For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-7 — Code amended—International Residential Code

Code of Ordinances of the City of Midwest City, Oklahoma (Codified through Ordinance No. 3615, enacted November 13, 2025. (Supp. No. 21)) · Midwest City Code of Ordinances § 9-7

Corpus is an independent public-information project, not the official City of Midwest City website. Stable reference: corpuslaw.us/code/6d4a465d-9e5d-4ea3-8d79-3acbde6a7c5a

Sec. 9-7. - Code amended—International Residential Code.

The residential code adopted in section 9-5(b) is amended and modified in the following respects: 102.4.1 Conflicts. In the event two (2) or more codes conflict, the more restrictive code will apply. 104.1 Administrative and enforcement procedures. The regulations relating to building permits or certificates of occupancy shall be enforced by the Chief Building Official appointed by the City Manager. It shall be a violation of this Chapter for any person to change or permit the change in the use of land or buildings or structures or to erect, move, or improve any building or structure until a building permit or certificate of occupancy has been obtained under the conditions contained herein as set forth in this chapter. 104.2 Application for permit; when required. It shall be unlawful to construct, enlarge, alter or demolish a structure; or change the occupancy of a building or structure requiring greater strength, exit or sanitary provisions; or to change to another use without first filing an application with the Chief Building Official in writing and obtaining the required permit therefor. However ordinary repairs, as defined in Section 9-2, and which do not involve any violation of this Code, shall be exempt from this provision. The Chief Building Official may require every applicant for a building permit to furnish the following information: (a) A site plan, drawn to scale, showing the exact size and location on the lot of all existing buildings and structures, and the exact size and location on the lot of the structure or building proposed to be repaired, altered, erected or moved, and the size. (b) Additional information relating to the proposed improvement needed to determine compliance with these regulations. (1) A survey, prepared by an engineer or land surveyor registered in the State of Oklahoma, of the boundaries of the lot on which the improvement is proposed to be located. (2) A survey, prepared by an engineer or land surveyor registered in the State of Oklahoma, which shows the topographic characteristics of the site at a contour interval of not less than two (2) feet and also shows the exact size, shape, and dimensions of the lot to be built upon. (3) Or any other documentation as deemed necessary to the Chief Building Official to determine compliance with this code. Nothing contained herein shall modify or alter the requirements contained in Appendix A, Zoning. 105.10 Demolition permit requirements. A permit is required for the demolition of any building in excess of one hundred twenty (120) square feet. For residential demolition and all non-commercial buildings, the project shall commence within ten (10) days of issuance of permit and shall be completed and cleaned up within the next twenty (20) calendar days. Fee in Table located in Section 9-47. 107.3.1 Approved plans. (a) In addition, lot inspections required with the issuance of building permit. As one of the requirements for the issuance of a building permit, an applicant applying for said building permit on new structures shall be required to have an on-site meeting with a designated representative of the City. The applicant and designated city representative will discuss the drainage plan for the subject lot and what improvements will be needed to meet the requirements of the drainage plan, such as the installation of a retaining wall or any needed drainage improvements. Fee in Table located in Section 9-47. 108.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the applicable governing authority. (a) Plan review fees: At the time an application for permit for any new structures is submitted to the Chief Building Official, shall be paid and shall not be refundable. This fee shall be known as a plan review fee. The plan review fee shall be subtracted from the fee prescribed in this section when the permit is issued by the Chief Building Official. See Table located in Section 9-47. (b) For a permit for construction, alteration, remodel, or installation of a building or structure, the fee shall be at the rate located in Section 9-47. They shall include the following: (1) Capital improvement fee; (2) Sidewalk fee. (c) Accessory buildings, carports, patio cover, retaining walls and fences: See Table located in Section 9-47 for fees for accessory building with dwelling capabilities regardless of size will be the same as Residential additions and include the capital improvement fee and sidewalk fee: Dwelling capabilities defined as having heat, plumbing and electrical. (1) The fee for accessory buildings of two hundred fifty (250) square feet or less in area. See Table located in Section 9-47. (2) Accessory building greater than two hundred fifty (250) square feet in area but less than ten thousand (10,000) square feet in area shall be. See Table located in Section 9-47. (3) The fee for accessory buildings more than ten thousand (10,000) square feet in area shall be. See Table located in Section 9-47. (d) Miscellaneous inspections (no permit): See Table located in Section 9-47. (e) Reinspection fee: See Table located in Section 9-47. (f) Refunds: In the case of a revocation of a permit or abandonment or discontinuance of a building project, there shall be no refunds. (g) Infill housing on city-owned property: The City Manager or designee may waive development fees associated with building infill housing on city-owned properties in order to support revitalization. (Development fees may include building permits, fence permits, drive permits and any other development related fees deemed applicable at the City Manager's discretion.) 109.4 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be charged three times the normal rate as identified in the Table located in Section 9-47. If work was done in an emergency situation and permit has been applied for on the first business day following fee may be waived by the City Manager. 110.0 Certificate of occupancy (CO). (a) Certificate of occupancy; fee. See Table located in Section 9-47. No change shall be made in the use of any building until a certificate of occupancy is obtained from the Chief Building Official certifying that all the provisions of this Code are met. (b) Whenever a building permit is issued for the erection of a new building or structure, an occupancy permit shall be required prior to being occupied. Any residence occupied without a valid certificate of occupancy shall be in violation of this section. If life safety issues are present as defined by the electrical and fire codes, the disconnecting of utilities to include water, electric and gas may also be used for enforcement. (c) A temporary CO will only be issued for a one time thirty-day period at the discretion of the City Manager due to extenuating circumstances. (d) Commercial classifications are exempt from the requirements of this section; they are governed by the requirements of the International Building Code as adopted in this Chapter. 112.1 Appeal process. An appeal may be taken to the Chief Building Official from any ruling, interpretation, requirement, or decision made by the building inspector, by filing within ten (10) business days from the building inspector's ruling, interpretation, requirement, or decision a statement in writing of the issues to be considered on appeal. The Chief Building Official shall review, within three (3) business days of receipt of appeal. The Chief Building Official shall issue a written decision that shall be delivered to the person who filed the statement. If the Chief Building Official overturns the decision of the building inspector, no further appeal is necessary. If the Chief Building Official upholds the building inspector's decision, the appeal will proceed to the Trades' Advisory Board. The Trades' Advisory Board shall review the decision of the building inspection, the decision of the Chief Building Official, the statement filed and conduct a hearing within thirty (30) days of the decision of the Chief Building Official. In such matter appealed, the Trades' Advisory Board shall rule to uphold or overturn the Chief Building Official's decision. All decisions of the Trades' Advisory Board shall be in writing and issued to the Chief Building Official and the person who issued the written statement. Any appeal from a decision of the Trades' Advisory Board shall be to the City Council by filing the appeal request with the City Clerk. Any appeal to the City Council shall be filed within thirty (30) days of the date of the decision from the Trades' Advisory Board. The City Council shall hear the appeal at a regularly scheduled meeting and make a decision. Any appeal of the decision of the City Council shall be filed in the Oklahoma State District Court, for Oklahoma County. Any appeal shall be filed within thirty (30) days of the date of the decision from the Trades' Advisory Board.

(Ord. No. 3560, § 1, 4-23-24; Ord. No. 3590, § 1, 3-25-25; Ord. No. 3591, § 2, 3-25-25)

Ask a question about Midwest City law

Corpus searches the Midwest City sections it holds and shows the ones that match, with their citations. Free, no sign-in.