For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1304.02 — Conceptual Stormwater Management Plan

Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Code § 1304.02

Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/bc848f3e-97e3-447d-ae30-37b5028e9fbc

§ 1304.02: Conceptual Stormwater Management Plan.

The following items shall be included in the Conceptual SWM Plan submission: a. Conceptual SWM Plan review application in accordance with requirements outlined in the City of Pittsburgh Stormwater Design Manual. b. Conceptual SWM Plan in accordance with requirements outlined in the City of Pittsburgh Stormwater Design Manual and containing the following information: 1. Applicant and project location information. 2. Preliminary base plans depicting existing conditions and lot lines. 3. Limits of earth disturbance. 4. Identification of proposed site improvements consistent with improvement shown on Zoning Site Plan submission, if applicable. 5. Identification of areas for proposed stormwater management BMPs, including locations, extent, and types of BMPs depicting conceptual footprints and volumes, discharge locations and safe overflow connections; and 6. Post-construction stormwater management BMP drainage areas delineating pervious and impervious cover. 7. Plan call outs and tabular information designating proposed stormwater volume control offsets, rate control points of interest, additional or enlarged BMPs qualifying for stormwater management volume or rate incentives, proposed BMPs targeted for innovation track approval, and accounting of points if preferred technology incentives are being requested. 8. Preliminary technical feasibility determination reports for any drainage areas for which the applicant intends to pursue in-lieu fee compliance. c. Documentation of proposed rainwater bonus goals and points in accordance with Title 9: Zoning, Chapter 915: Environmental Performance Standards, Section 915.07.D.5, if applicable.

[ Ord. No. 34-2021 , § 1, eff. 10-11-2021 ]

Ask a question about Pittsburgh law

Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.