§ 16.06.530 — Alternate Power Generation Equipment
Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 16, § 16.06.530
Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/a172dd1d-417c-471c-851e-fb2151291c0b
16.06.530 - Alternate Power Generation Equipment.
IRC Section R324 is hereby added to read as follows: R324 ALTERNATE POWER GENERATION EQUIPMENT R324.1 General. This section applies to the construction or installation of alternate power generation equipment when inter-connected to utility distribution systems or when constructed or installed as a standalone system. R324.2 Structure. Towers or structures constructed or erected to provide support for alternate power generation equipment shall meet Section 22.4.37 of the Edmond Municipal Code for height and location requirements. Plans for the tower or structure shall be prepared, signed and sealed by a design professional licensed in the State of Oklahoma. Inspections of tower or structure shall be performed by a third party approved by the building official. R324.3 Equipment. Equipment shall be listed by UL or another approved agency and shall be installed in accordance with the NFPA 70.
(Ord. 3364, § 2, December 10, 2012).
Ask a question about Edmond law
Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.