Sec. 52.06. - Sampling and analytical requirements.

I. Sampling Requirements for Users. (A) For Baseline Monitoring and 90-Day Compliance Reporting purposes, a minimum of four grab samples shall be used for pH, cyanide, total phenols, oil and grease, sulfide, and/or volatile organics. For Periodic Report on Continued Compliance reporting purposes, single grab samples shall be used for pH, hexavalent chromium, cyanide, total phenols, oil and grease, sulfide, and/or volatile organics. Except for those pollutants that are required to be measured by grab samples (referenced above), all other pollutants will be measured by flow-proportional sampling unless justification for an alternate sampling type, representative of the discharge, is documented in the industrial user file. Multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for hexavalent chromium, cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil & grease, the samples may be composited in the laboratory. Protocols (including appropriate preservation) specified in 40 CFR 136 and appropriate U.S. EPA guidance must be followed. For all other pollutants, 24-hour composite samples shall be obtained through flow-proportional composite sampling techniques. The city may require an industrial user to install flow monitoring facilities, instruments, and recording devices to enable accurate measurement of flows as determined to be necessary. The Director may waive flow-proportional composite sampling for any user that demonstrates that flow-proportional is not feasible. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. Industrial Users with applicable standards that require compliance with a BMP or a pollution prevention alternative shall submit documentation to determine compliance with the standard when submitting baseline or periodic compliance reports. (B) Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated or manufacturing process if no pretreatment exists or as determined by the Director and/or contained in the user's wastewater discharge permit. For categorical users, if other wastewaters are mixed with the regulated wastewater prior to pretreatment the user shall measure the flows and concentrations necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e) in order to evaluate compliance with the Applicable Categorical Pretreatment Standards. For other SIUs, for which the city has adjusted its local limits to factor out dilution flows, the user shall measure the flows and concentrations necessary to evaluate compliance with the adjusted pretreatment standard(s). (C) All sample results shall indicate the time, date and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges from the user. If sampling and analyses are performed more frequently than required for any parameters required by the user's Industrial Waste Permit, using test procedures prescribed by 40 CFR Part 136 or amendments thereto, or otherwise approved by EPA or as specified in the user's Permit, at the designated sample location(s) — then the results shall be reported to the Director. (D) If a violation is detected through sampling and analysis conducted by the city in lieu of the industrial user, the city shall perform the repeat sampling and analysis within 30 days of becoming aware of the violation. The city may notify the industrial user of the violation and may require the industrial user to perform the repeat sampling and analysis. II. Analytical Requirements. (A) All pollutant analyses, including sampling techniques, shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses shall be performed in accordance with procedures approved by the Director. Sampling methods, locations, times, duration, and frequencies are to be determined on an individual basis subject to approval by the Director. Users cannot use samples taken by the city to fulfill self-monitoring requirements. (B) When self-monitoring analyses are required of a user, the user may, upon approval of the Director, make arrangements with a laboratory, including that of the user, to perform such analyses. The measurements, tests, and analyses of the characteristics of wastewater required by this chapter shall be performed by a laboratory acceptable to the Director. III. City Monitoring of User's Wastewater. The Director will follow the same procedures as outlined in §§ 52.06 I and II. (A) The owner or occupant of any property serviced by a building sewer carrying industrial user wastewater discharges shall provide suitable access to the Director, and where deemed necessary by the Director, such meters, equipment and appurtenances in the building sewer to facilitate observation, sampling, and measurement of the wastewater. Such access shall be in a secure, readily and safely accessible location and shall be provided in accordance with plans approved by the Director. The access shall be provided and maintained at the owner's expense so as to be safe and accessible at reasonable times. (B) The Director shall consider such factors as the volume and strength of discharge, rate of discharge, quantities of toxic materials in the discharge, wastewater treatment facility removal capabilities, and cost effectiveness in determining whether or not access and equipment for monitoring industrial user wastewater discharges shall be required. The Director may dispense with discharge monitoring done for the sole purpose of determining wastewater surcharges when, in his or her sole discretion, he determines that such monitoring will not be cost effective.

(Ord. 30739-08, passed 4-23-08)