For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-173 — Standards for streams without established base flood elevations and floodways

Code of Ordinances, City of Columbia, South Carolina (Supp. No. 35: codified through Ordinance No. 2025-090, enacted October 28, 2025) · Columbia, S.C., City Code § 21-173

Corpus is an independent public-information project, not the official City of Columbia website. Stable reference: corpuslaw.us/code/7652895a-dd69-4ad9-8681-2df2f6219529

Sec. 21-173. - Standards for streams without established base flood elevations and floodways.

Located within the areas of special flood hazard established in section 21-127, where small streams exist but where no base flood data has been provided or where no floodways have been provided, the following provisions apply: (1) No encroachments, including fill material or structures, shall be located within a distance of the stream bank equal to five times the width of the stream at the top of the bank or 20 feet on each side from the top of the bank, whichever is greater, unless certification by a professional engineer is provided demonstrating that such encroachments will not result in any increase in flood levels during the occurrence of the base flood discharge. (2) New construction and substantially improved structures shall be elevated or flood proofed to elevations established in accordance with section 21-172(1) and (2) or the lowest floor (including basement) shall be elevated at least two feet above the highest adjacent grade. (3) Base flood elevation data shall be provided for subdivision proposals and other proposed development (including manufactured home parks and subdivisions) which is greater than the lesser of 50 lots or five acres. (4) Data from preliminary, draft, and final Flood Insurance Studies constitutes best available data. Refer to FEMA Floodplain Management Technical Bulletin 1-98 Use of Flood Insurance Study (FIS) Data as Available Data. If an appeal is pending on the study in accordance with 44 CFR Ch. 1, Part 67.5 and 67.6, the data does not have to be used. (5) When base flood elevation (BFE) data is not available from a federal, state, or other source one of the following methods may be used to determine a BFE For further information regarding the methods for determining BFEs listed below, refer to FEMA's manual Managing Floodplain Development in Approximate Zone A Areas: a. Contour Interpolation. 1. Superimpose approximate Zone A boundaries onto a topographic map and estimate a BFE. 2. Add one-half of the contour interval of the topographic map that is used to the BFE. b. Data extrapolation. A BFE can be determined if a site within 500 feet upstream of a reach of a stream reach for which a 100-year profile has been computed by detailed methods, and the floodplain and channel bottom slope characteristics are relatively similar to the downstream reaches. No hydraulic structures shall be present. c. Hydrologic and hydraulic calculations. Perform hydrologic and hydraulic calculations to determine BFEs using FEMA approved methods and software.

(Code 1979, § 6-12053; Ord. No. 2003-028, 5-7-03; Ord. No. 2015-046, 6-16-15; Ord. No. 2016-063, 8-2-16; Ord. No. 2017-090, 12-5-17)

Ask a question about Columbia law

Corpus searches the Columbia sections it holds and shows the ones that match, with their citations. Free, no sign-in.