For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.06.150 — Fee Schedule

Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 16, § 16.06.150

Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/2bd2f6c1-7b09-4b81-8499-fc01897b1741

16.06.150 - Fee Schedule.

IRC Section R108.2 is hereby amended to read as follows: R108.2 Fee Schedule. A fee for each plan examination, building permit, and/or inspection shall be paid for any construction of new buildings, additions, alterations, or accessory structures and for the demolition of any building or structure in accordance with the following schedule: A. Residential Permit Fee .....$105.00 For each building permit (except storm shelters) and/or for each dwelling unit B. Building Inspection Fee for each dwelling unit .....$0.06/sf C. Plan Re-Reviews ($50.00 minimum) .....$0.06/sf D. Partial Inspections (All types) .....$50.00 ea E. Address Not Posted .....$25.00 ea F. Re-inspection Fees: (All types) ..... For defective or incomplete work 1. First re-inspection .....$50.00 2. Subsequent re-inspections (for same item) .....$100.00 G. Furniture Stocking Permit .....$0.05/sf H. Temporary Certificate of Occupancy (30 days) .....$75.00 After 90 days, .....$150.00 I. Swimming Pool Permit Fee .....$100.00 In ground or above ground - (diameter of 12′ or more and water depth of 2′ or more) J. Reserved. ..... K. Residential Demolition Permit .....$125.00 Demolition, raising or removal of any building or structure L. Drive approach, curb cut or sidewalk section .....$50.00 ea M. Residential Retaining Wall(s) Permit Fee .....$75.00 N. Safe Room or Storm Shelter Permit Fee .....$35.00 O. Distributed Generation Permit Fee .....$75.00 P. Construction Started Without Appropriate Permit(s)3 × Total Cost of Permit ..... Q. Tower Permit Fee .....$50.00 each Structure erected to support equipment (i.e., alternate power generation) but not to include cellular tower. R. Braced Wall Review Fee .....$75.00

(Ord. 3364, § 2, December 10, 2012; Ord. 3575, § 7, December 12, 2016; Ord. 3948, § 2, May 22, 2023; Ord. No. 3961, § 22, July 10, 2023; Ord. No. 4040, § 1, May 27, 2025).

Ask a question about Edmond law

Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.