§ 12.50.620 — Public Utilities General Requirements

Municipal Code of the City of Hillsboro, Oregon (Codified through Ordinance No. 6513, adopted March 3, 2026 (Supp. No. 2)) · Hillsboro Community Development Code subch. 12.50, § 12.50.620

Corpus is an independent public-information project, not the official City of Hillsboro website. Stable reference: corpuslaw.us/code/a0ff30a3-fca6-4d7e-9774-0a6a6b9d2062

12.50.620 - Public Utilities General Requirements.

A. General Standards. 1. Adequate Utilities Required. The Review Authority shall condition a land use application approval to require provision of public water, sanitary sewer, communications, and storm drainage service adequate to serve the approved level of development in a manner that is consistent with Section 12.50.620.A.2. It is the applicant's burden of proof to demonstrate that adequate facilities and services are presently available or will be made available concurrent with development. The Review Authority may condition a development approval to extend, modify or replace an existing off-site public water, sanitary sewer, communications, or storm drainage facility or system to provide adequate public facilities or services in a manner that is consistent with Section 12.50.620.A.2. to the development site. 2. Compliance with Other Standards. Construction of all public water, sanitary sewer, communications, and storm drainage facilities and services shall comply with the D & C Standards, CWS standards or TVWD standards as applicable. 3. Service Provider Letters Presumed Correct. Service providers shall be presumed correct in the evidence which they submit relating to the adequacy and availability of facilities and services to the development. B. Public Utility Easements. 1. A land division approved under Section 12.80.090 shall be conditioned to require public utility easements (PUEs) for private utilities as approved by the City Engineer, consistent with the D & C Standards. 2. The Review Authority may condition approval of any Type I, Type II or Type III land use application, Zoning Review applications, and ELD Preliminary Plat applications to provide PUEs as approved by the City Engineer, consistent with the D & C Standards. 3. PUEs required under paragraphs 1 and 2 above shall be provided to and accepted by the City upon recording of a final plat or prior to occupancy if a final plat is not required. A required easement width specified in the D & C Standards may be reduced only with approval of the City Engineer, Building and Water Departments, and all affected utilities. C. Undergrounding Public Utilities. 1. Except as specified in Section 12.50.625, all public utility distribution and service connections shall be underground. D. Maintaining Angle of Repose. 1. Preliminary applications for developments proposing front setbacks less than 10 feet shall include utility plans showing horizontal and vertical locations of public and private utilities to demonstrate adequate angles of repose. 2. To assure that structural footprints are sited to provide adequate area for installation and maintenance of public and private utilities in compliance with City standards, the Review Authority may condition land use approvals to require additional setbacks or easement widths to assure adequate separation of utilities before and after construction. 3. Where additional setbacks or easements cannot be provided or acquired without significantly affecting the project design or reducing the buildable area, the Building Official may allow modifications to a structural foundation footing to reduce the angle of repose influence on an adjacent public utility easement. E. Utility Equipment in Urban Areas. 1. Location. Utility equipment in the following zones shall be located either within an underground vault or shall be screened and spaced as required by Subsections E.2 and E.3: a. SCC-DT Station Community Commercial — Downtown. b. Within the Orenco Town Center Plan District: SCC-SC Station Community Commercial — Station Commercial and SCR-V Station Community Residential — Village. c. All zones within the Amberglen Plan District. d. All zones within the Tanasbourne Town Center Plan. e. Within the South Hillsboro Plan District: along Active Use Streets 1 and 2 in the MU-VTC Mixed Use — Village Town Center. 2. Spacing. Above ground utility equipment shall be located away from any paved surfaces including public and private streets, driveways, and walkways to allow a minimum of 10 feet of clearance between the paved surface and the utility equipment in such a way that safety and system reliability is not compromised. 3. Screening. One or more of the following methods of screening shall be required for above ground utility equipment: a. Low walls that are a minimum of 6 inches taller than the vents, access doors, or utility equipment to be screened, and which are architecturally treated to match the other on-site walls and covered with vines with a minimum size of 5 gallons, spaced 10 feet on center or as otherwise approved by the Review Authority. Walls shall comply with all applicable zoning requirements. b. Landscaping that, upon installation, shall screen a minimum of 75% of the vents, access doors, or utility equipment from view. c. Artificial "rock" equipment that covers 100% of the utility equipment. These should be accented with natural boulders and landscaping. d. Locating the utility equipment within a building, as permitted by regulations. e. Locating the utility equipment in an alley or on the rear of the project. f. Any other screening option that may be available due to unique site or building design characteristics and that complies with Section 12.50.620.A.2.

(Ord. 6437 § 1, 2023; Ord. 6401 § 1, 2022; Ord. 6322 § 1, 2019; Ord. 6261 § 1, 2018; Ord. No. 6508, § 1 (Exh. A), 11-4-2025)

Ask a question about Hillsboro law

Corpus searches the Hillsboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.