For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-6 — Code amended—International Building Code

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 9-6

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/6a676d30-9f33-4ba9-96f3-fd58d762b246

Sec. 9-6. - Code amended—International Building Code.

The building code adopted in section 9-5 is amended and modified in the following respects: 102.4.1 Conflicts. In the event two (2) or more codes conflict, the more restrictive code will apply. 104.1 Administrative and enforcement procedures. The regulations relating to building permits or certificates of occupancy shall be enforced by the Chief Building Official appointed by the City Manager. It shall be a violation of this Chapter for any person to change or permit the change in the use of land or buildings or structures or to erect, move, or improve any building or structure until a building permit or certificate of occupancy has been obtained under the conditions contained herein as set forth in this chapter. 104.2 Application for permit; when required. It shall be unlawful to construct, enlarge, alter or demolish a structure; or change the occupancy of a building or structure requiring greater strength, exit or sanitary provisions; or to change to another use without first filing an application with the Chief Building Official in writing and obtaining the required permit therefor. However ordinary repairs, as defined in Section 9-2, and which do not involve any violation of this Code, shall be exempt from this provision. The Chief Building Official may require every applicant for a building permit to furnish the following information: (a) A site plan, drawn to scale, showing the exact size and location on the lot of all existing buildings and structures, and the exact size and location on the lot of the structure or building proposed to be repaired, altered, erected or moved, and the size. (b) Additional information relating to the proposed improvement needed to determine compliance with these regulations. (1) A survey, prepared by an engineer or land surveyor registered in the State of Oklahoma, of the boundaries of the lot on which the improvement is proposed to be located. (2) A survey, prepared by an engineer or land surveyor registered in the State of Oklahoma, which shows the topographic characteristics of the site at a contour interval of not less than two (2) feet and also shows the exact size, shape, and dimensions of the lot to be built upon. (3) Or any other documentation as deemed necessary to the Chief Building Official to determine compliance with this code. Nothing contained herein shall modify or alter the requirements contained in Appendix A, Zoning. 105.2 Repairs and maintenance. Application or notice to the Chief Building Official is not required for ordinary repairs to structures, but such repairs shall not include the cutting away of any wall, partition or portion thereof; the removal or cutting of any structural beam or bearing support; the removal or change of any required means of egress; or the rearrangement of parts of a structure affecting the exit requirements; nor shall ordinary repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping; electric wiring; or mechanical or other work affecting public health or general safety. 105.10 Demolition permit requirements. A permit is required for the demolition of any building in excess of one hundred twenty (120) square feet. For residential demolition and all noncommercial buildings, the project shall commence within ten (10) days of issuance of permit and shall be completed and cleaned up within the next twenty (20) calendar days. For all other structures/buildings, the project shall commence within ten (10) days of issuance of a permit and shall be completed and cleaned up within the next forty-five (45) calendar days. Extensions may be granted by the Chief Building Official upon written request. Fee in Table located in Section 9-47. 107.3.1 Approved plans. (a) In addition, lot inspections required with the issuance of building permit. As one of the requirements for the issuance of a building permit, an applicant applying for said building permit on new structures shall be required to have an on-site meeting with a designated representative of the City. The applicant and designated city representative will discuss the drainage plan for the subject lot and what improvements will be needed to meet the requirements of the drainage plan, such as the installation of a retaining wall or any needed drainage improvements. Fee Table located in Section 9-47. 108.