A) Categorical users that are required by EPA to eliminate and/or reduce the levels of total toxic organics (ITOs) discharged into the sewer system shall follow the categorical pretreatment standards for that industry. Those users shall also meet the following requirements: (1) Shall sample, as part of the initial application requirements, for the organics listed under the ITO limit reasonably expected to be present. (2) May submit a statement that no TTOs are used at the facility and/or develop a toxic organic management plan (TOMP) in lieu of continuously monitoring for TTOs, if authorized by the Director. (B) If allowed to submit a statement or develop a TOMP, the user shall routinely submit a certification statement as part of its self-monitoring report that there has been no dumping of concentrated toxic organics into the wastewater and that it is implementing a TOMP as approved by the Director. The Director may require the development and implementation of a TOMP in addition to monitoring for TTOs. XI. Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the city as the Director may require. XII. Record keeping. Users subject to the reporting requirements of this chapter shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this chapter and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method, and time of sampling and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or POTW, or where the user has been specifically notified of a longer retention period by the Director. XIII. Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. Reports received via facsimile (fax) will be credited as having been received on the date that the fax was successfully received by the POTW. Proof of successful transmission is the responsibility of the sending party. The original document shall be submitted to the Director as soon as possible after the fax transmission. XIV. Falsifying information. No person shall knowingly make any false statement, representation or certification in any application, record, report, plan, or other document filed or required to be maintained pursuant to this chapter, or falsify, tamper with, or knowingly render inaccurate any monitoring device or method used to determine compliance or extra-strength surcharge. XV. Electronic reporting. The city may develop procedures for receipt of electronic reports for any reporting requirements of this ordinance. Such procedures shall comply with 40 CFR Part 3. These procedures shall be enforceable under Section 52.08 of this chapter. Upon regulatory approval and at the Director's discretion, the city will accept electronic documents.

(Ord. 30739-08, passed 4-23-08; Ord. 32153-25, passed 8-6-25)

Ask a question about Dayton law

Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.