For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.16.130 — Fee Schedule

Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 16, § 16.16.130

Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/14ee2e44-4c85-4953-8023-4ca37205d227

16.16.130 - Fee Schedule.

NEC Annex H Article 80.19(E) is hereby amended to read as follows: 80.19(E) Fee Schedule: A. Temporary Construction Service Pole .....$30.00 each Only installed where active building permit is issued B. New Residential Construction (Detached single family dwellings, attached single family dwellings, duplex residences and multiple family dwellings) 1. Base Fee .....$90.00 + meter base cost a. 200 amp meter base, single phase .....$100.00 b. 200 amp meter base, three phase .....$240.00 c. 400 amp meter base, single phase .....$290.00 d. 400 amp meter base, three phase .....$400.00 e. 600 amp meter base, single phase .....$540.00 f. 600 amp meter base, three phase .....$977.00 Base Fee $90.00 + CT meter base cost + $100 for every 100 amps above 600 amps g. Single phase CT meter base .....$114.00 h. Three phase CT meter base .....$160.00 *CT rated services may require purchase of CT cabinet, confirm with electric utility C. Miscellaneous Residential Wiring 1. Cutover/Replace/Upgrade in service, same fee as in item B above 2. Branch circuit wiring only with no change in service equipment .....$50.00. D. New Commercial Construction (Including standalone services): 1. Base Fee .....$120.00 + meter base cost a. 200 amp meter base, single phase .....$100.00 b. 200 amp meter base, three phase .....$240.00 c. 400 amp meter base, single phase .....$290.00 d. 400 amp meter base, three phase .....$400.00 e. 600 amp meter base, single phase .....$540.00 f. 600 amp meter base, three phase .....$977.00 Base Fee $120.00 + CT meter base cost + $100 for every 100 amps above 600 amps g. Single phase CT base .....$114.00 h. Three phase CT base .....$160.00 *CT rated services may require purchase of CT cabinet, confirm with electric utility E. Miscellaneous Commercial Wiring 1. Cutover with upgrade in service, same fee as in item D above 2. Single Phase Cutover only .....$120.00 3. Three Phase Cutover only .....$150.00 4. Branch circuit wiring only with no change in service equipment .....$75.00 G. Miscellaneous Wiring Inspection Fees ..... 1. Mobile Home Service and Feeder Cable .....$50.00 For up to 200 ampacity, single phase service 2. Mobile Home Feeder Cable .....$25.00 From existing service equipment to mobile home sub panel 3. Swimming Pool .....$90.00 each Equipment bonding and all associated wiring from existing service equipment H. Partial Inspections (All types) .....$30.00 each I. Re-inspection Fees: For defective or incomplete work ..... 1. First re-inspection .....$50.00 2. Subsequent re-inspections (for same item) .....$100.00 For the installation or relocation of electrical equipment regulated by the NEC but not listed above. K. Construction Started Without Appropriate Permit(s) 3 × Total Cost of Permit

(Ord. 3364, § 2, December 10, 2012; Ord. 3948, § 6, May 22, 2023; Ord. No. 3961, § 64, July 10, 2023; Ord. No. 3988, § 1, 3-25-2024).

Ask a question about Edmond law

Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.