For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1304.10 — Inspections and Testing

Pittsburgh Code of Ordinances, Pennsylvania (Code 2026-11-04: eCode360 publication current through legislation 2026-11-04 (scraped 2026-11-19)) · Pittsburgh Code § 1304.10

Corpus is an independent public-information project, not the official City of Pittsburgh website. Stable reference: corpuslaw.us/code/c0ca706f-c071-4a43-9941-474e848cd6b4

§ 1304.10: Inspections and Testing.

a. General. The Director of Permits, Licenses, and Inspections and their designee(s) are authorized to conduct such inspections as are deemed necessary to determine compliance with the provisions of this ordinance. Construction or work for which a permit is required shall be subject to inspection by the Director of Permits, Licenses, and Inspections and their designee(s), and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this ordinance or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this ordinance or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the Department of Permits, Licenses, and Inspection nor the City shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. b. Required Inspections and Testing. The Director of Permits, Licenses, and Inspections and their designee(s), upon notification from the permit holder or the permit holder's agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or an agent of any violations that must be corrected. 1. Pre-construction inspection shall be made to review scope of work, construction sequencing, and inspection schedule. This inspection may be waived by the Department of Permits, Licenses, and Inspections. 2. Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before any backfill is put in place. 3. Final inspection shall be made after the stormwater management system is complete and is ready for service. c. Other Inspections. In addition to the inspections specified above, the Director of Permits, Licenses, and Inspections and their designee(s) shall be authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this ordinance and other laws that are enforced. d. Inspection Requests. It shall be the duty of the holder of the permit or their duly authorized agent to notify the Director of Permits, Licenses, and Inspections or their designee(s) when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that is regulated by this ordinance. e. Approval Required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Director of Permits, Licenses, and Inspections and their designee(s). The Director of Permits, Licenses, and Inspections and their designee(s), upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this ordinance. Any portions that do not comply shall be corrected at the cost of the permit holder and such portion shall not be covered or concealed until authorized by the Director of Permits, Licenses, and Inspections and their designee(s). f. Approved Agencies. The Director of Permits, Licenses, and Inspections and their designee(s), at their discretion, is authorized to accept reports of approved inspection agencies, provided that such agencies satisfy the requirements as to qualifications and reliability. g. Special Inspections. Special inspections of alternative engineered design plumbing systems shall be conducted in accordance with the following: 1. Periodic Inspection. The registered design professional or designated inspector shall periodically inspect and observe the alternative engineered design to determine that the installation is in accordance with the approved construction documents, including approved SWM site plan, and this ordinance. Discrepancies shall be brought to the immediate attention of the permit holder for correction. Records shall be kept of all inspections. 2. Written Report. The registered design professional shall submit a final report in writing to the Director of Permits, Licenses, and Inspections and their designee(s) upon completion of the installation, certifying that the alternative engineered design conforms to the approved construction documents, including approved SWM site plan, and this ordinance. A final inspection shall not be authorized until a written certification has been submitted. h. Testing. Systems shall be tested as required in Section 1303.09. Tests shall be made by the permit holder and observed by the Director of Permits, Licenses, and Inspections and their designee(s). Equipment, material and labor required for testing an installed system or part thereof shall be furnished by the permit holder. i. Reinspection and Testing. Where any work or installation does not pass any initial test or inspection, the necessary corrections shall be made to comply with this ordinance. The permit shall then notify the Director of Permits, Licenses, and Inspections and their designee(s) to schedule inspection and testing. j. Approval. After the prescribed tests and inspections indicate that the work complies in all respects with this ordinance and approved construction documents, including approved SWM site plan, the Director of Permits, Licenses, and Inspections and their designee(s) shall grant a passed final inspection. 1. Revocation. The Director of Permits, Licenses, and Inspections and their designee(s) is authorized to, in writing, suspend or revoke a final inspection issued under the provisions of this ordinance wherever the notice is issued in error, or on the basis of incorrect information supplied, or where it is determined that the system or portion thereof is in violation of any provisions of this ordinance. k. Connection of Service Utilities. A person shall not make connections from a utility, water system or sewer system to any system that is regulated by this ordinance until authorized by the Director of Permits, Licenses, and Inspections and their designee(s).

[ Ord. No. 34-2021 , § 1, eff. 10-11-2021 ]

Ask a question about Pittsburgh law

Corpus searches the Pittsburgh sections it holds and shows the ones that match, with their citations. Free, no sign-in.