§ 1154.08 — PARCEL AND YARD REQUIREMENTS
Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1154.08
Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/0297f19f-450a-40ac-aed5-c12f17526398
1154.08 - PARCEL AND YARD REQUIREMENTS.
The following requirements shall apply in the TMD to the exclusion of those found in Chapter 1165: (a) Minimum Parcel Area. There shall be a minimum parcel area of fifteen (15) acres for Flagship Projects and a minimum parcel area of five (5) acres for Primary Projects. (b) Parcel Frontage. All parcels shall abut a public street, or may instead abut a private drive if either (i) an adjacent parcel or parcels is under common ownership and has frontage on a public street, or (ii) a legally binding perpetual vehicular access easement over adjacent property(ies) that are not under common ownership is placed of record with the office of the recorder in the county in which the parcel is located or will be of record prior to the issuance of a Planning and Design Permit for that parcel, as contemplated in Section 1154.10. (c) Parcel Width. All parcels shall have adequate width to provide for yards and distances as required by this chapter. (d) Setbacks from Public Rights-of-Way. The following minimum setbacks shall apply to developments that are adjacent to public rights-of-way unless otherwise specifically provided elsewhere in this chapter: (1) Principal Arterial Streets. Minimum three hundred (300) feet for pavement and five hundred (500) feet for buildings from the rights-of-way of Principal Arterial Streets, as identified in the City's Strategic Plan. A mound that is a minimum of six (6) feet in height and a maximum of eight (8) feet in height shall be provided within the required minimum pavement setback. Notwithstanding the foregoing, (A) the minimum pavement setback shall be reduced to two hundred (200) feet and the minimum building setback shall be reduced to four hundred (400) feet provided that a mound that is a minimum of ten (10) feet in height and a maximum of twelve (12) feet in height is provided within the required minimum pavement setback, and (B) the minimum pavement setback shall be reduced to one hundred (100) feet and the minimum building setback shall be reduced to three hundred (300) feet provided that a mound that is a minimum of thirteen (13) feet in height and a maximum of fifteen (15) feet in height is provided within the required minimum pavement setback. All mounds shall include plantings as detailed in the New Albany Technology Manufacturing District Landscape and Architecture Standards Plan that is contemplated in Section 1154.09. The mounding requirements of this subsection may be waived by the Community Development Director or his/her designee where existing tree stands or forested areas achieve similar or better screening as would be present with the mounding. Accessory structures such as security facilities, gate houses, security checkpoints, solar panels, and bus and shuttle transit stops and related improvements may be located as close as one hundred (100) feet of the rights-of-way for Principal Arterial Streets and to the front or rear of required mounding. (2) Major Collector, Other Public Streets, and Front Yards. Minimum twenty-five (25) feet pavement and fifty (50) feet building setbacks from (A) all rights-of-way other than those containing or planned to contain Principal Arterial Streets and (B) from any front property line that does not abut a public street right-of-way. (3) Construction Site Setup. For Flagship Projects, during any phases of construction there shall be a minimum one hundred fifty (150) foot setback for pavement, material laydown and storage tanks and a minimum two hundred-foot setback for trailers, structures, buildings, and related items necessary for the construction of improvements. All construction site setup areas within Flagship Projects shall be screened so that they are not visible from adjacent public street rights-of-way. (e) Side and Rear Yards. The required minimum setbacks from side and rear parcel lines which are not contiguous with a public street right-of-way shall be twenty-five (25) feet for buildings, structures, service areas, loading areas, and paved parking areas. (f) Residential Setbacks. Subject to the requirements in Section 1154.14(b), there shall be a one hundred-foot building and pavement setback from any district where residences are a permitted use. For Flagship Projects when the requirements of Section 1154.08(d)(1) do not apply, provided, however, that if a building exceeds sixty-five (65) feet in height, the minimum required building setback shall be three hundred (300) feet. The setback requirements in the immediately preceding sentence shall not apply when (i) the property located within the district where residences are a permitted use is under common ownership with the relevant property or (ii) the owner(s) of the property or properties that are protected by this minimum setback requirement sign an affidavit that waives this requirement, which shall be filed with the City. If two (2) contiguous properties have an intervening public street between them, they shall be considered to be abutting. (g) Interior Setbacks. There shall be a zero minimum building and pavement setback requirement from interior parcel lines when the parcels on each side of a parcel line are under common ownership. (h) Riparian Corridors. Development in the TMD shall comply with the provisions of Chapter 1155 unless expressly provided in this subsection (h). All streams with a drainage area greater than fifty (50) acres and their riparian corridors shall be preserved. The corridor width shall be a minimum of one hundred (100) feet, with at least twenty-five (25) feet on each side of the centerline of the stream. No pavement, structures, or other impermeable surfaces or improvements shall be permitted in riparian corridors, except for paved leisure trails, benches, and bridges. New vegetation shall be permitted to be planted within these corridors. (i) Maximum Parcel Coverage. There shall be a maximum impervious parcel coverage of eighty-five percent (85%) on parcels containing Flagship Projects and seventy-five percent (75%) on parcels containing Primary Projects. (j) Connectivity. Leisure trails shall be provided in accordance with the requirements in the New Albany Technology Manufacturing District Landscape and Architecture Standards Plan which is referenced in Section 1154.09. The requirements of Section 1165.06 shall not apply in the TMD. (k) Public Streets. The developer shall dedicate property to the City or other relevant political subdivision as necessary to provide a minimum of one hundred (100) feet of right-of-way for Principal Arterial Streets or Major Collector Streets, provided, however, that the minimum required right-of-way to be dedicated to the City or other political subdivision for a Major Collector Street may be reduced to eighty (80) feet if approved by the City Engineer. For public street typologies other than Principal Arterial Streets or Major Collector Streets, the developer shall dedicate property to the City or other relevant political subdivision as necessary to provide a minimum of sixty (60) feet of right-of-way. The property owner shall grant easements to the City which are adjacent to the aforementioned rights-of-way to the minimum extent necessary to provide for the installation and maintenance of streetscape improvements and/or utilities.
(Ord. O-46-2021. Passed 12-14-21; Ord. O-17-2025. Passed 5-6-25.)
Ask a question about New Albany law
Corpus searches the New Albany sections it holds and shows the ones that match, with their citations. Free, no sign-in.
