§ 4.0.100 — Land For Public Purposes
Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 4.0.100
Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/f094059c-edd7-4e36-80c8-c2ef0dc771d9
Section 4.0.100 - Land For Public Purposes.
a. Easements for public facilities must be provided whenever they are located outside the right-of-way. Requirements are provided in facility master plans, the Engineering Standards and this Chapter. b. Utility easements with a minimum width of seven ft. must be granted to the public adjacent to all street rights-of-way for franchise utility installations. The Director may allow alternatives to this requirement with the concurrence of the City Engineer and affected utility companies. c. Where a development site is traversed by a drainageway or water course, improvements must be in accordance with the Storm Water Master Plan and the Natural Hazards, Minimum Assured Development Area (MADA), and Natural Resources provisions of Chapter 2.11 - Floodplain Development Permit, Chapter 4.2 - Landscaping, Buffering, Screening, and Lighting, Chapter 4.5 - Floodplain Provisions, Chapter 4.11 - Minimum Assured Development Area (MADA), Chapter 4.12 - Significant Vegetation Protection Provisions, Chapter 4.13 - Riparian Corridor and Wetland Provisions, and Chapter 4.14 - Landslide Hazard and Hillside Development Provisions. d. Where a Development Site is traversed by, or adjacent to, a future trail linkage identified in the Transportation System Plan or the Trails Master Plan, dedications of suitable width to accommodate the trail linkage must be provided. This width will be determined by the City Engineer, based on the appropriate standard for the type of trail facility involved. e. Where street, trail, utility, or other rights-of-way and/or easements in or adjacent to a Development Site are nonexistent or of insufficient width, dedications and/or easements meeting current standards will be required. f. Easements or dedications required in conjunction with Land Divisions must be recorded on the Final Plat. For developments not involving a Land Division, easements and/or dedications must be recorded on standard forms provided by the City Engineer. g. Environmental assessments must be provided by the developer (grantor) for all lands to be dedicated to the public or City. An environmental assessment must include information necessary for the City to evaluate potential liability for environmental hazards, contamination, or required waste cleanups related to the dedicated land. An environmental assessment must be completed prior to the acceptance of dedicated lands, in accordance with the following: 1. The initial environmental assessment must detail the history of ownership and past use of the land. Upon review of this information, as well as any site investigation by the City, the Director will determine if the risks of potential contamination warrant further investigation. If further site investigation is warranted, a Level I Environmental Assessment must be provided by the grantor, as described in "2," below. 2. Level I Environmental Assessments must include data collection, site reconnaissance, and report preparation. Data collection must include review of Oregon records, City and County fire department records, interviews with agency personnel regarding citations or enforcement actions issued for the site or surrounding sites that may impact the site, review of available historic aerial photographs and maps, interviews with current and available past owners of the site, and other data as appropriate. Reconnaissance must include walking reconnaissance the site to check for physical evidence of potentially hazardous materials that may impact it. Report preparation must summarize data collection and site reconnaissance, assess existing and future potential for contamination with hazardous materials, and recommend additional testing if there are indications of potential site contamination. Level I Environmental Assessment reports must be signed by a registered professional engineer. 3. If a Level I Environmental Assessment concludes that additional environmental studies or site remediation are needed, no construction permits will be issued until those studies are submitted and any required remediation is completed by the developer and/or owner. Additional environmental studies and/or required remediation is at the sole expense of the developer and/or owner. The City reserves the right to refuse acceptance of land identified for dedication if risk of liability from previous contamination is found.
(Ord. No. 2012-16, eff. 12-13-2012; Ord. No. 2021-22, eff. 11-24-2021; Ord. No. 2022-06, eff. 3-17-2022; Ord. No. 2022-12, eff. 6-1-2022; Ord. No. 2023-27, 6(Exh. A), eff. 2-28-2024)
Ask a question about Corvallis law
Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
