For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.0.90 — Franchise Utility Installations

Municipal Code of the City of Corvallis, Oregon (Codified through Ordinance No. 2026-31, enacted October 19, 2026. (Supp. No. 70, Update 2)) · Corvallis Land Development Code § 4.0.90

Corpus is an independent public-information project, not the official City of Corvallis website. Stable reference: corpuslaw.us/code/09e0358a-6f07-4367-b853-205a117f3e04

Section 4.0.90 - Franchise Utility Installations.

These standards are intended to supplement, not replace or supersede, requirements contained within individual franchise agreements that the City has with providers of electrical power, telecommunication, cable television, and natural gas services, hereafter referred to as Franchise Utilities. a. Where a Land Division is proposed, the developer must provide Franchise Utilities to the Development Site. Each lot or parcel must have an individual service available or secured prior to approval of the Final Plat, in accordance with Chapter 2.4 - Land Divisions, Replats, and Property Line Adjustments. b. Where necessary and in the judgment of the Director, Franchise Utilities must be extended through the site to the edge of adjacent property(ies) to provide for orderly development of adjacent properties. c. The developer must provide natural gas and cable television service to the Development Site, unless all of the following conditions exist: 1. Extension of Franchise Utilities through the site is not necessary for the future orderly development of adjacent property(ies); 2. The development site remains in one ownership and Land Division does not occur, with the exception of Land Divisions that may occur under the provisions of Section 4.0.60.d, above; and 3. The development is nonresidential. d. All Franchise Utility distribution facilities installed to serve new development must be placed underground except as provided below. 1. Poles for traffic signals, pedestals for police and fire system communications and alarms, pad-mounted transformers, pedestals, pedestal-mounted terminal boxes and meter cabinets, concealed ducts, substations, or facilities used to carry voltage higher than 35,000 volts; and 2. Overhead utility distribution lines may be permitted upon approval of the City Engineer when unusual terrain, soil, or other conditions make underground installation impracticable. Location of such overhead utilities must follow rear or side lot lines wherever feasible. e. The developer is responsible for making necessary arrangements with Franchise Utility providers for plans, timing of installation, and payment for services installed. Plans for Franchise Utility installations must be submitted together with plans for public improvements to facilitate review by the City Engineer.

(Ord. No. 2022-12, eff. 6-1-2022)

Ask a question about Corvallis law

Corpus searches the Corvallis sections it holds and shows the ones that match, with their citations. Free, no sign-in.