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit as contained in Table located in Section 9-47 shall be paid as required, in accordance with the schedule as established by the applicable governing authority. (a) Plan review fees: At the time an application for permit (commercial in Table located in Section 9-47) is submitted to the Chief Building Official it shall be paid and shall not be refundable. This fee shall be known as a plan review fee. The plan review fee shall be subtracted from the fee prescribed in this section when the permit is issued by the Chief Building Official. (b) For a permit for construction, alteration, remodel, or installation of a building or structure, shall pay the fee. The fee shall include the following: (1) Capital improvement fee; (2) Sidewalk fee; (3) Conversion from residential to commercial uses requires Capital improvement and Sidewalk fee; (4) Commercial Remodel requires Capital Improvement and Sidewalk fee; (5) New warehouse and agricultural requires Capital Improvement and Sidewalk fee; (6) Non-residential additions: The fee for a non-residential addition shall be the same fee as would be charged for new construction. (c) Accessory buildings, carports, patio cover, retaining walls and fences: (1) The fee for accessory buildings of two hundred fifty (250) square feet or less in area. (2) Accessory building greater than two hundred fifty (250) square feet in area but less than ten thousand (10,000) square feet in area. (3) The fee for accessory buildings more than ten thousand (10,000) square feet in area. (d) Miscellaneous inspections (no permit). (e) Reinspection fee. (f) Refunds: In the case of a revocation of a permit or abandonment or discontinuance of a building project, there shall be no refunds. 109.4 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be charged three times the normal rate as identified in the Table located in Section 9-47. If work was done in an emergency situation and permit has been applied for on the first business day following fee may be waived by the City Manager. 110.0 Certificate of occupancy (CO). (a) Certificate of occupancy; fee. See Table located in Section 9-47. No change shall be made in the use of any building until a certificate of occupancy is obtained from the Chief Building Official certifying: (1) That all the provisions of this Code are met; and (2) That all required federal and/or state permits or licenses have been issued and copies have been received by the City, unless otherwise required under federal or state law and all federal and/or state statutory and/or regulatory requirements have been met. (b) Whenever a building permit is issued for the erection of a new building or structure, an occupancy permit shall be required prior to being occupied. Any business operating without a valid certificate of occupancy shall be in violation of this section. Penalties include citations of seven hundred fifty dollars ($750.00) plus court cost, each day is a separate violation. If life safety issues are present as defined by the electrical and fire codes, the disconnecting of utilities to include water, electric and gas may also be used for enforcement. (1) The fee for all commercial or industrial certificates of occupancy for a new building or for a change in occupancy is set in Table located in Section 9-47. (c) A temporary CO will only be issued for a one time thirty-day period at the discretion of the Chief Building Official and only if all life, safety requirements have been met. All requirements of the final building inspection will be satisfied on or before the expiration date of this Temporary Certificate of Occupancy. Failing to obtain a permanent certificate of occupancy on or before the expiration date may result in citations and the disconnecting of utilities to include water, electric and gas. (d) One- and two-family residences are exempt from the requirements of this section; they are governed by the requirements of the International Residential Code. 113.1 Appeal process. An appeal may be taken to the Chief Building Official from any ruling, interpretation, requirement, or decision made by the building inspector, by filing within ten (10) business days from the building inspector's ruling, interpretation, requirement, or decision a statement in writing of the issues to be considered on appeal. The Chief Building Official shall review, within three (3) business days of receipt of appeal. The Chief Building Official shall issue a decision, in writing, and deliver the decision to the person who made the statement. If the Chief Building Official overturns the decision of the building inspector, no further appeal is necessary. If the Chief Building Official upholds the building inspector's decision, the appeal will proceed to the Trades' Advisory Board, as established in Section 9-48. The Trades' Advisory Board shall review the decision of the building inspector, the decision of the Chief Building Official, the statement filed and conduct a hearing within thirty (30) days of the decision of the Chief Building Official. In such matter appealed, the Trades' Advisory Board shall rule to uphold or overturn the Chief Building Official's decision. All decisions of the Trades' Advisory Board shall be in writing and issued to the Chief Building Official and the person who issued the written statement. Any appeal from a decision of the Trades' Advisory Board shall be to the City Council by filing the appeal request with the City Clerk. Any appeal to the City Council shall be filed within thirty (30) days of the date of the decision from the Trades' Advisory Board. The City Council shall hear the appeal at a regularly scheduled meeting and make a decision. Any appeal of the decision of the City Council shall be filed in the Oklahoma State District Court, for Oklahoma County. Any appeal shall be filed within thirty (30) days of the date of the decision from the Trades' Advisory Board.

(Ord. No. 3560, § 1, 4-23-24; Ord. No. 3591, § 1, 3-25-25)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.