§ 1154.09 — DISTRICT LANDSCAPE AND ARCHITECTURE STANDARDS PLAN
Codified Ordinances of the City of New Albany, Ohio (Codified through Ordinance No. O-21-2026, enacted July 7, 2026. (Supp. No. 11, Update 1)) · New Albany Codified Ordinances § 1154.09
Corpus is an independent public-information project, not the official City of New Albany website. Stable reference: corpuslaw.us/code/947160fb-29c9-4bdd-bb7f-784e85023ebf
1154.09 - DISTRICT LANDSCAPE AND ARCHITECTURE STANDARDS PLAN.
(a) There is hereby adopted, and incorporated by reference, the New Albany Technology Manufacturing District Landscape and Architecture Standards Plan, as if set out at length herein [and available at the following link: https://municode.com/webcontent/15494/StandardsPlan.pdf]. The New Albany Technology Manufacturing District Landscape and Architecture Standards Plan is meant to minimize references to other sections of the Planning and Zoning Code. The requirements contained therein shall take precedence over and supersede all other regulations contained in the Codified Ordinances, other than those contained in this Chapter 1154. Without limiting the foregoing, the buffering and screening requirements of Section 1171.05 and 1171.06 shall not be required and Chapter 1175 shall not apply to the TMD. (b) Phasing of Screening: Unless otherwise specifically provided elsewhere in this chapter, required mounding and landscaping as required by the New Albany Technology Manufacturing District Landscape and Architecture Standards Plan shall be installed along the entirety of public street frontages and Residential Property (defined in 1154.14(b)) lines abutting the TMD concurrent with building construction unless construction of multiple buildings is phased, in which case required mounding and landscaping may be installed in phases. For each phase of development in the TMD, such required mounding and landscaping shall be installed when it is anticipated (as provided in plans associated with relevant permits) that buildings, paved parking areas, or above-ground equipment or utility infrastructure, once constructed within that phase, will be located within eight hundred (800) feet of the relevant perimeter boundary line. At a minimum for each phase, this mounding and landscaping shall be installed along the portion of the relevant perimeter boundary line of the relevant property between two (2) points which are determined by extending two (2) straight lines from the perimeter boundary line of the property to the furthest distance on each side where planned improvements are to be constructed in that phase, and then adjusting those lines so that they are an additional distance of one hundred fifty (150) [feet] apart. The following illustration is being provided as an example of this requirement: [image omitted; see the official code]
(Ord. O-46-2021. Passed 12-14-21; Ord. O-17-2025. Passed 5-6-25.)
Ask a question about New Albany law
Corpus searches the New Albany sections it holds and shows the ones that match, with their citations. Free, no sign-in.
